Permit Information
Permit NumberBLD01-01147
StatusFinaled
Name VISSER CONSTRUCTION
Site Address 2781 E WARM SPRINGS AVE
Project NameFLOOD PLAIN
Customer Number 
ePlanReviewNo
Description
To construct a 5993 sq. ft. two story single family dwelling (3508 sq. ft. first floor/2485 sq. ft. second floor) with 672 sq. ft. of storage on the second floor (A SEPARATE PERMIT REQUIRE TO TURN INTO HABITABLE SPACE), a attached 1126 sq. ft. three car garage, a 598 sq. ft. covered front porch and a 234 sq. ft. covered back porch. Per approved plans, engineering and requirement list. THIS LOT IS WITHIN THE FLOODPLAIN AREA. A ELEVATION CERTIFICATE IS REQUIRED BEFORE CALLING FOR A ROUGH FRAMING INSPECTION. See requirement list for SPECIAL INSPECTION required. PC#358 (SAM)
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final5/13/20025/14/20025/14/2002APASS
DetailsTony Young
Scheduled by a contractor via Hello! on 05/13/2002 at 13:15:58. Contact: ###-####.
c of c issued 5/14/2002 1:00:54 PM
DOC - Permit Finaled5/14/20025/14/20025/14/2002PPASS
DetailsTony Young
Finaled by inspector at 5/14/2002 1:00:56 PM
BLD-Aging Inspection1/7/20021/7/20021/7/2002 PART
DetailsTony Young
wip 1/7/2002 9:41:51 AM
BLD-Energy code compliance11/5/200111/5/200111/5/2001PPASS
DetailsTony Young
Scheduled by a contractor via Hello! on 11/05/2001 at 08:45:24. Contact: ###-####.
BLD-Energy code compliance10/30/200110/31/200110/31/2001APART
DetailsTony Young
Scheduled by a contractor via Hello! on 10/30/2001 at 09:12:19. Contact: ###-####.
seal package ok 10/31/2001 12:12:31 PM
BLD-Framing/Rough-in10/31/200110/31/200110/31/2001PPART
DetailsTony Young
Added by Inspector: 415 On 10/31/2001 12:11:44 PM c/n posted, ok to insulate
BLD-Other9/21/20019/25/20019/25/2001PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 09/21/2001 at 16:38:37. Contact: ###-####. exterior sheer nailling ok for cover. 9/25/2001 2:10:23 PM
BLD-Framing/Rough-in8/28/20018/29/20018/29/2001APART
DetailsTony Young
###-#### shear
lower /main level nailing and foundation hold downs ok on exterior only 8/29/2001 11:54:25 AM
BLD-Framing/Rough-in8/27/20018/28/20018/28/2001ACANC
DetailsTony Young
###-#### shear--BOB HUNTER-CANCEL
BLD-Framing/Rough-in8/27/20018/28/20018/28/2001ANR
DetailsTony Young
###-#### shear
Override - Parcel Holds  8/27/2001  
BLD-Aging Inspection8/16/20018/16/20018/16/2001 PASS
DetailsTony Young
wip 8/16/2001 9:57:17 AM
BLD-Foundation6/14/20016/14/20016/14/2001PPART
DetailsTony Young
###-####
wip, verbal corrections 6/14/2001 1:37:04 PM
Override - Parcel Holds  6/14/2001  
BLD-Footing6/11/20016/11/20016/11/2001PPART
DetailsJim Sly
###-####
Override - Parcel Holds  6/11/2001  
Override - Parcel Holds  6/8/2001  
Override - Parcel Holds  6/8/2001  
Inspection Record Card- Bld  6/8/2001 DONE
Telephone call  6/8/2001 DONE
called permit ready
Override - Parcel Holds  6/8/2001  
Override - Parcel Holds  6/8/2001  
Issue PAID IN FULL permit  6/8/2001 DONE
Plan Review Report  6/8/2001  
Case Summary (BLD)  6/8/2001  
Case Summary (BLD)  6/7/2001  
Plan Review Report  6/7/2001  
PLANS/APPL TAKEN TO FRONT DESK  6/7/2001 DONE
Plan Reviewer's activity  5/29/2001 PEND
5/29/01 Talked to Scott Reading with ESsquared. He will get me new calculations for the lateral to match the plans. I told him that one of the conditions I'm going to put in is that Trus Joist will have to engineer and approved all there materials being used in the manner they are being used. We are sending everything through Brian with the Jarvis Group.
Plan Reviewer's activity  5/25/2001 PEND
5/25/01 15:00 I tried getting ahold of the engineer, Scott Reading. He won't be in till Tuesday May 29. I need him to look at load transfer and the brace panels.
Routing - PLANNING5/2/20015/2/20015/16/2001 PASS
karen rejected, needs complete legal showing easement and date prior to 1965
issue cleared up 5/16/01 aem
Routing - PUBLIC WORKS5/2/20015/2/20015/16/2001 PASS
Office Staff conference/action  5/7/2001 PASS
jim rich approved 5/2/2001, karen g rejected 5/7/2001 needs complete legal showing easement and date prior to 1965 .
Issue clear up 5/16/01 aem
Application received  5/2/2001  
jim rich approved, 5/2/2001 karen rejected 5/7/2001 need leagal showing easement and date prior to 1965
Routing - PLAN CHECK5/16/20015/16/2001  PEND
Pending Assignment by DJO5/2/2001   PEND
DetailsDan Overy