Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD01-01152
StatusFinaled
Name COLUMBIA VILLAGE STORAGE PHASE I
Site Address 4600 E GRAND FOREST DR
Project NameCOLUMBIA VILLAGE STOR.
Customer Number 
ePlanReviewNo
Description
Building # 1 * To construct a new 9,000 sq.ft. single story, Type II, nonrated, multi-rental space, storage facility. All construction per the approved plans, attached comment list and CABO/ANSI A117.1. Note: This permit includes on site grading and site development. DRH00-00154 CUP00-00066 PC#375-01 MJP
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Fee Review-notes5/2/20015/2/20015/15/2002 DONE
Permanent occupancy  2/19/2002 DONE
Perm. Occ. Cert. #9043 issued 2-19-02 to Columbia Village Storage, Phase I, Bldg. #1.
Permanent Occupancy 2/13/20022/13/2002 DONE
Details
BLD-Final2/13/20022/13/20022/13/2002PPASS
DetailsSteven Webb
fn insp ed -###-####
FIRE-Final Inspection2/6/20022/7/20022/7/2002APASS
DetailsRick Jackson
###-####
Code Occupancy Approval  2/5/2002 PASS
BLD-Framing/Rough-in1/25/20021/28/20021/28/2002APASS
DetailsSteven Webb
###-#### ED Framing and 1-hr wall-- 1/28/2002 9:56:45 AM
BLD-Other1/22/20021/23/20021/23/2002APART
DetailsSteven Webb
Scheduled by a contractor via Hello! on 01/22/2002 at 17:27:00. Contact: ###-####. Building #1--ext. 1-Hr not interior 1/23/2002 10:23:18 AM
BLD-Aging Inspection12/5/200112/5/200112/5/2001 PART
DetailsSteven Webb
wip 12/5/2001 12:14:23 PM
Plan Reviewer's activity  11/13/2001 PASS
Parcel hold removed office must be completed prior to issuance of certificate of occupancy.
BLD-Concrete10/4/200110/4/200110/4/2001PPART
DetailsSteven Webb
###-####- ed concrete- ed has additional special insp on site
Override - Parcel Holds  10/4/2001  
Override - Parcel Holds  10/4/2001  
BLD-Concrete10/1/200110/2/200110/2/2001APART
DetailsSteven Webb
###-#### ed \\special insp
Override - Parcel Holds  10/1/2001  
Override - Parcel Holds  10/1/2001  
BLD-Foundation9/20/20019/21/20019/21/2001ADONE
DetailsSteven Webb
###-#### ED speical inspection 9/21/2001 12:11:34 PM
BLD-Footing8/30/20018/30/20018/30/2001PPART
DetailsSteven Webb
ed ###-#### ok to pour 75% of retaining wall. 8/30/2001 1:08:37 PM
Override - Parcel Holds  8/17/2001  
Override - Parcel Holds  8/17/2001  
Issue PAID IN FULL permit  8/17/2001 DONE
Telephone call  8/16/2001 DONE
left mess that permit is ready
Override - Parcel Holds  8/13/2001  
Override - Parcel Holds  8/13/2001  
Inspection Record Card- Bld  8/13/2001 DONE
Print Occupancy Form  8/13/2001 DONE
Plan Reviewer's activity  8/10/2001 PASS
Override - Parcel Holds  8/10/2001  
Override - Parcel Holds  8/10/2001  
Print Pending Permit.LaserJet4  8/10/2001 DONE
PLANS/APPL TAKEN TO FRONT DESK  8/10/2001 DONE
Case Summary (BLD)  8/10/2001 DONE
Routing - PLAN CHECK7/23/2001 8/10/2001 DONE
Plan assigned to (M_P)5/3/2001 8/10/2001 PASS
DetailsMike Phillips
8/10/2001 14:28:39 M_P - activity updated through activity BLDA022 from case BLD01-01152.
Routing - PUBLIC WORKS8/9/2001 8/9/2001 PASS
Routing Off Site - STRUCTURAL7/30/2001 8/8/2001 PASS
Sent plan resubmitals to consultanting engineer via PDQ. 7/30/011 DAR
Routing Off Site - STRUCTURAL8/1/2001 8/8/2001 PASS
Sent plan resubmittals to consultanting structural engineer via PDQ. 8/1/01 DAR
Routing - PUBLIC WORKS8/3/2001 8/6/2001 FAIL
Requires drainage plan revision per Brian Murphy. 8/6/01 DAR
Plan resubmittals received  8/1/2001 DONE
Received three sets of plan resubmittals from Glancy/Rockwell Architects, forwarded same to Mike Phillips. 8/1/01 DAR
Plan Reviewer's activity  7/31/2001 FAIL
Additional information required for further review and waiting for outside structural review report. Called and talked to architect about concerns. Put parcel hold on project until house plans have been approved.
Plan resubmittals received  7/31/2001 DONE
Received one set of plan resubmittals from Glancy/Rockwell Architects. Forwarded same to Mike Phillips. 7/31/01 DAR
Routing - PLANNING7/19/2001 7/23/2001 PASS
Approved per DRH01-00108.
Plan resubmittals received  7/13/2001 DONE
Received two sets of plan resubmittals and two sets of pre-engineered buildings drawings plus small documents, forwarded same to Mike Phillips. 7/13/01 DARb b .
Plan Review Completed(1st rev)  6/22/2001 FAIL
Routing - FIRE6/19/2001 6/22/2001 PASS
Routing - PLAN CHECK5/22/2001 6/20/2001 FAIL
Routing to fire.
Plan Reviewer's activity  6/20/2001 FAIL
Additional information required for further review.
Plan resubmittals received  6/11/2001 DONE
Two sets of plan resubmittals received plus small document, frim /Glancy/Rockwell Architects, forwarded same to Mike Phillips. 6/11/01 DAR
Routing Off Site - STRUCTURAL5/3/2001 6/4/2001 FAIL
contacted PDQ to take plans to outside eng. KMM
Additional information required for further review. MJP 6/4/01
Plan Reviewer's activity  6/4/2001 FAIL
Requested additional information about area separation walls, building layout and certificate of value for each building and each side of area separation walls. Waiting for additional information to be submitted prior to routing plans to fire department.
Routing - PLUMBING5/17/2001 5/22/2001 PASS
additional cross connection protection may be required
Routing - PLANNING5/15/2001 5/17/2001 PASS
Applicant needs to submit a modification to DRH00-00154. Have contacted the applicant. Approved per DRH01-00108.
Routing - PUBLIC WORKS5/3/2001 5/15/2001 FAIL
Requires Drainage Plan revision per Brian Murphy. And a street light plan per Bill Colson 5/15/01 DAR
Plan routing begun/NEW & ADDTN  5/3/2001 DONE
Plans ACCEPTED BY PLAN TECH  5/3/2001 DONE
Received Certificate of Value  5/2/2001 DONE
Application received  5/2/2001  
Recd Pcfee & Taken To Pln CK  5/2/2001