Permanent occupancy | | | 6/17/2002 | | DONE |
|
|
|
Perm. Occ. Cert. #9174 issued 6-17-02 to Masco, Inc.
|
Permanent Occupancy | | 6/12/2002 | 6/12/2002 | | DONE |
|
|
|
|
Fee Review-notes | 5/4/2001 | 5/4/2001 | 1/29/2002 | | DONE |
|
|
|
|
FIRE-Final Inspection | 12/4/2001 | 12/4/2001 | 12/4/2001 | A | PASS |
Troy Cobbley
|
|
|
Added by Inspector: 430 On 12/4/2001 11:32:33 AM Fire life/safety finaled. Fire door inspected and checked out OK
|
Temporary occupancy | | | 12/4/2001 | | PART |
|
|
|
Temp. Occ. Cert. #4673 issued 12-4-01 to Masco, Inc.
|
BLD-Final | 11/30/2001 | 12/3/2001 | 12/3/2001 | A | PART |
Jim Storey
|
|
|
###-#### LARRY temp occ ok pending p&z and ele perm sign off bond in place for landscaping. 12/3/2001 5:09:20 PM
|
FIRE-Supply Line Flush | 11/9/2001 | 11/13/2001 | 11/13/2001 | A | PART |
Troy Cobbley
|
|
|
Supply line flush and hydro OK 11/13/2001 10:39:13 AM
|
BLD-Framing/Rough-in | 11/9/2001 | 11/13/2001 | 11/13/2001 | A | PASS |
Jim Storey
|
|
|
CEILING GRID ###-#### LARRY ceilling ok for cover. 11/13/2001 8:56:01 AM
|
BLD-Framing/Rough-in | 11/5/2001 | 11/6/2001 | 11/6/2001 | A | PART |
Jim Storey
|
|
|
###-#### LARRY CEILING GRID perimitor rooms ok for cover main ceilling pending ele approval as wel as approval from fire for all ceilling. 11/6/2001 9:13:19 AM
|
BLD-Framing/Rough-in | 11/6/2001 | 11/6/2001 | 11/6/2001 | P | PART |
Jim Storey
|
|
|
overhead inspection ###-#### ceilling ok pending others. 11/7/2001 8:18:25 AM
|
FIRE-Sprinkler Rough-in | 11/2/2001 | 11/5/2001 | 11/5/2001 | A | FAIL |
Troy Cobbley
|
|
|
approved plans not on site 11/5/2001 9:22:37 AM
|
BLD-Framing/Rough-in | 11/1/2001 | 11/2/2001 | 11/2/2001 | A | FAIL |
Russ Owen
|
|
|
###-#### LARRY CEILING GRID. perimeter wires needed and lights not in place. 11/2/2001 10:56:36 AM
|
BLD-Framing/Rough-in | 10/16/2001 | 10/16/2001 | 10/16/2001 | P | PASS |
Jim Storey
|
|
|
###-#### fire gyp on mez ok for lap and nailling. 10/17/2001 11:52:48 AM
|
BLD-Framing/Rough-in | 10/1/2001 | 10/2/2001 | 10/2/2001 | P | PASS |
Jim Storey
|
|
|
###-#### office ok. 10/3/2001 9:07:14 AM
|
BLD-Framing/Rough-in | 9/25/2001 | 9/26/2001 | 9/26/2001 | A | PART |
Jim Storey
|
|
|
###-#### LARRY ROOF DECK INSPECTION roof deck welding rfi to engineer for perimitor weld north and south walls west end of roof deck reweld atchment and sheer configuration perplan un noted. 9/26/2001 10:15:49 AM
|
BLD-Concrete | 8/28/2001 | 8/29/2001 | 8/29/2001 | P | PASS |
Jim Storey
|
|
|
###-#### MIKE ft at col. special insp. / reviewed roof erection in process tilt panels weld and back pour ok for cover/ recieved engineer office beam modifaction approved and archived to city. 8/30/2001 9:10:12 AM
|
BLD-Concrete | 8/17/2001 | 8/20/2001 | 8/20/2001 | A | PART |
Jim Storey
|
|
|
larry ###-#### concrete west ft cover with special insp. not ready at this time added to scope of special./ engineering change for #6 barto be relayed to my self to place at ft not epoxy. 8/20/2001 10:11:27 AM
|
BLD-Concrete | 8/15/2001 | 8/16/2001 | 8/16/2001 | P | PASS |
Jim Storey
|
|
|
retilt bar insp larry- ###-#### rebar ok pending special insp.report. 8/16/2001 4:34:40 PM
|
BLD-Concrete | 8/14/2001 | 8/14/2001 | 8/14/2001 | A | PASS |
Jim Storey
|
|
|
Added by Inspector: 301 On 8/14/2001 8:24:34 AM c/n made ok rebar ok for colm design and top chord.
|
BLD-Concrete | 8/10/2001 | 8/13/2001 | 8/13/2001 | P | FAIL |
Jim Storey
|
|
|
rebar in the tilt walls Larry ###-####c/n no seperation of steel mats at top 1/3 vert steel above door openings. 8/13/2001 4:43:33 PM
|
BLD-Foundation | 7/25/2001 | 7/26/2001 | 7/26/2001 | P | PART |
Jim Storey
|
|
|
###-#### placed with out city insp on walls office foundation/ pending special insp. report all though no reqired per plan. 7/26/2001 3:17:04 PM
|
BLD-Footing | 7/23/2001 | 7/23/2001 | 7/23/2001 | P | PASS |
Jim Storey
|
|
|
###-#### ft ok 7/23/2001 3:13:40 PM
|
(F) Reprint permit | | | 7/23/2001 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 7/20/2001 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 7/18/2001 | | 7/19/2001 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/19/2001 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 7/19/2001 | | DONE |
|
|
|
|
Print Occupancy Form | | | 7/19/2001 | | DONE |
|
|
|
|
Telephone call | | | 7/19/2001 | | DONE |
|
|
|
TALKED TO TRENT TO VERIFY PLANS ARE READY
|
Plan assigned to (MLO) | 5/7/2001 | | 7/19/2001 | | PASS |
Mike Otto
|
|
|
7/19/2001 10:21:59 MLO - activity updated through activity BLDA022 from case BLD01-01181.
|
Routing - FIRE | 7/13/2001 | | 7/18/2001 | | PASS |
|
|
|
|
Routing - PLUMBING | 7/18/2001 | | 7/18/2001 | | PASS |
|
|
|
PUMP STATION TO BE PROVIDED WITH DUPLEX PUMPS, ROUT INTERCEPTOR DISCHARGE TO SEWER, PROVIDE A C.O. EVERY 100 FEET, NO ABS UPSTREAM OF INTERCEPTOR.
|
Routing - PUBLIC WORKS | 7/11/2001 | | 7/13/2001 | | PASS |
|
|
|
Requested by Louise
|
Routing Off Site - STRUCTURAL | 7/12/2001 | | 7/13/2001 | | PASS |
|
|
|
Sent to consultanting engineer via PDQ. 7/12/01 DAR
|
Plan resubmittals received | | | 7/12/2001 | | DONE |
|
|
|
Received plan resubmittals from BRS Architects 1 sheet S7.1 and P-1 forwarded same to Mike Otto. 7/12/01 DAR
|
Routing - FIRE | 7/9/2001 | | 7/11/2001 | | FAIL |
|
|
|
STILL NEED HM & FLM LIQ INVENTORY
|
Routing - PUBLIC WORKS | 6/25/2001 | | 7/9/2001 | | FAIL |
|
|
|
To Fire
Requires drainage plan revision. Per Brian M. KMM
|
Plan resubmittals received | | | 6/26/2001 | | DONE |
|
|
|
Received two copies of revised clouded sheets SD-1, SD-2, S7.1, A-1, A-1.2, A-4, A-5, A-6, M-1, M-2, P-1. One of the A-6 sheets was not signed. Contacted Trent of this need to get one to Mike as soon as possible. One copy of written response to plan check comments. Two copies of revised structural calculations dated 6/15/01. One copy of product specifications for skylight. One copy of memo to fire dept. and msds for hazardous stored liquids. Routed all of above to Mike O. KMM 6/26/01 PM recieved stamped and signed A-6 sheet. Routed to Mike O. KMM
|
Plan resubmittals received | | | 6/22/2001 | | DONE |
|
|
|
Received two copies of revised sheets C-1, C-3, C-4, one copy of cover letter and one copy of GPGS information. Routed to Mike O.
|
Routing - FIRE | 6/11/2001 | | 6/13/2001 | | FAIL |
|
|
|
hydrant location, water flow, hm inventory, flam liq inventory, plans returned to plan review
|
Plan Review Completed(1st rev) | | | 6/13/2001 | | FAIL |
|
|
|
plans returned to plan review
|
Routing - PLAN CHECK | 5/31/2001 | | 6/11/2001 | | FAIL |
|
|
|
corrections faxed and mailed to architect
|
Routing Off Site - STRUCTURAL | 5/7/2001 | | 6/11/2001 | | FAIL |
|
|
|
Sent engineering plans to consultanting engineer via PDQ.5/7/01 DAR
|
Plan resubmittals requested | | | 6/11/2001 | | FAIL |
|
|
|
UBC structural and non-structural corrections
|
Routing - PLUMBING | 5/23/2001 | | 5/31/2001 | | FAIL |
|
|
|
provide a plan showing sewer pump stationlocation and detail, verify shop floor drainage requirements with structural plan review and provide a plan showing drainage to a flammable liquids interceptor if required, verify wash rack drainage to drainage swale with brian murphy, public works.
|
Routing - PLANNING | 5/16/2001 | | 5/23/2001 | | PASS |
|
|
|
Approved per drh00-00256.
|
Routing - PUBLIC WORKS | 5/7/2001 | | 5/16/2001 | | FAIL |
|
|
|
Requires drainage plan per Brian Murphy. Also need to show Sewer connection to pressure main, per John Johnson. 5/16/01 DAR
|
Plans ACCEPTED BY PLAN TECH | | | 5/7/2001 | | DONE |
|
|
|
|
Application received | | | 5/4/2001 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 5/4/2001 | | |
|
|
|
|