BLD-Final | 2/14/2002 | 2/14/2002 | 2/14/2002 | P | PASS |
Dave Hannah
|
|
|
###-#### TRAVIS c.c #21000 issued 2/14/2002 4:25:26 PM
|
DOC - Permit Finaled | 2/14/2002 | 2/14/2002 | 2/14/2002 | P | PASS |
Dave Hannah
|
|
|
Finaled by inspector at 2/14/2002 4:25:29 PM
|
BLD-Aging Inspection | 12/24/2001 | 12/24/2001 | 12/24/2001 | | DONE |
Dave Hannah
|
|
|
W.I.P 12/24/2001 10:11:28 AM
|
BLD-Energy code compliance | 10/22/2001 | 10/22/2001 | 10/22/2001 | A | PASS |
Dave Hannah
|
|
|
Added by Inspector: 425 On 10/22/2001 8:53:55 AM
|
BLD-Framing/Rough-in | 10/17/2001 | 10/18/2001 | 10/18/2001 | A | PASS |
Dave Hannah
|
|
|
###-####
|
BLD-Framing/Rough-in | 10/16/2001 | 10/16/2001 | 10/16/2001 | P | NR |
Dave Hannah
|
|
|
travis -###-#### fr -re-insp
|
BLD-Framing/Rough-in | 10/16/2001 | 10/16/2001 | 10/16/2001 | P | NR |
Dave Hannah
|
|
|
travis -###-#### fr -re-insp
|
BLD-Energy code compliance | 10/16/2001 | 10/16/2001 | 10/16/2001 | P | NR |
Dave Hannah
|
|
|
travis -###-#### fr -re-insp
|
BLD-Energy code compliance | 10/16/2001 | 10/16/2001 | 10/16/2001 | P | NR |
Dave Hannah
|
|
|
travis -###-#### fr -re-insp
|
BLD-Framing/Rough-in | 10/11/2001 | 10/11/2001 | 10/11/2001 | P | FAIL |
Dave Hannah
|
|
|
travis ###-#### c/n on site ok to insulate 10/11/2001 4:10:34 PM
|
BLD-Framing/Rough-in | 10/9/2001 | 10/9/2001 | 10/9/2001 | P | PASS |
Dave Hannah
|
|
|
travis ###-#### fr shear 10/9/2001 2:13:30 PM nailing ok to cover 10/9/2001 2:13:39 PM
|
BLD-Framing/Rough-in | 9/7/2001 | 9/10/2001 | 9/10/2001 | A | PASS |
Dave Hannah
|
|
|
###-#### KIM 1hr fire wall sec fl and trusses 9/10/2001 10:55:11 AM
|
BLD-Framing/Rough-in | 8/15/2001 | 8/15/2001 | 8/15/2001 | P | PASS |
Dave Hannah
|
|
|
###-#### steve first floor fire wall 8/15/2001 4:16:46 PM
|
BLD-Foundation | 7/18/2001 | 7/18/2001 | 7/18/2001 | P | PART |
Dave Hannah
|
|
|
Added by Inspector: 425 On 7/18/2001 2:48:55 PM
|
BLD-Footing | 7/2/2001 | 7/2/2001 | 7/2/2001 | P | PART |
Dave Hannah
|
|
|
###-#### checked setbacks look ok to north and east prop lines work in progress crew will clean out ftgs 7/2/2001 4:25:04 PM
|
Issue PAID IN FULL permit | | | 6/29/2001 | | DONE |
|
|
|
|
Routing - PLANNING | 6/5/2001 | 6/5/2001 | 6/8/2001 | | PASS |
|
|
|
Approved as CUP99-00036 and corrections to building plans for minimum 15' rear yard setback and revised interior garage dimensions.
|
Routing - PUBLIC WORKS | 5/5/2001 | 5/5/2001 | 6/8/2001 | | PASS |
|
|
|
|
Plan assigned to (SAM) | 5/5/2001 | | 6/8/2001 | | PASS |
Steve Munroe
|
|
|
6/8/2001 15:12:02 SAM - activity updated through activity BLDA022 from case BLD01-01187.
|
Print Pending Permit.LaserJet4 | | | 6/8/2001 | | |
|
|
|
|
Plan Review Report | | | 6/8/2001 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/8/2001 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 6/8/2001 | | DONE |
|
|
|
|
Telephone call | | | 6/8/2001 | | DONE |
|
|
|
PERMIT READY
|
Routing - PLANNING | 5/8/2001 | 5/8/2001 | 5/9/2001 | | PEND |
|
|
|
Need to submit revised site plan for buildings along east property line. Need 15' rear yard setback.
Need revised drawings for garages. Minimum 20' interior width, minimum 20' interior length for one bay and minimum 16' interior length for one bay (Section 11-10-04.04 of Boise City Zoning Ordinance)
|
Application received | | | 5/5/2001 | | |
|
|
|
|
Plans ACCEPTED BY PLAN CHECK | | | 5/5/2001 | | PEND |
|
|
|
|
Routing - PLAN CHECK | 6/8/2001 | 6/8/2001 | | | PEND |
|
|
|
|