Case Summary (BLD) | | | 6/27/2017 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 1/12/2016 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 1/12/2016 | | DONE |
|
|
|
|
Fee Review-notes | 5/7/2001 | 5/7/2001 | 2/21/2003 | | DONE |
|
|
|
|
BLD-Aging Inspection | 1/28/2003 | 1/28/2003 | 1/28/2003 | | PASS |
Jim Storey
|
|
|
final ok fire aproval achived. 1/28/2003 9:18:54 AM
|
DOC - Permit Finaled | 1/28/2003 | 1/28/2003 | 1/28/2003 | A | PASS |
Jim Storey
|
|
|
Finaled by inspector at 1/28/2003 9:18:57 AM
|
FIRE-Final Inspection | 8/23/2001 | 8/24/2001 | 8/24/2001 | A | PASS |
Joe Tawney
|
|
|
Final Ok for certificate of completion 8/24/2001 12:34:15 PM
|
BLD-Other | 8/23/2001 | 8/24/2001 | 8/24/2001 | P | CANC |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 08/23/2001 at 16:21:51. Contact: ###-####.
|
BLD-Aging Inspection | 8/16/2001 | 8/16/2001 | 8/16/2001 | | FAIL |
Jim Storey
|
|
|
need fire owner joel will call for insp 5 day notice. 8/23/2001 3:34:39 PM
|
Routing - PLAN CHECK | 5/16/2001 | 5/16/2001 | 5/16/2001 | | PASS |
|
|
|
New engineering received in response to plan review. Approved as noted and attached.
|
Plan assigned to (DRS) | 5/8/2001 | 5/8/2001 | 5/16/2001 | | PASS |
Dan Stuart
|
|
|
5/16/2001 08:41:40 DRS - activity updated through activity BLDA022 from case BLD01-01206.
|
Received Certificate of Value | | | 5/16/2001 | | |
|
|
|
Requested new certificate of value from tenant. Received update evaluation of $1,600.00 installation & $5,600.00 for rack cost (used) = $7,200.00 Total
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/16/2001 | | PASS |
|
|
|
Routing to permit desk to issue.
|
Inspection Record Card- Bld | | | 5/16/2001 | | DONE |
|
|
|
|
Print Occupancy Form | | | 5/16/2001 | | DONE |
|
|
|
|
Telephone call | | | 5/16/2001 | | DONE |
|
|
|
talked to joel to verify plans are ready
|
Issue PAID IN FULL permit | | | 5/16/2001 | | DONE |
|
|
|
|
Plan resubmittals received | | | 5/15/2001 | | DONE |
|
|
|
Received two copies of revised Structural Calculations for Rack Storage. Routed to Dan S. KMM
|
Routing - PLAN CHECK | 5/9/2001 | 5/9/2001 | 5/9/2001 | | FAIL |
|
|
|
Incomplete and incorrect in formation submitted by architect and structural engineer. Did not receive any Interlake engineering design, specifications & loading tables for the racks; discussion with the tenant disclosed the racks are not new but used; racks are 8 foot in width for the most part as well as the 12 foot shown on plans; engineering reflects load reduction of 50% for seismic per section 2228 UBC but in one direction the four columns in a line are not met - reduction may not be allowed; size of base plate with spacing of connections need to verified against Table 3 of ER-5788 for possible reduction of anchor load resistance capabilities; etc. I have called and left message for the architect, Matt Rhees & Engineer, Darren Truchot with my concerns and will formulate a letter to them. Plans are on hold until re-submittals are received to answere concerns.
|
Telephone call | | | 5/9/2001 | | DONE |
|
|
|
Called Darren Truchot, Pinnale Engineering to see if he had engineering design specifications for Interlake racks showing load capabilities, column, beam & base plate dimensions & load capabilities; discuss the 50% reduction used for seismic design per section 2228 UBC; the load limits to be placed on the rack beams to comply with 2222.5, for each beam type (96" & 144") where he designed only for the 144" beam .
|
Telephone call | | | 5/9/2001 | | DONE |
|
|
|
Matt Rhees, Cole | Assoc. to review the plan layout submitted and to let him know the engineering submitted was incomplete and that I had called Darren Truchot.
|
Telephone call | | | 5/9/2001 | | DONE |
|
|
|
Call Joel Wood, manager of Idaho Specialized Transportation, Inc. to see if he had information on the new steel storage racks to be installed. I was told that they were not new but existing racks of a previous tenant and that moer of them were 8 feet in width than 12 feet. Joel also had somr rack information from the original rack owner and hed would dend this information to me.
|
Plans ACCEPTED BY PLAN TECH | | | 5/8/2001 | | DONE |
|
|
|
|
Application received | | | 5/7/2001 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 5/7/2001 | | |
|
|
|
|