Permit Information
Permit NumberBLD01-01217
StatusFinaled
Name MORGAN WILLIAM H &
Site Address 12101 W EDNA ST
Project Name 
Customer Number 
ePlanReviewNo
Description
This project is for the construction of 406s.f. of addition to an existing single family dwelling. there is to be a 252s.f. addition to the master b.r. and a 154s.f. addition tto the family room. R-1C setbacks ok per ajb All per the approved plans as noted. Smoke detectors per UBC310.9 are required. pep
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
PostCard Mailed  1/4/2003 SENT
PostCard has been mailed requesting inspection.
PostCard Mailed  12/6/2002 SENT
PostCard has been mailed requesting inspection.
BLD-Final5/8/20025/9/20025/9/2002ADONE
DetailsDave Hannah
Scheduled by a contractor via Hello! on 05/08/2002 at 07:34:36. Contact: ###-####.
BLD-Final5/8/20025/9/20025/9/2002APASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 05/08/2002 at 07:34:36. Contact: ###-####.
BLD-Aging Inspection1/7/20021/7/20021/7/2002 PASS
DetailsDave Hannah
rough in on framing was oked on 11/5 but not logged every thing is ok for final but for two landings at doors 1/7/2002 2:28:33 PM
BLD-Aging Inspection11/5/200111/5/200111/5/2001 DONE
DetailsDave Hannah
work in progress 11/5/2001 9:12:46 AM
BLD-Framing/Rough-in9/4/20019/5/20019/5/2001PPART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 09/04/2001 at 11:12:18. Contact: ###-####. shear nail ok to cover ext 9/5/2001 3:17:12 PM
BLD-Aging Inspection8/27/20018/27/20018/27/2001 DONE
DetailsDave Hannah
work in progress 8/27/2001 9:57:22 AM
BLD-Foundation6/25/20016/26/20016/26/2001PPASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 06/25/2001 at 15:02:13. Contact: ###-####.
BLD-Footing6/14/20016/15/20016/15/2001PPART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 06/14/2001 at 08:28:17. Contact: ###-####. needs to move east wall on east addn back to get 15 ft setback 6/15/2001 1:43:45 PM
Plan Reviewer's activity  6/13/2001  
met with home owner and approve the addition of seven (7) s.f. to the structure and changed floor plan mments to match same. pep 6/13/2001
BLD-Footing6/7/20016/11/20016/10/2001ACANC
DetailsDave Hannah
Scheduled by a contractor via Hello! on 06/07/2001 at 11:17:20. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 06/10/2001 at 22:04:40.
Application received  5/8/2001  
Inspector's copy Bld permit  5/8/2001 DONE
PLANS/APPL TAKEN TO FRONT DESK  5/8/2001  
Inspection Record Card- Bld  5/8/2001 DONE
Issue PAID IN FULL permit  5/8/2001 DONE