CHANGE STATUS TO (FNL) | | | 1/8/2009 | | DONE |
Rita DeYoung
|
|
|
|
Case Summary (BLD) | | | 12/31/2008 | | |
|
|
|
|
Fee Review-notes | 5/10/2001 | 5/10/2001 | 11/9/2001 | | DONE |
|
|
|
|
BLD-Final | 10/2/2001 | 10/3/2001 | 10/3/2001 | A | PASS |
Jim Storey
|
|
|
greg ###-#### final ok per approved plan. 10/3/2001 9:28:17 AM
|
Permanent Occupancy | | 10/3/2001 | 10/3/2001 | | DONE |
|
|
|
|
Permanent occupancy UNPAID FEE | | | 10/3/2001 | | DONE |
|
|
|
Perm. Occ. Cert. #8850 issued 10-3-01 to Western Power Sports.
|
FIRE-Final Inspection | 9/6/2001 | 9/7/2001 | 9/7/2001 | P | PASS |
Rick Jackson
|
|
|
###-#### greg
|
BLD-Final | 9/7/2001 | 9/7/2001 | 9/7/2001 | P | FAIL |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 09/07/2001 at 07:30:39. Contact: ###-####. handrail ar dock / auto flush bolt at cof.rm./saftey glazing 2 locations at office/main door sign. 9/10/2001 9:24:53 AM
|
FIRE-Final Inspection | 8/26/2001 | 8/27/2001 | 8/27/2001 | P | NR |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 08/26/2001 at 08:44:12. Contact: ###-####. not ready for TI 8/28/2001 7:10:10 AM
|
BLD-Final | 8/26/2001 | 8/27/2001 | 8/27/2001 | P | NR |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 08/26/2001 at 08:44:55. Contact: ###-####.
|
BLD-Wall cover | 8/22/2001 | 8/23/2001 | 8/23/2001 | A | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 08/22/2001 at 13:05:18. Contact: ###-####.called pat, he wanted to know if 2nd floor ceiling had been approved ,looks like 420 okd. 8/23/2001 10:44:41 AM
|
BLD-Wall cover | 8/22/2001 | 8/22/2001 | 8/22/2001 | P | PART |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 08/22/2001 at 08:46:11. Contact: ###-####. ok to cover acc. ceiling pending electrical ok in 2nd floor area break, reading, etc. areas. 8/22/2001 1:00:52 PM
|
BLD-Wall cover | 8/1/2001 | 8/2/2001 | 8/2/2001 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 08/01/2001 at 12:46:43. Contact: ###-####. fire stopping ok prvious cn area. 8/2/2001 11:01:24 AM
|
BLD-Wall cover | 7/27/2001 | 7/27/2001 | 7/27/2001 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 07/27/2001 at 08:37:42. Contact: ###-####. 2nd floor ok to cover all but com. chase maintane occ wall. 7/27/2001 12:37:35 PM
|
BLD-Framing/Rough-in | 7/25/2001 | 7/25/2001 | 7/25/2001 | P | PART |
Jim Storey
|
|
|
Greg ###-#### c/n ok to one side pending plm. 7/25/2001 2:13:03 PM
|
BLD-Framing/Rough-in | 7/23/2001 | 7/23/2001 | 7/23/2001 | P | CANC |
Jim Storey
|
|
|
2nd floor framing ###-#### cancelled no plumbing scheduled
|
BLD-Wall cover | 7/10/2001 | 7/11/2001 | 7/11/2001 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 07/10/2001 at 09:35:10. Contact: ###-####.
|
Issue PAID IN FULL permit | | | 6/28/2001 | | DONE |
|
|
|
|
Plan assigned to (JCB) | 5/15/2001 | | 6/27/2001 | | PASS |
Jason Blais
|
|
|
6/27/2001 14:41:15 JCB - activity updated through activity BLDA022 from case BLD01-01238.
|
Routing - FIRE | 6/22/2001 | | 6/27/2001 | | PASS |
|
|
|
|
Plan Review Completed(1st rev) | | | 6/27/2001 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 6/27/2001 | | 6/27/2001 | | PASS |
|
|
|
Permit and plans approved and taken to front desk.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/27/2001 | | PASS |
|
|
|
|
Inspection Record Card- Bld | | | 6/27/2001 | | DONE |
|
|
|
|
Print Occupancy Form | | | 6/27/2001 | | DONE |
|
|
|
|
Telephone call | | | 6/27/2001 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 6/8/2001 | | 6/22/2001 | | PEND |
|
|
|
Plan review report sent and faxed to architect. No response required. When approved by Fire Dept. permit can be issued. Plans routed to Fire Dept.
|
Plan resubmittals received | | | 6/14/2001 | | DONE |
|
|
|
Received two copies of revised sheets A0, A1.3, A2,1, A2.2, A2.3, A2.4, A3.1, A7.1, E1.1, E2.1, E2.2, E2.3, E2.4, E3.1, E3.2, E3.3, E3.4, E4.0, E5.0. One copy of FAA approval letter. Routed to Jason B. kmm
|
Routing - PLAN CHECK | 5/17/2001 | | 6/8/2001 | | FAIL |
|
|
|
Initial review done and several issues need to be addressed. Met with architect in person and went over deficient items. He acknowledged issues and said resubmittal drawings would be coming. Architect also requested the plans be held until resubmittal drawings were provided. He did not want the plans to go to the Fire Dept. until resubmittal drawings are provided.
|
Plan resubmittals requested | | | 6/8/2001 | | |
|
|
|
Plan resubmittal drawings required for further review.
|
Meeting | | | 6/7/2001 | | |
|
|
|
Met with architect on deficient items for this project. He acknowledged problems and said resubmittal drawings would be coming. Architect requested plans to be held and not routed to the Fire Dept. until resubmittal drawings are provided.
|
Routing - PLUMBING | 5/16/2001 | | 5/17/2001 | | PASS |
|
|
|
water heaters located 8' aff must have a permanently mounted ladder for access, additional cross connection may be required.
|
Routing - PUBLIC WORKS | 5/15/2001 | | 5/16/2001 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 5/10/2001 | | HOLD |
|
|
|
Plumb. plans not signed. Contacted Wes Steele at ###-####. Plans in hold box. KMMReceived Plumbing plans from Habitec Architects, inserted plans into main set and forwarded all to Marlene Southard. 5/14/01 DAR
|
Application received | | | 5/10/2001 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 5/10/2001 | | |
|
|
|
|