BLD-Final | 11/8/2001 | 11/9/2001 | 11/9/2001 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 11/08/2001 at 16:12:03. Contact: ###-####. C/C issued. 11/9/2001 2:35:34 PM
|
DOC - Permit Finaled | 11/9/2001 | 11/9/2001 | 11/9/2001 | P | PASS |
Jim Sly
|
|
|
Finaled by inspector at 11/9/2001 2:35:53 PM
|
BLD-Aging Inspection | 10/22/2001 | 10/22/2001 | 10/22/2001 | | PART |
Jim Sly
|
|
|
WIP 10/22/2001 9:21:31 AM
|
BLD-Energy code compliance | 8/20/2001 | 8/21/2001 | 8/21/2001 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 08/20/2001 at 11:11:44. Contact: ###-####. Frame pass 8/21/2001 9:53:42 AM
|
BLD-Energy code compliance | 8/16/2001 | 8/17/2001 | 8/17/2001 | A | FAIL |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 08/16/2001 at 11:00:33. Contact: ###-####. Not ready 8/17/2001 8:49:33 AM
|
BLD-Framing/Rough-in | 8/17/2001 | 8/17/2001 | 8/17/2001 | P | FAIL |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 08/17/2001 at 10:03:28. Contact: ###-####. Insulate...do corrections and recall. 8/17/2001 1:38:35 PM
|
BLD-Framing/Rough-in | 8/15/2001 | 8/16/2001 | 8/16/2001 | A | FAIL |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 08/15/2001 at 11:37:05. Contact: ###-####. C/N posted. 8/16/2001 11:02:43 AM
|
BLD-Framing/Rough-in | 8/13/2001 | 8/13/2001 | 8/13/2001 | P | FAIL |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 08/13/2001 at 09:12:05. Contact: ###-####. c/n on site 8/13/2001 4:11:09 PM
|
BLD-Framing/Rough-in | 8/10/2001 | 8/10/2001 | 8/10/2001 | P | FAIL |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 08/10/2001 at 10:43:38. Contact: ###-####. No plans, truss Eng, or Eng for retro HD's. 8/10/2001 3:33:57 PM
|
BLD-Wall cover | 7/25/2001 | 7/27/2001 | 7/27/2001 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 07/25/2001 at 10:42:13. Contact: ###-####. 7/27/2001 10:33:17 AM OK TO Side but needs to retro fit hold downs east of front door 7/27/2001 10:34:44 AM
|
BLD-Foundation | 6/7/2001 | 6/7/2001 | 6/7/2001 | P | FAIL |
Dave Hannah
|
|
|
###-#### c/n on site 6/7/2001 3:21:20 PM
|
BLD-Footing | 6/4/2001 | 6/5/2001 | 6/5/2001 | A | PASS |
Jim Sly
|
|
|
wes ###-####
|
Issue PAID IN FULL permit | | | 5/29/2001 | | DONE |
|
|
|
|
Plan assigned to (DJO) | 5/21/2001 | 5/21/2001 | 5/24/2001 | | PASS |
Dan Overy
|
|
|
5/24/2001 08:01:47 DJO - activity updated through activity BLDA022 from case BLD01-01265.
|
Plan Reviewer's activity | | | 5/24/2001 | | DONE |
|
|
|
received new plans with corrections. still needs red-lining. engineers calculations for shearwall line #6 will be provided to structural inspector at or before frame inspection. will issue as is this time.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/24/2001 | | DONE |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 5/24/2001 | | DONE |
|
|
|
|
Plan Review Report | | | 5/24/2001 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 5/24/2001 | | |
|
|
|
|
Telephone call | | | 5/24/2001 | | DONE |
|
|
|
left mess that permit is ready
|
Plan Reviewer's activity | | | 5/21/2001 | | PEND |
|
|
|
plans are incomplete. one of the two plan set that were submitted have original corrections penciled and items high lighted. engineering for front tall wall does not match construction sets. beams and bearing locations missing or not indicated.
|
Plans ACCEPTED BY PLAN CHECK | | | 5/21/2001 | | |
|
|
|
|
Routing - PLANNING | 5/11/2001 | 5/11/2001 | 5/14/2001 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 5/11/2001 | 5/11/2001 | 5/14/2001 | | PASS |
|
|
|
|
Application received | | | 5/11/2001 | | |
|
|
|
|
Routing - PLAN CHECK | 5/14/2001 | 5/14/2001 | | | PEND |
|
|
|
|
Pending Assignment by DJO | 5/11/2001 | | | | PEND |
Dan Overy
|
|
|
|