BLD-Final | 11/27/2001 | 11/28/2001 | 11/28/2001 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 11/27/2001 at 16:33:09. Contact: ###-####. C/C issued. 11/28/2001 12:43:46 PM
|
DOC - Permit Finaled | 11/28/2001 | 11/28/2001 | 11/28/2001 | P | PASS |
Jim Sly
|
|
|
Finaled by inspector at 11/28/2001 12:44:22 PM
|
BLD-Final | 11/15/2001 | 11/19/2001 | 11/19/2001 | P | CANC |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 11/15/2001 at 08:50:27. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 11/19/2001 at 09:06:26.
|
BLD-Energy code compliance | 9/19/2001 | 9/20/2001 | 9/20/2001 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 09/19/2001 at 16:55:44. Contact: ###-####. Frame pass 9/20/2001 10:51:06 AM
|
BLD-Framing/Rough-in | 9/17/2001 | 9/18/2001 | 9/18/2001 | A | PASS |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 09/17/2001 at 15:03:50. Contact: ###-####. ok to insulate. 9/18/2001 9:48:37 AM
|
BLD-Framing/Rough-in | 9/14/2001 | 9/17/2001 | 9/17/2001 | P | FAIL |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 09/14/2001 at 10:12:20. Contact: ###-####. C/N posted. 9/17/2001 2:49:46 PM
|
BLD-Wall cover | 8/29/2001 | 8/29/2001 | 8/29/2001 | P | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 08/29/2001 at 08:55:36. Contact: ###-####. Shear OK 8/29/2001 3:36:56 PM
|
BLD-Foundation | 7/2/2001 | 7/2/2001 | 7/2/2001 | P | PASS |
Jim Sly
|
|
|
###-#### robert rebar
|
BLD-Footing | 6/28/2001 | 6/28/2001 | 6/28/2001 | P | PART |
Jim Sly
|
|
|
Robert Baker ###-####
|
BLD-Footing | 6/26/2001 | 6/26/2001 | 6/26/2001 | P | CANC |
Jim Sly
|
|
|
Robert Baker ###-#### NR 6/26/2001 1:15:37 PM
|
Inspection Record Card- Bld | | | 6/19/2001 | | DONE |
|
|
|
|
Telephone call | | | 6/19/2001 | | DONE |
|
|
|
talked to kim gave dollar amount
|
Issue PAID IN FULL permit | | | 6/19/2001 | | DONE |
|
|
|
|
Plan assigned to (DJO) | 5/21/2001 | 5/21/2001 | 6/18/2001 | | PASS |
Dan Overy
|
|
|
6/18/2001 08:23:06 DJO - activity updated through activity BLDA022 from case BLD01-01266.
|
Plan Reviewer's activity | | | 6/18/2001 | | DONE |
|
|
|
correct elevations submitted. ok to issue.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/18/2001 | | DONE |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 6/18/2001 | | DONE |
|
|
|
|
Plan Review Report | | | 6/18/2001 | | DONE |
|
|
|
|
Plan Reviewer's activity | | | 6/15/2001 | | PEND |
|
|
|
revised or modified plans were dropped off at front desk without preliminary plan review. will try to get to initial review sometime today.
|
Plan Reviewer's activity | | | 6/15/2001 | | PEND |
|
|
|
after initial review we still have problems. rear elevation missing from one submitted set. the rear elevation for this structure needs to be reversed on plans and modified to indicate smaller window arrangement in order to obtain engineered shear panel. will try it again when new revisions are submitted.
|
Plan Reviewer's activity | | | 5/22/2001 | | PEND |
|
|
|
received fax from varialle const. engineering does not match rear wall of structure. in fact rear elevations do not match floor plans. rejected until revisions or new plans are received.
|
Plans ACCEPTED BY PLAN CHECK | | | 5/21/2001 | | |
|
|
|
|
Plan Reviewer's activity | | | 5/21/2001 | | PEND |
|
|
|
called varialle construction. missing engineering for rear wall and overheight wall studs. will be faxed in. issue when received.
|
Routing - PLANNING | 5/11/2001 | 5/11/2001 | 5/14/2001 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 5/11/2001 | 5/11/2001 | 5/14/2001 | | PASS |
|
|
|
|
Application received | | | 5/11/2001 | | |
|
|
|
|
Routing - PLAN CHECK | 5/14/2001 | 5/14/2001 | | | PEND |
|
|
|
|
Pending Assignment by DJO | 5/11/2001 | | | | PEND |
Dan Overy
|
|
|
|