Information based on query as of Saturday, August 17, 2024.
Permit Information
Permit NumberBLD01-01268
StatusFinaled
Name IDAHO COMMERCIAL CONSTRUCTION
Site Address 1108 W BOISE AVE
Project NameERSTAD AND COMPANY
Customer Number 
ePlanReviewNo
Description
ERSTAD & COMPANY (NEW SHELL BUILDING) - TO CONSTRUCT A NEW 3,780 SQ. FT., TWO STORY WITH 1295 SQ. FT. BASEMENT, WOOD FRAMED OFFICE BUILDING AND RELATED SITE IMPROVEMENTS. THIS SHELL BUILDING WILL CONTAIN THREE SEPARATE OFFICE TENANTS WHEN FINISHED. ALL CONSTRUCTION PER THE APPROVED PLANS AND ATTACHED COMMENT LIST. THE SHELL AND TENANT IMPROVEMENT PLAN REVIEWS WERE DONE UNDER THE SHELL PERMIT COMMENT LIST. THE TENANT IMPROVEMENTS ARE BEING CONSTRUCTED UNDER BUILDING PERMIT NUMBERS BLD01-01269, BLD01-01270 AND BLD01-01271. NOTE: THIS IS A SHELL PERMIT ONLY. NO OCCUPANCY IS ALLOWED UNDER THIS PERMIT. PC#0410-01/DRH01-00198/JCM
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Fee Review-notes5/11/20015/11/200112/16/2002 DONE
PubWorks Occupancy Approval8/12/20028/12/20028/12/2002 DONE
Drainage project complete, signed permanent occupancy 8/9/02. G.Fitts
Letter of compliance  8/12/2002 DONE
Letter of Compliance #22561 issued 8-12-02.
BLD-Final3/29/20024/2/20024/2/2002APASS
DetailsJim Storey
###-#### bryan final ok pending p&z sign off. 4/2/2002 8:48:19 AM
BLD-Final2/11/20022/12/20022/12/2002APART
DetailsJim Storey
JIM ###-#### temp ok need reinsp. for basement col. and can light in closet. 2/12/2002 10:09:12 AM
Temporary occupancy  2/12/2002 PART
Temp. Occ. Cert. #4723 issued 2-12-02 to Erstad and Company (shell bldg.)
BLD-Final2/6/20022/7/20022/7/2002PCANC
DetailsJim Storey
FN JIM ###-####
FIRE-Final Inspection2/5/20022/6/20022/6/2002PPASS
DetailsRick Jackson
###-####
FIRE-Final Inspection1/30/20021/31/20021/31/2002PFAIL
DetailsRick Jackson
###-#### firestopping; dampers need L brackets; exit sign second floor 1/31/2002 4:58:59 PM
BLD-Framing/Rough-in1/17/20021/17/20021/17/2002PCANC
DetailsJim Storey
t-bar insp --jim ###-####
BLD-Wall cover12/18/200112/19/200112/19/2001APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 12/18/2001 at 13:44:03. Contact: ###-####. duct work ok. 12/19/2001 11:50:55 AM
BLD-Framing/Rough-in12/11/200112/11/200112/11/2001PPASS
DetailsJim Storey
###-#### framing ok shaft pending assemblie. 12/12/2001 9:30:57 AM
BLD-Framing/Rough-in12/7/200112/10/200112/10/2001ANR
DetailsJim Storey
###-####
BLD-Framing/Rough-in12/6/200112/7/200112/7/2001APART
DetailsJim Storey
AARON ###-#### need to finsh hd atchments. 12/7/2001 4:39:20 PM
BLD-Framing/Rough-in12/6/200112/6/200112/6/2001PNR
DetailsJim Storey
###-####
BLD-Framing/Rough-in11/30/200111/30/200111/30/2001PPART
DetailsJim Storey
###-#### exterior nailling ok for cover. 11/30/2001 4:27:55 PM
BLD-Conference11/28/200111/28/200111/28/2001PDONE
DetailsDave Hannah
Scheduled by a contractor via Hello! on 11/28/2001 at 09:59:05. Contact: ###-####. talked about doors and windows in demizing walls and hvac chase 11/28/2001 3:59:51 PM
BLD-Framing/Rough-in11/26/200111/27/200111/27/2001APART
DetailsJim Storey
###-#### erin roof nailling ok 11/27/2001 12:28:14 PM
BLD-Framing/Rough-in11/27/200111/27/200111/27/2001PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 11/27/2001 at 08:39:20. Contact: ###-####. roof nailling ok pending hard copy from engineer to back up verbal discution. 11/27/2001 1:57:46 PM
BLD-Framing/Rough-in11/21/200111/26/200111/26/2001PNR
DetailsJim Storey
AARON ###-####
BLD-Foundation10/19/200110/19/200110/19/2001PPART
DetailsJim Storey
###-#### west an south 24 '' walls ok 10/19/2001 3:03:30 PM
BLD-Foundation10/2/200110/3/200110/3/2001APASS
DetailsDave Hannah
###-#### BRYAN
BLD-Footing9/25/20019/26/20019/26/2001PPART
DetailsJim Storey
###-#### placed w/o insp. appears ok/ pending insp. report. 9/26/2001 5:12:13 PM
(F) Reprint permit  9/14/2001 DONE
Issue PAID IN FULL permit  9/13/2001 DONE
Inspection Record Card- Bld  9/13/2001 DONE
Print Occupancy Form  9/13/2001 DONE
CHANGE ISSUED DATE  9/13/2001 DONE
Routing - PLAN CHECK8/1/2001 8/2/2001 PASS
PLANS/APPL TAKEN TO FRONT DESK  8/2/2001 PASS
Inspection Record Card- Bld  8/2/2001 DONE
Print Occupancy Form  8/2/2001 DONE
Telephone call  8/2/2001 DONE
told them they need achd impact fee before they can have permit
Plan assigned to (JCM)5/14/2001 8/2/2001 PASS
DetailsJohn Menard
8/2/01 07:39:30 JCM - activity updated through activity BLDA022 from case BLD01-01268.
Routing - PUBLIC WORKS8/1/2001 8/1/2001 PASS
To April Miller. 8/1/01
Routing - PUBLIC WORKS7/12/2001 7/19/2001 FAIL
Called EHM engineers spoke to carl, he said he is bring uys the ROS (recorded) and warranty deeds today. AEM
Plan resubmittals received  7/17/2001 DONE
Received 3 sets of plan resubmittals from Musgrove Engineering, sheets P1.1 and P1.2 Forwarded same to John Menard. 7/17/01 DAR
Routing - PLAN CHECK7/11/2001 7/12/2001  
Routing - PLUMBING7/9/2001 7/11/2001 PASS
PROVIDE A BACKWATER VALVE FOR BASEMENT FIXTURES.
Plan Reviewer's activity  7/9/2001 PASS
Reviewed and approved resubmitted plan sheets with attached comment list and relined notes on plans. JCM
Routing - PLAN CHECK6/7/2001 7/9/2001  
Plan resubmittals received  7/3/2001  
3 full sized sets of architectural, structural, mechanical, plumbing and electrical
1 plan check corrections reply letter
3 structtural review corrections reply letter
3 copies of supplemental structtural calculations. took to john m. 7/3/2001
Routing - FIRE6/4/2001 6/7/2001 PASS
APPROVED WITHOUT WRITTEN COMMENTS
Plan Review Completed(1st rev)  6/7/2001 FAIL
Plan resubmittals requested  6/6/2001  
Faxed the architect of record a copy of the comment list from the consulting structural engineer requesting revisions. JCM
Routing Off Site - STRUCTURAL5/15/2001 6/5/2001 FAIL
Sent plans to consulting engineer via PDQ. 5/15/01 DAR Received a copy of the commnet list from the consulting structural engineer requesting resubmittals. JCM
Plan resubmittals requested  6/4/2001 FAIL
Mailed a copy of the plan review comment list to the architect of record requesting revisions. JCM
Routing - PLAN CHECK6/1/2001 6/4/2001 FAIL
Routing - PLUMBING5/25/2001 5/31/2001 FAIL
please provide a plumbing plan showing the above listed items
Routing - PLANNING5/21/2001 5/25/2001 PASS
Approve per DRH00-198 and as noted on the plans.
Routing - PUBLIC WORKS5/15/2001 5/21/2001 FAIL
Requires a reduction in Density per April Miller and a Geo Tech Report according to Brian Murphy. 5/21/01 DAR
Plans ACCEPTED BY PLAN TECH  5/15/2001 DONE
Application received  5/11/2001  
Recd Pcfee & Taken To Pln CK  5/11/2001 DONE
Routing Off Site - STRUCTURAL7/5/2001    
Sent resubmittals to consultanting structural engineer via PDQ. 7/5/01 DAR
Routing - PLAN CHECK7/20/2001