BLD-Final | 4/29/2002 | 4/29/2002 | 4/29/2002 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 04/29/2002 at 00:07:16. Contact: ###-####. final ok need bond for off street parking for 500.00/ ok to isue l/c. 4/29/2002 9:04:23 AM
|
DOC - L/C Approved | | | 4/29/2002 | | DONE |
|
|
|
Per Jim Storey, LC approved pending a $500.00 bond for offstreet parking. Issued 4/29/02 aml Bond received 4/29/02 aml L.C. #22348
|
BLD-Final | 4/25/2002 | 4/25/2002 | 4/25/2002 | P | PART |
Jim Storey
|
|
|
1. HAND RAILS - Stairways serving a private dwelling shall have at least one handrail except that a handrail is not required for stairways having less than four (4) risers. The top of handrails shall be placed not less than 34 inches or more than 38 inches above the nosing of treads. Handrails shall be continuous the full length of the stairs. Ends shall be returned or shall have rounded terminations or bends. The handgrip portion of handrails shall not be less than 1-1/4 inches nor more than 2 inches in cross-sectional dimension or the shape shall provide an equivalent gripping surface. The handgrip portion of handrails shall have a smooth surface with no sharp corners. Handrails projecting from a wall shall have a space of not less than 1-1/2 inches between the wall and the handrail. (1997 UBC 1003.3.3.6)
|
(F) Reprint permit | | | 4/23/2002 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 4/23/2002 | | DONE |
|
|
|
|
BLD-Final | 4/16/2002 | 4/17/2002 | 4/17/2002 | P | CANC |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 04/16/2002 at 16:55:08. Contact: ###-####. cancled plm failed. no insp. performed. 4/17/2002 1:50:30 PM
|
BLD-Wall cover | 2/20/2002 | 2/21/2002 | 2/21/2002 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 02/20/2002 at 13:06:27. Contact: ###-####. c/n made ok. 2/20/2002 4:55:47 PM
|
BLD-Wall cover | 2/19/2002 | 2/20/2002 | 2/20/2002 | A | FAIL |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 02/19/2002 at 18:31:37. Contact: ###-####. C/N...Fireblock. 2/20/2002 10:17:25 AM
|
BLD-Wall cover | 2/18/2002 | 2/19/2002 | 2/19/2002 | P | CANC |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 02/18/2002 at 15:14:21. Contact: ###-####. done by j sly 2/20/2002 9:35:38 AM
|
BLD-Framing/Rough-in | 2/7/2002 | 2/8/2002 | 2/8/2002 | P | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 02/07/2002 at 16:05:25. Contact: ###-####.
|
BLD-Framing/Rough-in | 10/18/2001 | 10/19/2001 | 10/19/2001 | A | PART |
Jim Storey
|
|
|
PLEASE CALL GREG AT ###-#### SO HE CAN MEET YOU THERE exterior ok for cover. hd to be checked at framing. 10/19/2001 3:29:09 PM
|
BLD-Aging Inspection | 8/21/2001 | 8/21/2001 | 8/21/2001 | | PART |
Jim Storey
|
|
|
wip framing roof. 8/22/2001 4:55:33 PM
|
Telephone call | | | 5/22/2001 | | DONE |
|
|
|
left mess that permit is ready
|
Issue PAID IN FULL permit | | | 5/22/2001 | | DONE |
|
|
|
|
Plan assigned to (PEP) | 5/11/2001 | 5/11/2001 | 5/17/2001 | | PASS |
Perry Paine
|
|
|
5/17/2001 08:46:21 PEP - activity updated through activity BLDA022 from case BLD01-01272.
|
Inspector's copy Bld permit | | | 5/17/2001 | | |
|
|
|
|
Inspector's copy Bld permit | | | 5/17/2001 | | DONE |
|
|
|
|
Plan Review Report | | | 5/17/2001 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/17/2001 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 5/17/2001 | | DONE |
|
|
|
|
Routing - PUBLIC WORKS | 5/11/2001 | 5/11/2001 | 5/15/2001 | | DONE |
|
|
|
fees to be paid to bench sewer dist. lw
|
Routing - PLANNING | 5/14/2001 | 5/14/2001 | 5/14/2001 | | PASS |
|
|
|
Revised site plan, added parking.
|
Routing - PLANNING | 5/11/2001 | 5/11/2001 | 5/14/2001 | | FAIL |
|
|
|
|
Telephone call | | | 5/14/2001 | | DONE |
|
|
|
Needs parking.
|
Application received | | | 5/11/2001 | | |
|
|
|
|
Routing - PLAN CHECK | 5/15/2001 | 5/15/2001 | | | PEND |
|
|
|
|