Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD01-01293
StatusFinaled
Name TAHOE CONSTRUCTION
Site Address 5062 E STEMWOOD ST
Project NameFLOOD PLAIN
Customer Number 
ePlanReviewNo
Description
To construct a 2200 sq. ft. two story single family dwelling with a 818 sq. ft. attached three car garage, a covered entry area and a free-form concrete patio at rear of structure per approved plans, all engineering/red-lining and attached requirement lists. (1st floor 1904 sq. ft.)(2nd floor bonus 296 sq. ft.) PC #359 SOLAR PROTECTED DJO
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final8/30/20019/4/20019/4/2001AFAIL
DetailsSteven Webb
Scheduled by a contractor via Hello! on 08/30/2001 at 13:43:39. Contact: ###-####. c/n stepdown from house to garage exceeds 9", address needed on building. 9/4/2001 10:00:25 AM
BLD-Final9/4/20019/4/20019/4/2001PPASS
DetailsSteven Webb
Scheduled by a contractor via Hello! on 09/04/2001 at 10:59:57. Contact: ###-####. C. of C. #21592 issued. 9/4/2001 2:03:59 PM
DOC - Permit Finaled9/4/20019/4/20019/4/2001PPASS
DetailsSteven Webb
Finaled by inspector at 9/4/2001 2:04:04 PM
BLD-Energy code compliance7/30/20017/31/20017/31/2001PPASS
DetailsSteven Webb
Scheduled by a contractor via Hello! on 07/30/2001 at 17:35:08. Contact: ###-####. Approval to insulate given by inspector 301 on 7/30/01--ok to cover . 7/31/2001 1:47:27 PM
BLD-Framing/Rough-in7/27/20017/30/20017/30/2001AFAIL
DetailsJim Storey
###-#### no truss info. 7/30/2001 10:40:59 AM
BLD-Framing/Rough-in7/27/20017/27/20017/27/2001PFAIL
DetailsSteven Webb
Scheduled by a contractor via Hello! on 07/27/2001 at 08:34:54. Contact: ###-####. No approved plans on site. 7/27/2001 2:47:02 PM
BLD-Framing/Rough-in7/18/20017/18/20017/18/2001PPASS
DetailsSteven Webb
###-#### shear wall only no framing Ok to side 7/18/2001 2:36:01 PM
Override - Parcel Holds  7/18/2001  
BLD-Foundation6/1/20016/4/20016/4/2001APART
DetailsSteven Webb
Jed ###-#### wip 6/4/2001 10:32:09 AM
BLD-Footing5/31/20016/1/20016/1/2001PPART
DetailsSteven Webb
###-####wip 6/1/2001 2:58:20 PM
Override - Parcel Holds  6/1/2001  
Override - Parcel Holds  5/31/2001  
Override - Parcel Holds  5/23/2001  
Inspection Record Card- Bld  5/23/2001 DONE
Telephone call  5/23/2001 DONE
left mess that permit is ready
Override - Parcel Holds  5/23/2001  
Issue PAID IN FULL permit  5/23/2001 DONE
Override - Parcel Holds  5/23/2001  
Print Pending Permit.LaserJet4  5/23/2001  
Plan assigned to (DJO)5/22/20015/22/20015/22/2001 PASS
DetailsDan Overy
5/22/2001 13:51:32 DJO - activity updated through activity BLDA022 from case BLD01-01293.
PLANS/APPL TAKEN TO FRONT DESK  5/22/2001 DONE
Override - Parcel Holds  5/22/2001  
Print Pending Permit.LaserJet4  5/22/2001  
Plan Review Report  5/22/2001 DONE
Plans ACCEPTED BY PLAN CHECK  5/22/2001  
Routing - PLANNING5/15/20015/15/20015/16/2001 PASS
Routing - PUBLIC WORKS5/15/20015/15/20015/16/2001 PASS
Application received  5/15/2001  
Routing - PLAN CHECK5/16/20015/16/2001  PEND
Pending Assignment by DJO5/15/2001   PEND
DetailsDan Overy