BLD-Final | 11/26/2001 | 11/27/2001 | 11/27/2001 | P | PASS |
Steven Webb
|
|
|
###-#### c. of c. #20946 issued. 11/27/2001 2:38:34 PM
|
BLD-Final | 11/26/2001 | 11/27/2001 | 11/27/2001 | A | CANC |
Steven Webb
|
|
|
###-#### JASON cancelled by contractor--not ready 11/27/2001 10:33:10 AM
|
DOC - Permit Finaled | 11/27/2001 | 11/27/2001 | 11/27/2001 | P | PASS |
Steven Webb
|
|
|
Finaled by inspector at 11/27/2001 2:38:38 PM
|
BLD-Final | 11/26/2001 | 11/26/2001 | 11/26/2001 | P | CANC |
Steven Webb
|
|
|
###-#### Cancelled by contractor 11/26/2001 3:35:58 PM
|
BLD-Aging Inspection | 11/7/2001 | 11/7/2001 | 11/7/2001 | | PART |
Steven Webb
|
|
|
wip 11/7/2001 8:05:12 AM
|
BLD-Final | 9/6/2001 | 9/7/2001 | 9/7/2001 | A | CANC |
Steven Webb
|
|
|
fn jason- ###-#### cancelled by contractor 9/7/2001 9:24:10 AM
|
BLD-Energy code compliance | 9/5/2001 | 9/6/2001 | 9/6/2001 | A | DONE |
Dave Hannah
|
|
|
###-####
|
BLD-Framing/Rough-in | 9/5/2001 | 9/6/2001 | 9/6/2001 | A | DONE |
Dave Hannah
|
|
|
|
BLD-Framing/Rough-in | 8/9/2001 | 8/10/2001 | 8/10/2001 | A | PASS |
Dave Hannah
|
|
|
###-#### josh edwards engineering oked holes had them add one more ml ok to cover 8/10/2001 11:02:14 AM
|
BLD-Framing/Rough-in | 8/6/2001 | 8/6/2001 | 8/6/2001 | P | FAIL |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 08/06/2001 at 08:44:05. Contact: ###-####. Contracted contractor--Need engineering on (2) m.lam which has numberous holes drilled into. 8/6/2001 1:48:33 PM
|
BLD-Energy code compliance | 7/30/2001 | 7/31/2001 | 7/31/2001 | A | PART |
Steven Webb
|
|
|
Terry, ###-#### ok to cover except area where beam has holes drilled--waiting on engineering. 7/31/2001 11:14:16 AM
|
BLD-Framing/Rough-in | 7/26/2001 | 7/27/2001 | 7/27/2001 | A | PART |
Steven Webb
|
|
|
Terry, ###-#### C/N posted--ok to insulate 7/27/2001 8:39:20 AM
|
BLD-Wall cover | 7/13/2001 | 7/16/2001 | 7/16/2001 | A | PASS |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 07/13/2001 at 17:00:56. Contact: ###-####. ok to side 7/16/2001 8:37:40 AM
|
BLD-Foundation | 6/21/2001 | 6/22/2001 | 6/22/2001 | A | PART |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 06/21/2001 at 20:14:41. Contact: ###-####. wip 6/22/2001 10:49:14 AM
|
BLD-Footing | 6/20/2001 | 6/21/2001 | 6/21/2001 | A | NR |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 06/20/2001 at 16:45:10. Contact: ###-####.
|
BLD-Footing | 6/21/2001 | 6/21/2001 | 6/21/2001 | A | PART |
Steven Webb
|
|
|
Added by Inspector: 420 On 6/21/2001 11:38:16 AM wip 6/21/2001 11:38:37 AM
|
Plan Reviewer's activity | | | 6/15/2001 | | DONE |
|
|
|
PLANS HAVE BEEN REVISED TO INCLUDE THIRD BAY ON GARAGE.
|
Issue PAID IN FULL permit | | | 6/12/2001 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 6/8/2001 | | DONE |
|
|
|
|
Telephone call | | | 6/8/2001 | | DONE |
|
|
|
called permit ready
|
Plan assigned to (DJO) | 6/4/2001 | 6/4/2001 | 6/7/2001 | | PASS |
Dan Overy
|
|
|
6/7/2001 16:51:14 DJO - activity updated through activity BLDA022 from case BLD01-01341.
|
Plan Reviewer's activity | | | 6/7/2001 | | DONE |
|
|
|
received new plans where engineering matchs. ok to issue.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/7/2001 | | DONE |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 6/7/2001 | | DONE |
|
|
|
|
Plan Review Report | | | 6/7/2001 | | DONE |
|
|
|
|
Plan Reviewer's activity | | | 6/4/2001 | | PEND |
|
|
|
engineering for wall bracing/holdowns do not match what is shown on plans. will call roth tomorrow. 6-4-01 5:45 P.M.
|
Plans ACCEPTED BY PLAN CHECK | | | 6/4/2001 | | |
|
|
|
|
Routing - PLANNING | 5/18/2001 | 5/18/2001 | 5/22/2001 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 5/18/2001 | 5/18/2001 | 5/22/2001 | | PASS |
|
|
|
|
Application received | | | 5/18/2001 | | |
|
|
|
|
Routing - PLAN CHECK | 5/22/2001 | 5/22/2001 | | | PEND |
|
|
|
|
Pending Assignment by DJO | 5/18/2001 | | | | PEND |
Dan Overy
|
|
|
|