BLD-Final | 3/8/2002 | 3/11/2002 | 3/11/2002 | A | PASS |
Steven Webb
|
|
|
fn occ allen -###-#### c. of c. #22167 issued 3/11/2002 8:37:33 AM
|
DOC - Permit Finaled | 3/11/2002 | 3/11/2002 | 3/11/2002 | A | PASS |
Steven Webb
|
|
|
Finaled by inspector at 3/11/2002 8:39:17 AM
|
BLD-Framing/Rough-in | 12/20/2001 | 12/21/2001 | 12/21/2001 | P | PASS |
Steven Webb
|
|
|
###-#### Interior sheer 12/21/2001 1:59:48 PM
|
BLD-Framing/Rough-in | 12/19/2001 | 12/20/2001 | 12/20/2001 | A | PASS |
Steven Webb
|
|
|
###-#### JASON prior c/n items ok--approved for cover 12/20/2001 11:06:36 AM
|
BLD-Energy code compliance | 12/18/2001 | 12/18/2001 | 12/18/2001 | P | PART |
Steven Webb
|
|
|
jason ###-#### c/n--ok to cover except the beam in the living room-eng. needed prior to cover. 12/18/2001 2:45:09 PM
|
BLD-Framing/Rough-in | 12/14/2001 | 12/14/2001 | 12/14/2001 | P | PART |
Steven Webb
|
|
|
jason ###-#### c/n issued--ok to insulate 12/14/2001 2:16:53 PM
|
BLD-Framing/Rough-in | 12/12/2001 | 12/13/2001 | 12/13/2001 | A | NR |
Steven Webb
|
|
|
###-#### c/n--all trade r. i. not completed 12/13/2001 9:24:22 AM
|
BLD-Framing/Rough-in | 11/15/2001 | 11/16/2001 | 11/16/2001 | P | PASS |
Steven Webb
|
|
|
###-#### JASON SHEAR--OK TO SIDE 11/16/2001 2:56:09 PM
|
BLD-Foundation | 10/26/2001 | 10/26/2001 | 10/26/2001 | P | PART |
Steven Webb
|
|
|
###-#### RANDY wip 10/26/2001 2:10:17 PM
|
Case Summary (BLD) | | | 10/25/2001 | | |
|
|
|
|
BLD-Footing | 10/24/2001 | 10/24/2001 | 10/24/2001 | P | PART |
Steven Webb
|
|
|
###-#### randy wip 10/24/2001 3:19:11 PM
|
Issue PAID IN FULL permit | | | 9/28/2001 | | DONE |
|
|
|
|
Telephone call | | | 8/9/2001 | | DONE |
|
|
|
called chris left message about plans that need to be picked up
|
Plan Reviewer's activity | | | 7/13/2001 | | PEND |
|
|
|
7/13/01 Only one set of plans are being approved due to excessive red-lining. The engineer faxed over a revised set of calculations.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/13/2001 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 7/13/2001 | | DONE |
|
|
|
|
Telephone call | | | 7/13/2001 | | DONE |
|
|
|
left mess that permit is ready
|
Plan assigned to (SAM) | 6/4/2001 | | 7/13/2001 | | PASS |
Steve Munroe
|
|
|
7/13/2001 09:53:05 SAM - activity updated through activity BLDA022 from case BLD01-01342.
|
Plan Reviewer's activity | | | 7/11/2001 | | PEND |
|
|
|
7/11/01 16:20 Talked to Mike with Roth and Bob with Pinnacle. Bob will get me some new calcs regarding the front and side walls.
|
Plan Reviewer's activity | | | 6/8/2001 | | PEND |
|
|
|
6/8/01 9:20 Called and talked to Mike with Roth. I informed him that I need Bob with Pinnacle to look at the plan again. There is more loading on certain walls.
|
Plan Reviewer's activity | | | 6/5/2001 | | PEND |
|
|
|
6/5/01 7:45 I called and left a message for Steve Roth to call me. I need the engineers red-lined plans to verify with what was submitted. Dan Overy and I would also like to meet with the new designer.
|
Pending Assignment by DJO | 5/18/2001 | | 6/4/2001 | | DONE |
Dan Overy
|
|
|
6/4/2001 17:09:45 SAM - activity updated through activity BLDA183 from case BLD01-01342.
|
Routing - PLANNING | 5/18/2001 | 5/18/2001 | 5/22/2001 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 5/18/2001 | 5/18/2001 | 5/22/2001 | | PASS |
|
|
|
|
Application received | | | 5/18/2001 | | |
|
|
|
|
Routing - PLAN CHECK | 5/22/2001 | 5/22/2001 | | | PEND |
|
|
|
|