Permit Information
Permit NumberBLD01-01343
StatusFinaled
Name PROGRESSIVE
Site Address 9020 W BLACKEAGLE DR
Project NameBLACKEAGLE #1 (MALLARD)
Customer Number 
ePlanReviewNo
Description
(PROGRESSIVE) This building is fire sprinklered for building area increase. To create a 4,000 square foot office tenant space by combining smaller spaces. Selective nonstructural demolition is covered under this permit. Work is to include interior nonbearing walls, interior doors, interior windows, interior finishes, and suspended ceilings all per approved drawings and plan review conditions on file. The location of fire sprinkler heads shall comply with NFPA 13-1999 as regulated by the Fire Department. PC-0424-01 **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Fee Review-notes5/18/20015/18/20012/1/2002 DONE
Permanent occupancy UNPAID FEE  8/15/2001 DONE
Perm. Occ. Cert. #8790 issued 8-15-01 to Progressive.
Permanent Occupancy 8/14/20018/14/2001 DONE
Details
BLD-Final8/13/20018/14/20018/14/2001PPASS
DetailsRuss Owen
Scheduled by a contractor via Hello! on 08/13/2001 at 14:11:01. Contact: ###-####.ok perm oc. 8/14/2001 3:27:43 PM
FIRE-Final Inspection8/13/20018/13/20018/13/2001PPASS
DetailsJoe Tawney
Final OK for permanant occupancy 8/13/2001 2:01:43 PM
BLD-Other7/27/20017/30/20017/30/2001APASS
DetailsRuss Owen
Scheduled by a contractor via Hello! on 07/27/2001 at 16:49:30. Contact: ###-####.ceiling grid. 7/30/2001 10:27:23 AM
BLD-Other7/27/20017/27/20017/27/2001PNR
DetailsRuss Owen
Scheduled by a contractor via Hello! on 07/27/2001 at 09:22:28. Contact: ###-####.needs 3 pods in rooms over 144sq ft and light wires tied in far left office west side and all vertical pods in place now need the 4 way wire bracing installed. 7/27/2001 3:48:20 PM
BLD-Framing/Rough-in7/11/20017/11/20017/11/2001PPART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 07/11/2001 at 11:03:44. Contact: ###-####.ok to start rock. 7/11/2001 4:27:59 PM
BLD-Framing/Rough-in7/10/20017/10/20017/10/2001PPART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 07/10/2001 at 08:17:23. Contact: ###-####. need elect,plumbing approvred,ok to rock 1 side, recall when ready. No c/n talked with JC. 7/10/2001 1:58:05 PM
Issue PAID IN FULL permit  6/28/2001 DONE
Inspection Record Card- Bld  6/7/2001 DONE
Print Occupancy Form  6/7/2001 DONE
Telephone call  6/7/2001 DONE
left mess for ryan that permit is ready
Routing - PLAN CHECK6/6/2001 6/6/2001 PASS
PLANS/APPL TAKEN TO FRONT DESK  6/6/2001 PASS
Plan assigned to (CJW)5/18/2001 6/6/2001 PASS
DetailsCarl Westfall
6/6/01 15:39:23 CJW - activity updated through activity BLDA022 from case BLD01-01343.
Routing - FIRE5/31/2001 6/6/2001 PASS
DetailsBill Alexander
Routing - PLAN CHECK5/22/2001 5/31/2001 PASS
Plan Reviewer's activity  5/30/2001 PASS
UBC plan review started May 30, 2001 and finished the next day. The drawings were approved with conditions. See the conditions list.
Routing - PUBLIC WORKS5/18/2001 5/22/2001 PASS
Plans ACCEPTED BY PLAN TECH  5/18/2001 DONE
Received Certificate of Value  5/18/2001 DONE
Application received  5/18/2001  
Recd Pcfee & Taken To Pln CK  5/18/2001 DONE