To construct a 4,000 square foot, one story, Type VN office shell building, with a 2,648 square foot unfinished tenant space, and a finished 1352 square foot tenant space. Other work includes all site improvements, paving and landscaping per approved plans and attachments,DRH01-00092, PC#0432-01 No occupancy is authorized under this permit. Separate plans and permits are required for each tenant space to gain occupancy. Note: T.I. permit BLD01-01404 is on the same set of plans for the 1352 sq. ft. finished space. MLO
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  7/27/2012 DONE
Case Summary (BLD)  2/18/2004  
Fee Review-notes5/22/20015/22/20012/1/2002 DONE
Letter of compliance  11/5/2001 DONE
Letter of Compliance #22033 issued 11-5-01.
BLD-Final11/2/200111/2/200111/2/2001PPASS
DetailsDave Hannah
###-#### SCOTT
Temporary occupancy  9/28/2001 PART
Temp. Occ. Cert. #4600 issued 9-28-01 to Lake Harbor Bldg. #9.
BLD-Final9/27/20019/27/20019/27/2001PPART
DetailsTony Young
ok as long as other trades are ok, owner said bond is in place for exterior and landscape 9/27/2001 4:32:19 PM
FIRE-Final Inspection9/24/20019/24/20019/24/2001APASS
DetailsRick Jackson
Added by Inspector: 409 On 9/24/2001 11:17:18 AM
BLD-Framing/Rough-in9/19/20019/19/20019/19/2001PPASS
DetailsTony Young
Scheduled by a contractor via Hello! on 09/19/2001 at 11:15:27. Contact: ###-####.
shell framing and shear ok, need to have trades finish south 1/2 of shell w/ T. I. permit. 9/19/2001 3:04:43 PM
BLD-Framing/Rough-in9/6/20019/6/20019/6/2001PPART
DetailsTony Young
Scheduled by a contractor via Hello! on 09/06/2001 at 11:06:21. Contact: ###-####.
east/west ext. fire walls ok to cover 9/6/2001 2:47:54 PM
BLD-Framing/Rough-in8/31/20019/4/20019/4/2001ANR
DetailsTony Young
Scheduled by a contractor via Hello! on 08/31/2001 at 12:01:32. Contact: ###-####.
BLD-Framing/Rough-in8/28/20018/29/20018/29/2001APART
DetailsTony Young
Scheduled by a contractor via Hello! on 08/28/2001 at 12:25:29. Contact: ###-####.
need to verify later in pm 8/29/2001 9:21:39 AM
BLD-Energy code compliance8/28/20018/29/20018/29/2001PPART
DetailsTony Young
Scheduled by a contractor via Hello! on 08/28/2001 at 16:42:20. Contact: ###-####.
north 1/2 of shell ok 8/29/2001 2:29:48 PM
BLD-Framing/Rough-in8/27/20018/28/20018/28/2001ANR
DetailsTony Young
Scheduled by a contractor via Hello! on 08/27/2001 at 17:05:20. Contact: ###-####.
BLD-Framing/Rough-in8/28/20018/28/20018/28/2001PPART
DetailsTony Young
ok to cover north side, need eng. fix on posts on bearing walls 8/28/2001 4:29:38 PM
BLD-Framing/Rough-in8/23/20018/24/20018/24/2001APART
DetailsTony Young
Scheduled by a contractor via Hello! on 08/23/2001 at 19:42:52. Contact: ###-####.ext. shear ok on east and west side 8/24/2001 10:28:48 AM
BLD-Conference8/17/20018/20/20018/20/2001APART
DetailsTony Young
firewall and floor ?s 8/19/2001 11:01:05 PM
will need arch. approval on floor, firewall per plan. 8/20/2001 10:14:15 AM
BLD-Conference8/17/20018/17/20018/17/2001PCANC
DetailsTony Young
Scheduled by a contractor via Hello! on 08/17/2001 at 07:37:37. Contact: ###-####.
BLD-Foundation7/24/20017/25/20017/25/2001APART
DetailsTony Young
###-####
wip, verbal corrections 7/25/2001 11:06:30 AM
BLD-Footing7/24/20017/24/20017/24/2001PPART
DetailsTony Young
###-####
wip, ok when ready 7/24/2001 3:38:47 PM
BLD-Conference7/23/20017/23/20017/23/2001PPART
DetailsTony Young
###-#### Mike
soil ok w/ verbal corrections, compaction and removal of any debris 7/23/2001 4:38:18 PM
(F) Reprint permit  7/23/2001 DONE
PLANS/APPL TAKEN TO FRONT DESK  7/20/2001 DONE
Inspection Record Card- Bld  7/20/2001 DONE
Print Occupancy Form  7/20/2001 DONE
Telephone call  7/20/2001 DONE
left mess that permit is ready
Issue PAID IN FULL permit  7/20/2001 DONE
Plan assigned to (MLO)5/22/2001 7/20/2001 PASS
DetailsMike Otto
7/20/2001 09:30:51 MLO - activity updated through activity BLDA022 from case BLD01-01372.
Routing - FIRE7/19/20017/19/20017/19/2001 PASS
DetailsBill Alexander
Plan resubmittals received  7/18/2001 DONE
Received two sets of Plan resubmittals from Tamura and Associates, sheets A2.3 and A2.4, forwarded same to Mike Otto. 7/18/01 DAR
Routing - PLAN CHECK7/18/2001 7/18/2001 PASS
Routing - PLAN CHECK7/16/2001 7/17/2001 FAIL
corrections faxed to architect
Routing - PLUMBING7/17/2001 7/17/2001 PASS
LOOKS GOOD TO ME
Plan resubmittals requested  7/17/2001 FAIL
UBC Corrections
Plan resubmittals received  7/16/2001 DONE
Received two copies of revised sheets A1.0, A2.0, A2.2, A2.3, A2.4, A4.1, A5.0, A9.0, and one copy of response letter, routed to Mike O. kmm
Plan Review Completed(1st rev)  7/16/2001 FAIL
Routing - FIRE7/12/2001 7/16/2001 FAIL
water supply
Routing - PLAN CHECK7/6/2001 7/11/2001 FAIL
corrections mailed and faxed to architect.
Plan resubmittals requested  7/11/2001 FAIL
UBC corrections
Routing - PLUMBING7/2/2001 7/6/2001 FAIL
please provide a site plan showing the size and location of sewr and water services from utility connection to the building.
Routing - PLANNING6/28/2001 7/2/2001 PASS
Routing - PUBLIC WORKS5/22/2001 6/28/2001 PASS
Additional plans submitted  5/24/2001 DONE
Received Geotech report from Mark Sanders, forwarded same to Brian Murphy.
Application received  5/22/2001  
Plans ACCEPTED BY PLAN TECH  5/22/2001 DONE
Recd Pcfee & Taken To Pln CK  5/22/2001