Case Summary (BLD) | | | 9/18/2014 | | DONE |
|
|
|
|
Letter of compliance | | | 5/13/2002 | | DONE |
|
|
|
Letter of Compliance #22486 issued 5-13-02.
|
BLD-Final | 5/9/2002 | 5/10/2002 | 5/10/2002 | A | PASS |
Jim Sly
|
|
|
tim- ###-#### fn OK for Perm. Occ. 5/10/2002 12:35:11 PM
|
Fee Review-notes | 5/22/2001 | 5/22/2001 | 4/26/2002 | | DONE |
|
|
|
|
BLD-Final | 4/11/2002 | 4/12/2002 | 4/12/2002 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 04/11/2002 at 14:01:26. Contact: ###-####. OK for Temp Occ. C/N....Obtain perm occ status within 90 days of this notice. 4/12/2002 11:34:09 AM
|
Temporary occupancy | | | 4/12/2002 | | DONE |
|
|
|
Temp. Occ. Cert. #4788 issued 4-12-02 to Mahogany Business Park (shell bldg.)
|
FIRE-Final Inspection | 3/25/2002 | 3/25/2002 | 3/25/2002 | P | PASS |
Troy Cobbley
|
|
|
Added by Inspector: 430 On 3/25/2002 12:01:14 PM fire life/safety finaled
|
BLD-Framing/Rough-in | 12/13/2001 | 12/13/2001 | 12/13/2001 | P | PASS |
Jim Sly
|
|
|
Added by Inspector: 316 On 12/13/2001 12:01:13 PM frame OK for shell.
|
BLD-Framing/Rough-in | 11/26/2001 | 11/26/2001 | 11/26/2001 | P | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 11/26/2001 at 10:25:21. Contact: ###-####. Roof nailing OK. 11/26/2001 3:14:46 PM
|
BLD-Foundation | 10/23/2001 | 10/23/2001 | 10/23/2001 | P | PASS |
Jim Sly
|
|
|
###-#### AFTER BEEP 14236 CLINT
|
BLD-Footing | 10/22/2001 | 10/22/2001 | 10/22/2001 | P | PASS |
Dave Hannah
|
|
|
CLINT ###-#### AFTER BEEP 14236
|
(F) Reprint permit | | | 10/16/2001 | | |
|
|
|
|
Print Occupancy Form | | | 10/15/2001 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 10/15/2001 | | DONE |
|
|
|
|
Telephone call | | | 10/15/2001 | | DONE |
|
|
|
PERMIT READY AND NEED ACHD
|
Issue PAID IN FULL permit | | | 10/15/2001 | | DONE |
|
|
|
|
Routing - PUBLIC WORKS | 10/9/2001 | | 10/12/2001 | | PASS |
|
|
|
SUBDIVISION WAS DONE 10/10/01 AEM
|
Routing - PLAN CHECK | 10/12/2001 | | 10/12/2001 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/12/2001 | | PASS |
|
|
|
|
Plan assigned to (JCM) | 5/24/2001 | | 10/12/2001 | | PASS |
John Menard
|
|
|
10/12/01 16:07:44 JCM - activity updated through activity BLDA022 from case BLD01-01382.
|
Routing - PLAN CHECK | 7/30/2001 | | 10/9/2001 | | |
|
|
|
|
Plan Reviewer's activity | | | 8/8/2001 | | PASS |
|
|
|
Reviewed and approved resubmitted plan sheets. JCM
|
Plan resubmittals received | | | 8/6/2001 | | DONE |
|
|
|
Received two sets of plan resubmittals sheetsA3 and A6, forwarded same to John Menard. 8/6/01 DAR
|
Routing - FIRE | 7/25/2001 | | 7/30/2001 | | PASS |
|
|
|
approved without written comment
|
Plan resubmittals requested | | | 7/25/2001 | | |
|
|
|
Mailed the architect a copy of the plan review comment list requesting revisions. JCM
|
Routing - PLAN CHECK | 7/16/2001 | | 7/25/2001 | | FAIL |
|
|
|
|
Routing - PLUMBING | 7/11/2001 | | 7/13/2001 | | PASS |
|
|
|
PER PLANS AND 97 UPC
|
Routing Off Site - STRUCTURAL | 7/6/2001 | | 7/12/2001 | | PASS |
|
|
|
Received a letter from the consulting structural engineer, approving last resubmittals. JCM
|
Routing - PLANNING | 6/29/2001 | | 7/10/2001 | | PASS |
|
|
|
|
Plan resubmittals received | | | 7/5/2001 | | DONE |
|
|
|
Received 3 sets of Plan Resubmittals from Larry Knopp Architect sheets A2 and A6, forwarded same with small documents to John Menard. 7/5/01 DAR
|
Routing - PUBLIC WORKS | 6/5/2001 | | 6/29/2001 | | FAIL |
|
|
|
Requires proof of legal land division and subdivision not recorded. per jim r. kmm
|
Routing Off Site - STRUCTURAL | 6/22/2001 | | 6/28/2001 | | FAIL |
|
|
|
contacted pdq to take revised plans to outside eng. KMM Received comment list from consulting structural engineer requesting additional revisions. JCM
|
Plan resubmittals requested | | | 6/28/2001 | | |
|
|
|
Faxed the architect a copy of the comment list from the consulting structural engineer requesting additional structural revisions. JCM
|
Plan resubmittals received | | | 6/21/2001 | | DONE |
|
|
|
Received three sets of plan resubmittals from Larry Knopp Architect, sheets A3,A4, A5and A6 plus small documents, forwarded same to John Menard. 6/21/01 DAR
|
Plan resubmittals requested | | | 6/11/2001 | | |
|
|
|
Faxed the architect of record a copy of the comment list from the consulting structural engineer requesting revisions. JCM
|
Routing Off Site - STRUCTURAL | 5/24/2001 | | 6/11/2001 | | FAIL |
|
|
|
Contacted PDQ to take plans to outside eng. KMM Received a mailed copy of the comment list from the consulting structural engineer requesting revisions. JCM
|
Plan routing begun/NEW & ADDTN | | | 6/5/2001 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 6/4/2001 | | DONE |
|
|
|
Tim Opp and Larry Knopp stated no plumb. or mech. at this time.
|
Plan routing begun/NEW & ADDTN | | | 5/24/2001 | | HOLD |
|
|
|
waiting for grading and drainage information on the turnabout and site.
1. Grading and drainage application for the student unloading zone. Five copies of C.2 sheet and two copies of the site plan.
2. Two copies of a) cover sheet for the grading and drainage for the site and first building
b) two copies of landscape plan
c) two copies of the site plan
d) application
e) two additional civil sets
I need a letter from United Water indicating nearest hydrant locations and available fire flows and include available supply for sprinkler design if applicable.
When I receive the above items, I can begin routing all permits. KMM
|
Plans ACCEPTED BY PLAN TECH | | | 5/24/2001 | | HOLD |
|
|
|
waiting for the information I have asked for the grading and drainage for the turn around and site. kmm
|
Received Certificate of Value | | | 5/22/2001 | | DONE |
|
|
|
|
Application received | | | 5/22/2001 | | |
|
|
|
|
Override - Parcel Holds | | | 5/22/2001 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 5/22/2001 | | |
|
|
|
|
Routing - PLAN CHECK | 1/13/2001 | | | | |
|
|
|
|