Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD01-01386
StatusFinaled
Name MAGNUSON DWIGHT R
Site Address 2933 W HILLWAY DR
Project Name 
Customer Number 
ePlanReviewNo
Description
To remodel and construct a addition to a existing single family residence. 86 sq. ft. to be added to the first floor with a new entry and a stairway to the second floor. 1036 sq. ft. second floor addition to be constructed. There will be two bedrooms, one and half bathrooms and a family room in the new upstairs. There will be a 365 sq. ft. attached one car garage constructed in the place of the existing carport/garage. The existing structure in this area will be demolished. There will also be a 48 sq. ft. deck constructed off the master bedroom. Per approved plans, engineering, requirement list and all red-lining. Battery powered smoke detectors required per code in existing residence. Terry Records with Public Works signed off (grade less than 15% does not require hillside engineering. Roger Jones with Planning and Zoning approved. (sam)
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final12/19/200112/20/200112/20/2001APASS
DetailsTony Young
###-#### ###-####
c of c issued, pending final affidavit letter from s. i. co. MTI 12/20/2001 10:46:48 AM
DOC - Permit Finaled12/20/200112/20/200112/20/2001APASS
DetailsTony Young
Finaled by inspector at 12/20/2001 10:46:48 AM
BLD-Final12/12/200112/17/200112/17/2001ANR
DetailsRuss Owen
###-####. called contractor no guardrail or hand rail at ext deck also no mechanical final. did not go in house as this is not ready. 12/17/2001 11:11:42 AM
BLD-Framing/Rough-in11/30/200112/3/200112/3/2001ANR
DetailsTony Young
fr insp richard ###-####
BLD-Energy code compliance10/4/200110/4/200110/4/2001PPASS
DetailsTony Young
Scheduled by a contractor via Hello! on 10/04/2001 at 10:28:01. Contact: ###-####.
BLD-Energy code compliance10/3/200110/3/200110/3/2001PNR
DetailsTony Young
Scheduled by a contractor via Hello! on 10/03/2001 at 11:17:22. Contact: ###-####.
BLD-Framing/Rough-in9/27/20019/28/20019/28/2001APASS
DetailsTony Young
shane 9/27/2001 5:08:44 PM
BLD-Framing/Rough-in9/28/20019/28/20019/28/2001PPASS
DetailsTony Young
Scheduled by a contractor via Hello! on 09/28/2001 at 10:41:48. Contact: ###-####.
BLD-Framing/Rough-in9/27/20019/27/20019/27/2001PCANC
DetailsTony Young
Scheduled by a contractor via Hello! on 09/27/2001 at 08:04:23. Contact: ###-####.
BLD-Other9/17/20019/17/20019/17/2001PPART
DetailsTony Young
Scheduled by a contractor via Hello! on 09/17/2001 at 10:37:58. Contact: ###-####.shear ok except on west and south walls 9/17/2001 4:49:47 PM
BLD-Framing/Rough-in9/7/20019/7/20019/7/2001PPART
DetailsTony Young
Scheduled by a contractor via Hello! on 09/07/2001 at 10:46:54. Contact: ###-####.conf. only on framing, no formal inspection made , no approval for ANY cover. 9/7/2001 2:04:20 PM
BLD-Framing/Rough-in7/9/20017/10/20017/10/2001APART
DetailsTony Young
flooring 7/9/2001 2:40:22 PM
front part of floor area 7/10/2001 10:30:34 AM
BLD-Framing/Rough-in7/10/20017/10/20017/10/2001PPART
DetailsTony Young
Scheduled by a contractor via Hello! on 07/10/2001 at 09:02:49. Contact: ###-####.same flooring, joists 7/10/2001 2:03:39 PM
BLD-Conference7/9/20017/9/20017/9/2001PDONE
DetailsTony Young
Scheduled by Inspector: 415 On 7/9/2001 2:32:27 PM phone call, ok to start sheeting floor, leave part open to see, must be per approved plans. 7/9/2001 2:40:00 PM
BLD-Footing6/26/20016/27/20016/27/2001PPART
DetailsTony Young
Scheduled by a contractor via Hello! on 06/26/2001 at 17:34:14. Contact: ###-####.
wip 6/27/2001 2:52:17 PM
BLD-Footing6/21/20016/22/20016/22/2001ANR
DetailsTony Young
early am 6/21/2001 1:40:08 PM
BLD-Footing6/20/20016/21/20016/21/2001PNR
DetailsTony Young
###-####
Plan assigned to (SAM)5/22/2001 6/8/2001 PASS
DetailsSteve Munroe
6/8/2001 13:40:45 SAM - activity updated through activity BLDA022 from case BLD01-01386.
Case Summary (BLD)  6/8/2001  
Plan Review Report  6/8/2001  
Case Summary (BLD)  6/8/2001  
Plan Reviewer's activity  6/8/2001 PEND
6/8/01 8:50 Plan review is done. I am waiting for deck design from the designer.
PLANS/APPL TAKEN TO FRONT DESK  6/8/2001 DONE
Inspection Record Card- Bld  6/8/2001 DONE
Inspection Record Card- Bld  6/8/2001 DONE
Telephone call  6/8/2001 DONE
left mess that permit is ready
Issue PAID IN FULL permit  6/8/2001 DONE
Plan Modification Accepted  6/6/2001 PEND
I received new plans with engineering. Designer still needs to get me a framing plan for the deck off the master.
Plan Reviewer's activity  5/23/2001 PEND
5/23/01 I took the plans to Jim Wyllie to check for hillside requirements. (Terry Records is out today) Areas of house need to be engineered. Foundation may need to be engineered.
Application received  5/16/2001  
Plans ACCEPTED BY PLAN CHECK  5/16/2001