Letter of compliance | | | 4/22/2002 | | DONE |
|
|
|
Letter of Compliance #22340 issued 4-22-02.
|
BLD-Final | 4/18/2002 | 4/19/2002 | 4/19/2002 | A | PASS |
Tom Arcoraci
|
|
|
JEFF ###-#### ok for letter of comp after ok from terry records on hillside requirements 4/19/2002 10:46:33 AM
|
BLD-Grading Inspection | 4/19/2002 | 4/19/2002 | 4/19/2002 | | BOND |
Rita DeYoung
|
|
|
Final grading and drainage has been approved with bond for retaining wall and revegetation of this lot and lots on each side.
|
BLD-Final | 4/17/2002 | 4/18/2002 | 4/18/2002 | A | NR |
Tony Young
|
|
|
440--4579
need hillside signed off, no inspection made 4/18/2002 11:56:49 AM
|
BLD-Final | 4/18/2002 | 4/18/2002 | 4/18/2002 | P | FAIL |
Tony Young
|
|
|
440--4579 4/18/2002 11:22:01 AM
c/n posted/// need hillside, guard rail compliance, firewall seal 4/18/2002 2:14:56 PM
|
BLD-Energy code compliance | 12/12/2001 | 12/13/2001 | 12/13/2001 | A | PASS |
Tony Young
|
|
|
###-#### jeff
|
BLD-Energy code compliance | 12/10/2001 | 12/12/2001 | 12/12/2001 | P | PART |
Tony Young
|
|
|
JEFF ###-####
some corrections still to do 12/12/2001 4:02:22 PM
|
FIRE-Sprinkler Rough-in | 12/12/2001 | 12/12/2001 | 12/12/2001 | A | PART |
Rick Jackson
|
|
|
Added by Inspector: 409 On 12/12/2001 10:29:46 AM okay to cover
|
FIRE-Sprinkler Rough-in | 12/10/2001 | 12/10/2001 | 12/10/2001 | A | FAIL |
Rick Jackson
|
|
|
Added by Inspector: 409 On 12/10/2001 10:29:25 AM need tenting completed prior to cover ceiling
|
BLD-Framing/Rough-in | 12/6/2001 | 12/7/2001 | 12/7/2001 | A | FAIL |
Tony Young
|
|
|
###-#### JEFF
c/n posted, ok to insulate 12/7/2001 11:59:36 AM
|
BLD-Conference | 11/13/2001 | 11/14/2001 | 11/14/2001 | A | PASS |
Tony Young
|
|
|
###-#### JEFF
frame issues, ok 11/14/2001 2:43:20 PM
|
BLD-Conference | 11/14/2001 | 11/14/2001 | 11/14/2001 | P | PASS |
Tony Young
|
|
|
###-#### jeff 11/14/2001 11:43:29 AM
frame walk through 11/14/2001 2:44:04 PM
|
BLD-Framing/Rough-in | 10/29/2001 | 10/29/2001 | 10/29/2001 | P | PART |
Tony Young
|
|
|
###-#### JEFF
ext. shear ok 10/29/2001 2:27:47 PM
|
BLD-Footing | 9/6/2001 | 9/6/2001 | 9/6/2001 | P | PART |
Tony Young
|
|
|
ready at 2 ###-####
wip, int basement ftgs, ok after verbal corrections 9/6/2001 1:43:54 PM
|
BLD-Foundation | 7/31/2001 | 7/31/2001 | 7/31/2001 | P | PART |
Tony Young
|
|
|
###-####
verbal warnings, ok 7/31/2001 2:28:45 PM
|
BLD-Grading Inspection | 7/19/2001 | 7/19/2001 | 7/19/2001 | | PASS |
Rita DeYoung
|
|
|
The footing subgrade has been approved by the geotechnical engineer.
|
BLD-Footing | 7/17/2001 | 7/18/2001 | 7/18/2001 | A | PART |
Tony Young
|
|
|
dane ###-####
ok pending more paper work in future, verbal ok from Bob @ strata testing 7/18/2001 11:43:11 AM
|
BLD-Footing | 7/16/2001 | 7/16/2001 | 7/16/2001 | A | NR |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 07/16/2001 at 07:23:16. Contact: ###-####.
|
Issue PAID IN FULL permit | | | 6/25/2001 | | DONE |
|
|
|
|
Plan assigned to (DJO) | 6/14/2001 | 6/14/2001 | 6/15/2001 | | PASS |
Dan Overy
|
|
|
6/15/2001 06:53:23 DJO - activity updated through activity BLDA022 from case BLD01-01398.
|
Plan Reviewer's activity | | | 6/15/2001 | | DONE |
|
|
|
rob truax will submit engineering for retaining walls to structural inspector before concrete is placed. ok to issue.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/15/2001 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 6/15/2001 | | DONE |
|
|
|
|
Plan Review Report | | | 6/15/2001 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 6/15/2001 | | DONE |
|
|
|
|
Telephone call | | | 6/15/2001 | | DONE |
|
|
|
permit ready
|
Plans ACCEPTED BY PLAN CHECK | | | 6/14/2001 | | |
|
|
|
|
Plan Reviewer's activity | | | 6/14/2001 | | PEND |
|
|
|
its late. will finish tomorrow.
|
Routing - PLANNING | 5/31/2001 | 5/31/2001 | 6/1/2001 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS GRADING | 5/23/2001 | 5/23/2001 | 5/31/2001 | | PASS |
Rita DeYoung
|
|
|
Approved as Category 3 with conditions of approval in letter attached to plans.
|
Routing - PUBLIC WORKS | 5/23/2001 | 5/23/2001 | 5/31/2001 | | PASS |
|
|
|
|
Application received | | | 5/23/2001 | | |
|
|
|
|
Routing - PLAN CHECK | 6/1/2001 | 6/1/2001 | | | PEND |
|
|
|
|
Pending Assignment by DJO | 5/23/2001 | | | | PEND |
Dan Overy
|
|
|
|