Information based on query as of Friday, August 16, 2024.
Permit Information
Permit NumberBLD01-01403
StatusFinaled
Name GEOFF MOSS ATT: STORE DEV. FINANCE
Site Address 1515 W STATE ST
Project NameRITE AID
Customer Number 
ePlanReviewNo
Description
RITE AID PHARMACY DRIVE-THRU AND REMODEL- To construct a 320 sq. ft. pharmacy drive-thru: relocate existing pharmacy; install new pharmacy accessible restroom and create a new 392 sq. ft. store room per approved plans and attachments. DRH01-00016 CUP00-00142 PC# 441-01 Construction is VN and the building is fully fire sprinklered for area.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  6/16/2003  
Fee Review-notes5/23/20015/23/200112/16/2002 DONE
additional value from subs
5/12/03-BRS sent a letter that these fees due need to go to Rite Aid and they have all so sent the statement to them. I updated the information. lh
Permanent occupancy  9/24/2002 DONE
Perm. Occ. Cert. #9375 issued 9-24-02 to Rite Aid (pharmacy drive-thru).
BLD-Final9/23/20029/23/20029/23/2002PPASS
DetailsRuss Owen
Steve, ###-#### - let Cathy know if approved, she has the card. 9/23/2002 2:01:08 PM. Ok perm oc . assuming all required signatures are on card. 9/23/2002 2:01:54 PM
Permanent Occupancy 9/20/20029/20/2002 DONE
Details
Print Occupancy Form  9/20/2002 DONE
FIRE-Final Inspection8/14/20028/15/20028/15/2002APASS
DetailsRick Jackson
Scheduled by a contractor via Hello! on 08/14/2002 at 12:15:23. Contact: ###-####.
BLD-Final8/13/20028/14/20028/14/2002AFAIL
DetailsJim Storey
Scheduled by a contractor via Hello! on 08/13/2002 at 09:41:47. Contact: ###-####. need fire and code sign off. address numbers and bolt racking in back to floor. 8/14/2002 9:55:01 AM
PubWorks Occupancy Approval  5/1/2002 DONE
Drainage project complete, signed permanent occupancy 5/1/02. R.Rokovitz
BLD-Final4/4/20024/5/20024/5/2002PNR
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 04/04/2002 at 19:59:13. Contact: ###-####. obtain other finals...show card for signatures 4/5/2002 5:41:23 PM
FIRE-Final Inspection4/4/20024/5/20024/5/2002AFAIL
DetailsRick Jackson
Scheduled by a contractor via Hello! on 04/04/2002 at 20:00:10. Contact: ###-####. need spare sprinkler heads for new type; submit alarm plans for new duct detector - will need manual pull, audible alarm and smoke above panel; stock within 18 inches of sprinklers in storeroom 4/5/2002 9:39:35 AM
Print Occupancy Form  4/3/2002 DONE
FIRE-Final Inspection3/18/20023/19/20023/19/2002AFAIL
DetailsRick Jackson
###-#### HARRY wrong type of inspection; hydro for overhead okay 3/19/2002 2:27:41 PM
FIRE-Sprinkler Rough-in3/19/20023/19/20023/19/2002PPART
DetailsRick Jackson
Scheduled by Inspector: 409 On 3/19/2002 2:26:39 PM hydro on overhead okay 3/19/2002 2:27:59 PM
FIRE-Final Inspection3/4/20023/5/20023/5/2002PPART
DetailsRick Jackson
Scheduled by a contractor via Hello! on 03/04/2002 at 20:12:47. Contact: ###-####. okay to occupy new pharmacy so the second phase can begin pending approval of structural; general to submit alarm plans for new duct detector to panel that monitors sprinklers, will need a manual pull and horn/strobe 3/6/2002 10:34:20 AM
BLD-Framing/Rough-in3/3/20023/4/20023/4/2002PPASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 03/03/2002 at 20:10:18. Contact: ###-####. fire rated deck installed ok to vover canopy 3/4/2002 2:50:03 PM
FIRE-Sprinkler Rough-in2/21/20022/21/20022/21/2002PPART
DetailsRick Jackson
Scheduled by a contractor via Hello! on 02/21/2002 at 07:07:25. Contact: ###-####. okay to cover pharmacy area 2/21/2002 3:03:47 PM
BLD-Other2/21/20022/21/20022/21/2002PPASS
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 02/21/2002 at 07:09:00. Contact: ###-####. grid ok, need eng's letter re canopy. 2/25/2002 1:34:33 PM
FIRE-Sprinkler Rough-in2/15/20022/15/20022/15/2002ANR
DetailsRick Jackson
Scheduled by a contractor via Hello! on 02/15/2002 at 07:10:00. Contact: ###-####. called Bill Alexander about this and he said no inspections were to occur until he received additional plans; called contractor and he said he would call Bill 2/15/2002 12:35:10 PM
BLD-Framing/Rough-in2/12/20022/13/20022/13/2002AFAIL
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 02/12/2002 at 18:12:10. Contact: ###-####...need clarify canopy/wall connection or other stabilizer ; add seismic at grid. see c/n 2/13/2002 5:35:03 PM
BLD-Footing2/6/20022/6/20022/6/2002PPART
DetailsCarl Dependahl
ft larry pager ###-#### extending depth for a-bolts, ok pend spec insp reports 2/6/2002 12:20:11 PM
Override - Parcel Holds  2/6/2002  
BLD-Framing/Rough-in1/26/20021/28/20021/28/2002APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 01/26/2002 at 10:04:20. Contact: ###-####. int none load brg walls ok to cover 1/28/2002 11:28:48 AM
Issue PAID IN FULL permit  1/15/2002 DONE
Telephone call  11/29/2001 DONE
talked to cindy carlson/will pick up in january/mls
PLANS/APPL TAKEN TO FRONT DESK  9/14/2001 DONE
Telephone call  9/14/2001 DONE
Routing - PLAN CHECK9/7/2001 9/13/2001 PASS
CHANGE STATUS TO (PND)  9/7/2001 DONE
Plan modification
Print Occupancy Form  8/7/2001 DONE
Inspection Record Card- Bld  8/7/2001 DONE
Telephone call  8/7/2001 DONE
left message gave dollar amount and told them they need achd also
Plan resubmittals received  8/6/2001 DONE
two copies of sheet A-3
Routing - PLAN CHECK8/6/2001 8/6/2001 PASS
PLANS/APPL TAKEN TO FRONT DESK  8/6/2001 DONE
Plan assigned to (MLO)5/24/2001 8/6/2001 PASS
DetailsMike Otto
8/6/2001 14:35:13 MLO - activity updated through activity BLDA022 from case BLD01-01403.
Routing - PLAN CHECK7/23/2001 8/3/2001 FAIL
called architect on roof overflow detail missing
Plan resubmittals requested  8/3/2001 FAIL
need sheet A-3 corrected
Plan resubmittals received  8/2/2001 DONE
Plan resubmittals received from BRs Architects, three sets of C-1 and C-2, plus an O&M manual. Forwarded same to Mike Otto. 8/2/01 DAR
Plan resubmittals received  7/23/2001 DONE
Received two sets of plan resubmittals from BRS, forwarded same to Mike Otto. 7/23/01 DAR
Routing - PUBLIC WORKS7/17/2001 7/18/2001 PASS
Plan Review Completed(1st rev)  6/22/2001 FAIL
Routing - FIRE6/19/2001 6/22/2001 PASS
Plan resubmittals received  6/21/2001 DONE
Two sets of plan resubmittals received from BRS Architects , sheets A-1, A-3 and D-1, forworded same to Mike Otto. 6/21/01 DAR
Routing - PLAN CHECK6/21/2001 6/21/2001 PEND
notified by architect that plan was under going changes as requested by owner
Plan resubmittals requested  6/19/2001 DONE
UBC Corrections
Routing - PLAN CHECK6/12/2001 6/19/2001 FAIL
corrections faxed and mailed to architect
Plan resubmittals received  6/14/2001  
1 PLAN CHANGE BULLETIN LETTER
2 RIVISED SD-1 "STAMPED" TOOK TO MIKE OTTO
Routing - PLUMBING6/11/2001 6/12/2001 PASS
per plans and 97 upc
Routing - PLANNING5/31/2001 6/11/2001 PASS
Routing - PUBLIC WORKS5/25/2001 5/31/2001 FAIL
Requires three additional civil sets and O & M manual per Brian M. KMM plans sent to MLO 8/1/2001 - routed back to Public Works on 8-3-2001. MLO
Plan resubmittals received  5/25/2001 DONE
Received copies of sheet D-1 and Survey. Put with plans. KMM
Plans ACCEPTED BY PLAN TECH  5/25/2001 DONE
Plan routing begun/NEW & ADDTN  5/25/2001 DONE
Plan routing begun/NEW & ADDTN  5/24/2001  
waiting for C2 sheet.
Plans ACCEPTED BY PLAN TECH  5/24/2001 FAIL
Requires C2 sheet to be signed. Contacted Cindy Carlson at ###-####
Received Certificate of Value  5/23/2001 DONE
Application received  5/23/2001  
Recd Pcfee & Taken To Pln CK  5/23/2001 DONE