Permit Information
Permit NumberBLD01-01423
StatusFinaled
Name COLLISTER SHOPPING CENTER
Site Address 4724 W STATE ST
Project NameCOLLISTER SHOPPING CNT
Customer Number 
ePlanReviewNo
Description
5/2/07 - See MIS07-00097 for verification of completing work required under this permit. (COLLISTER SHOPPING CENTER Building #2) To upgrade existing vacant building to Type V-1hr. construction and bring area separation walls into code compliance. Work to include providing a one-hour rating for roof-ceiling/beams/supporting columns, fire damper installations at ceiling penetrations, extending parapets to 30" minimum at area separation walls, extending area separation walls through exterior front canopy, providing a 90 minute rated door in area separation wall, new structural modifications to existing exterior canopy, some new interior columns and footings, upgrading east side restrooms to current accessibility standards, installing a portion of rated suspended ceiling, new tempered storefront entry doors and adjacent windows, fire sprinkler work, plumbing work, mechanical work, and electrical work. NO OCCUPANCY IS ALLOWED UNDER THIS PERMIT. This is a Scope of Work Permit. LETTER OF COMPLETION TO BE ISSUED WHEN DONE. Upgrading of exterior canopy to one-hour rated construction is being done under a separate permit (BLD01-01425). NOTE: This building is fully fire sprinklered for area increase. JCB
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  11/14/2014 DONE
BLD-Final7/13/20077/13/20077/13/2007 DONE
DOC - Permit Finaled  7/13/2007  
BLD-Other4/30/20074/30/20074/30/2007PPART
DetailsBob Archibald
Walk through with Dwaine with Trout Architects to determine requirements for proposed library. Findings reported to Jason B.
Case Summary (BLD)  4/30/2007  
(F) Reprint permit  2/7/2007  
BLD-Aging Inspection9/22/20039/22/20039/22/2003 NH
DetailsTony Young
BLD-Aging Inspection7/4/20037/4/20037/4/2003 NH
DetailsTony Young
BLD-Aging Inspection3/24/20033/24/20033/24/2003 FAIL
DetailsTony Young
BLD-Conference1/22/20031/22/20031/22/2003PCANC
DetailsTroy Cobbley
needed to meet with Tony Young to discuss write up. Schedule has not permitted me to do this yet 1/27/2003 8:02:36 AM
Case Summary (BLD)  3/13/2002 DONE
FIRE-Final Inspection1/31/20022/1/20022/1/2002ANR
DetailsTroy Cobbley
work in progress 2/1/2002 10:26:28 AM
BLD-Aging Inspection12/10/200112/10/200112/10/2001 PART
DetailsTony Young
wip 12/11/2001 3:36:29 PM
BLD-Framing/Rough-in10/8/200110/10/200110/10/2001APART
DetailsTony Young
scott ###-####
east side of building #2 ceiling grid ok pending trades approval 10/10/2001 12:18:42 PM
BLD-Footing9/19/20019/20/20019/20/2001PPART
DetailsTony Young
###-#### SCOTT
wip 9/20/2001 3:06:55 PM
FIRE-Conference9/5/20019/6/20019/6/2001APART
DetailsRick Jackson
verify to see if soffit can be covered on # 2? 9/5/2001 4:05:10 PM need sprinkler submittals; soffitt to have access to concealed areas 9/6/2001 2:33:16 PM
BLD-Conference9/5/20019/6/20019/6/2001APART
DetailsTony Young
soffit area w/ fire inspector 9/5/2001 3:37:05 PMeast 1/2 of # 2 ok to cover pending any trade sign offs 9/6/2001 10:22:03 AM
BLD-Framing/Rough-in9/4/20019/5/20019/5/2001PPART
DetailsTony Young
soffit area 9/4/2001 3:24:12 PM
conf. only, not ready all the way 9/5/2001 3:37:48 PM
BLD-Framing/Rough-in8/31/20019/4/20019/4/2001AFAIL
DetailsTony Young
FR INSP-- MIKE ###-####
BLD-Wall cover9/4/20019/4/20019/4/2001PFAIL
DetailsTony Young
look at soffit framing 9/4/2001 11:23:41 AM
NO PLANS YET, PRIOR C/N GOVERNS 9/4/2001 3:25:00 PM
BLD-Framing/Rough-in8/30/20018/30/20018/30/2001PFAIL
DetailsCarl Dependahl
fr scott ###-#### ; add: nails at spliced soffit joists, blocking at edge of mansard, bolts or equal at ledgers; seal req'd draft stops, obtain sprinkler rough in as needed at canopy, show all plans, recall 8/30/2001 4:59:20 PM
BLD-Concrete8/13/20018/14/20018/14/2001APART
DetailsTony Young
part of masonary parapet wall, wip, ok w/ verbal corrections, also other items on conf., 1 hr walls, ceilings, draft stops etc. 8/14/2001 12:26:30 PM
BLD-Framing/Rough-in8/13/20018/13/20018/13/2001PNR
DetailsTony Young
###-#### scott fenwick
Issue PAID IN FULL permit  8/13/2001 DONE
PLANS/APPL TAKEN TO FRONT DESK  8/10/2001 PASS
Inspection Record Card- Bld  8/10/2001 DONE
Print Occupancy Form  8/10/2001 DONE
Telephone call  8/10/2001 DONE
LEFT MESS THAT PERMIT IS READY
Plan assigned to (JCB)6/6/2001 8/10/2001 PASS
DetailsJason Blais
8/10/2001 11:26:23 JCB - activity updated through activity BLDA022 from case BLD01-01423.
Routing - PLAN CHECK8/8/2001 8/10/2001 PASS
Permit and plans approved and taken to front desk.
Plan resubmittals received  8/9/2001 DONE
Received two sets of plan resubmittals from Teal Architects, forwarded same to Jason Blais. 8/9/01 DAR
Plan resubmittals received  8/8/2001 DONE
Received plan resubmittals from Teal Architects, forwarded same to Jason Blais. 8/8/01 DAR
Routing - PLAN CHECK7/18/2001 8/8/2001 FAIL
Went over resubmittals. A few items still need to be adequately addressed. Called architect and went over items verbally. He said he would address and provide additional info.
Plan resubmittals received  8/1/2001 DONE
Received two sets of plan resubmittals from Teal Architects plus small documents, forwarded same to Jason Blais. 8/1/01 DAR
Plan Review Completed(1st rev)  7/18/2001 FAIL
Routing - FIRE7/16/2001 7/18/2001 PASS
Routing - PLAN CHECK6/14/2001 7/16/2001 FAIL
Plan review report sent and faxed to architect. Plan resubmittals and response required for further review. Plans routed to Public Works and Fire Dept.
Plan resubmittals requested  7/16/2001  
Plan resubmittals and response required for further review.
Routing - PUBLIC WORKS7/16/2001 7/16/2001 PASS
Meeting  6/14/2001  
Met with architect Jerry Teal on project. I did an intial cursory review of the project and identified several issues and went over them with the architect. He acknowledged problems and said new plans would be coming with issues resolved. Plans will be held until new submittals are provided.
Plan resubmittals requested  6/14/2001  
Plan resubmittals required for review.
Routing - PLAN CHECK6/6/2001 6/14/2001 FAIL
Met with architect on project. Did initial cursory review and several items were missing or identified as not per code on the plans. Architect acknowledged issues and said new sets of plans would be coming with changes. Plans will be on hold until new submittals are provided.
Application received  5/25/2001  
Recd Pcfee & Taken To Pln CK  5/25/2001 DONE
Fee Review-notes5/25/20015/25/2001