BLD-Final | 12/14/2001 | 12/17/2001 | 12/17/2001 | A | PASS |
Steven Webb
|
|
|
fn occ gary ###-#### c. of c. #20966 issued. 12/17/2001 9:07:39 AM
|
DOC - Permit Finaled | 12/17/2001 | 12/17/2001 | 12/17/2001 | A | PASS |
Steven Webb
|
|
|
Finaled by inspector at 12/17/2001 9:07:54 AM
|
DOC - Permit Finaled | 12/17/2001 | 12/17/2001 | 12/17/2001 | A | PASS |
Steven Webb
|
|
|
Finaled by inspector at 12/17/2001 9:29:22 AM
|
BLD-Final | 12/13/2001 | 12/14/2001 | 12/14/2001 | A | FAIL |
Steven Webb
|
|
|
###-#### CODE 2468 GARAGE DOOR/ BLACK LOCK BOX IS 10957 C/N protection post needed in front of water heater. 12/14/2001 9:50:38 AM
|
BLD-Aging Inspection | 11/6/2001 | 11/6/2001 | 11/6/2001 | | PART |
Steven Webb
|
|
|
wip 11/6/2001 8:20:33 AM
|
BLD-Footing | 9/6/2001 | 9/6/2001 | 9/6/2001 | P | CANC |
Russ Owen
|
|
|
ryan ###-#### ft this must be a mistake house is built and no footings in site at perimeter. 9/6/2001 2:02:31 PM
|
BLD-Energy code compliance | 8/1/2001 | 8/1/2001 | 8/1/2001 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 08/01/2001 at 08:50:07. Contact: ###-####. c/n items complete ok to cover 8/1/2001 4:42:18 PM
|
BLD-Framing/Rough-in | 7/30/2001 | 7/31/2001 | 7/31/2001 | A | PART |
Steven Webb
|
|
|
###-#### C/N--ok to insulate except area in garage where corrections are required. 7/31/2001 12:15:58 PM
|
BLD-Framing/Rough-in | 7/27/2001 | 7/27/2001 | 7/27/2001 | P | FAIL |
Steven Webb
|
|
|
Gary ###-#### C/N issued-do not insulate 7/27/2001 1:36:35 PM
|
BLD-Framing/Rough-in | 7/17/2001 | 7/18/2001 | 7/18/2001 | A | FAIL |
Russ Owen
|
|
|
shear ###-####c/n posted again. 7/18/2001 11:02:49 AM
|
BLD-Other | 7/18/2001 | 7/18/2001 | 7/18/2001 | P | PASS |
Steven Webb
|
|
|
Scheduled by Inspector: 420 On 7/18/2001 1:23:08 PM Shear--ok to side. 7/18/2001 1:23:34 PM
|
BLD-Framing/Rough-in | 7/17/2001 | 7/17/2001 | 7/17/2001 | P | FAIL |
Steven Webb
|
|
|
shear gary ###-#### C/N missing hd at rear (4) and one misinstalled at front entry, (under window) retrofit with equi.. uplift, staples to far apart, additional fastening needed plus verify all blocks on shear panels. 7/17/2001 2:33:54 PM
|
BLD-Foundation | 6/22/2001 | 6/22/2001 | 6/22/2001 | A | PART |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 06/22/2001 at 06:58:55. Contact: ###-####. wip 6/22/2001 10:30:55 AM
|
BLD-Footing | 6/21/2001 | 6/21/2001 | 6/21/2001 | A | PART |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 06/21/2001 at 07:02:39. Contact: ###-####. wip 6/21/2001 8:14:03 AM
|
Issue PAID IN FULL permit | | | 6/15/2001 | | DONE |
|
|
|
|
Telephone call | | | 6/14/2001 | | DONE |
|
|
|
left mess that permit is ready
|
Pending Assignment by DJO | 5/31/2001 | | 6/13/2001 | | DONE |
Dan Overy
|
|
|
6/13/2001 08:35:04 SAM - activity updated through activity BLDA183 from case BLD01-01461.
|
Plan assigned to (SAM) | 6/13/2001 | | 6/13/2001 | | PASS |
Steve Munroe
|
|
|
6/13/2001 15:02:57 SAM - activity updated through activity BLDA022 from case BLD01-01461.
|
Plan Reviewer's activity | | | 6/13/2001 | | PEND |
|
|
|
6/13/01 Only one set is being approved due to excessive red-lining and engineering needed.
|
Print Pending Permit.LaserJet4 | | | 6/13/2001 | | |
|
|
|
|
Plan Review Report | | | 6/13/2001 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/13/2001 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 6/13/2001 | | DONE |
|
|
|
|
Routing - PLANNING | 5/31/2001 | 5/31/2001 | 5/31/2001 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 5/31/2001 | 5/31/2001 | 5/31/2001 | | PASS |
|
|
|
|
Application received | | | 5/31/2001 | | |
|
|
|
|
Routing - PLAN CHECK | 5/31/2001 | 5/31/2001 | | | PEND |
|
|
|
|