(F) Reprint permit | | | 9/6/2002 | | |
|
|
|
|
(F) Reprint permit | | | 3/19/2002 | | DONE |
|
|
|
|
BLD-Final | 11/7/2001 | 11/7/2001 | 11/7/2001 | P | PASS |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 11/07/2001 at 09:12:35. Contact: ###-####. c. of c. #20633 issued. 11/7/2001 2:13:06 PM
|
DOC - Permit Finaled | 11/7/2001 | 11/7/2001 | 11/7/2001 | P | PASS |
Steven Webb
|
|
|
Finaled by inspector at 11/7/2001 2:13:10 PM
|
BLD-Final | 11/5/2001 | 11/6/2001 | 11/6/2001 | A | FAIL |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 11/05/2001 at 09:29:26. Contact: ###-####. c/n issued-- 11/6/2001 10:56:57 AM
|
BLD-Energy code compliance | 9/5/2001 | 9/6/2001 | 9/6/2001 | A | PASS |
Dave Hannah
|
|
|
###-#### all c/n items completed ok to cover 9/6/2001 10:26:04 AM
|
BLD-Framing/Rough-in | 8/31/2001 | 9/4/2001 | 9/4/2001 | A | CANC |
Steven Webb
|
|
|
###-#### Cancelled by contractor--will recall 9/4/2001 11:05:45 AM
|
BLD-Framing/Rough-in | 8/30/2001 | 8/31/2001 | 8/31/2001 | A | FAIL |
Dave Hannah
|
|
|
Jeff ###-#### reinspection c/n on site ok to insulate 8/31/2001 10:37:35 AM
|
BLD-Framing/Rough-in | 8/29/2001 | 8/30/2001 | 8/30/2001 | A | NR |
Tom Arcoraci
|
|
|
###-#### jeff no plans or complete truss eng on site 8/29/2001 9:01:15 PM
|
BLD-Framing/Rough-in | 8/16/2001 | 8/17/2001 | 8/17/2001 | A | PART |
Steven Webb
|
|
|
jeff ###-#### SHEAR-- Need to verify installation of retrofitted hd at framing inspection-- 8/17/2001 11:05:32 AM
|
BLD-Framing/Rough-in | 8/15/2001 | 8/16/2001 | 8/16/2001 | P | FAIL |
Steven Webb
|
|
|
###-#### verbal comments--no approved plans,--retrofit hd needed due to hd being installed under windows and at each side of garage alway from hd's. 8/16/2001 1:31:34 PM
|
BLD-Wall cover | 8/9/2001 | 8/10/2001 | 8/10/2001 | P | NR |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 08/09/2001 at 15:58:53. Contact: .
|
BLD-Foundation | 7/11/2001 | 7/12/2001 | 7/12/2001 | A | PASS |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 07/11/2001 at 11:10:15. Contact: ###-####.
|
BLD-Footing | 7/11/2001 | 7/11/2001 | 7/11/2001 | A | PART |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 07/11/2001 at 06:37:31. Contact: ###-####. wip 7/11/2001 7:54:24 AM
|
BLD-Footing | 7/10/2001 | 7/10/2001 | 7/10/2001 | P | CANC |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 07/10/2001 at 07:55:19. Contact: ###-####. Cancelled by contractor 7/10/2001 12:54:02 PM
|
Issue PAID IN FULL permit | | | 7/6/2001 | | DONE |
|
|
|
|
Plan assigned to (SAM) | 6/19/2001 | | 7/3/2001 | | PASS |
Steve Munroe
|
|
|
7/3/2001 10:28:15 SAM - activity updated through activity BLDA022 from case BLD01-01508.
|
Plan Reviewer's activity | | | 7/3/2001 | | PEND |
|
|
|
7/3/01 Only one set is being approved due to red-lining. Plans will not be excepted from two different sources again.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/3/2001 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 7/3/2001 | | DONE |
|
|
|
|
Telephone call | | | 7/3/2001 | | DONE |
|
|
|
left mess that permit is ready
|
Print Pending Permit.LaserJet4 | | | 6/28/2001 | | |
|
|
|
|
Plan Review Report | | | 6/28/2001 | | |
|
|
|
|
Plan Reviewer's activity | | | 6/28/2001 | | PEND |
|
|
|
6/28/01 7:57 Called and talked to Gordon with ONeill. I told him I need the engineers red-line set to compair with the plans. I'm not getting the bracing on the residence to match the calculations. Plans will sit till I receive the red-lining.
|
Plan Reviewer's activity | | | 6/20/2001 | | PEND |
|
|
|
6/20/01 Plan review is done as far as possible. I left messages on Gordon's phone. I need engineering for the plan plus wall lines for the second floor. Engineering submitted is incomplete, not all wall lines provided.
|
Pending Assignment by DJO | 6/6/2001 | | 6/19/2001 | | DONE |
Dan Overy
|
|
|
6/19/2001 17:11:50 SAM - activity updated through activity BLDA183 from case BLD01-01508.
|
Routing - PUBLIC WORKS | 6/6/2001 | 6/6/2001 | 6/18/2001 | | PASS |
|
|
|
|
Routing - PLANNING | 6/15/2001 | 6/15/2001 | 6/15/2001 | | PASS |
|
|
|
revised plans
|
Office Staff conference/action | | | 6/14/2001 | | FAIL |
|
|
|
gordon with oneil took plans to correct for angie b. pe paper work at pats desk in folder
|
Routing - PLANNING | 6/6/2001 | 6/6/2001 | 6/6/2001 | | FAIL |
|
|
|
|
Telephone call | | | 6/6/2001 | | DONE |
|
|
|
Garage doesn't meet minimum requirements. Left message.
|
Application received | | | 6/6/2001 | | |
|
|
|
|
Routing - PLAN CHECK | 6/18/2001 | 6/18/2001 | | | PEND |
|
|
|
|