Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD01-01509
StatusFinaled
Name THE J.A. HOLMES CORPORATION
Site Address 3149 S WHITE FIR PL
Project NameFLOOD PLAIN
Customer Number 
ePlanReviewNo
Description
To construct a four bedroom, three bathroom 2695 sq. ft. single story, single family dwelling with a attached 856 sq. ft. three car garage and 250 sq. ft. of covered porch. Per approved plans, engineering and requirement list. THIS LOT IS WITHIN THE FLOODPLAIN AREA. A ELEVATION CERTIFICATE IS REQUIRED BEFORE CALLING FOR A ROUGH FRAMING INSPECTION. JIM WYLLIE HAS RELEASED THE NON-BUILD IF CONSTRUCTED IN ACCORDANCE TO THE INFORMATION SUPPLIED BY QUADRANT. CUP98-0116 per Roger Jones. PC#418 (SAM)
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final11/9/200111/13/200111/13/2001APASS
DetailsSteven Webb
###-#### MATT c. of c. #20634 issued 11/13/2001 10:37:51 AM
DOC - Permit Finaled11/13/200111/13/200111/13/2001APASS
DetailsSteven Webb
Finaled by inspector at 11/13/2001 10:37:56 AM
BLD-Final11/9/200111/9/200111/9/2001PFAIL
DetailsSteven Webb
###-#### MATT c/n--tempered glass next to masterb. door, debris in crawl, stripping in 20 min. fire door needed. 11/9/2001 12:55:49 PM
BLD-Aging Inspection10/15/200110/15/200110/15/2001 PART
DetailsSteven Webb
wip 10/15/2001 8:35:47 AM
BLD-Energy code compliance8/13/20018/14/20018/14/2001PPASS
DetailsDave Hannah
BLD-Framing/Rough-in8/13/20018/13/20018/13/2001PPASS
DetailsJim Storey
FR MATT- ###-####
BLD-Framing/Rough-in8/3/20018/6/20018/6/2001APASS
DetailsSteven Webb
###-#### shear ok to side 8/6/2001 9:15:59 AM
BLD-Framing/Rough-in8/2/20018/3/20018/3/2001AFAIL
DetailsSteven Webb
###-#### shear c/n issued. 8/3/2001 10:23:42 AM
BLD-Footing7/11/20017/12/20017/12/2001APART
DetailsSteven Webb
Todd ###-####wip 7/12/2001 11:43:41 AM
Override - Parcel Holds  7/11/2001  
Issue PAID IN FULL permit  7/11/2001 DONE
Case Summary (BLD)  7/11/2001  
Override - Parcel Holds  7/11/2001  
Plan Reviewer's activity  7/10/2001 DONE
received paper work from Jim Wyllie. ok to issue permit. have added post-its to address poor quality of plans. plans are very blurry and almost un-readable. future submittals that are in this condition will not be accepted.
PLANS/APPL TAKEN TO FRONT DESK  7/10/2001 DONE
Override - Parcel Holds  7/10/2001  
Inspection Record Card- Bld  7/10/2001 DONE
Plan assigned to (SAM)6/14/2001 7/10/2001 PASS
DetailsSteve Munroe
7/10/2001 15:21:26 DJO - activity updated through activity BLDA022 from case BLD01-01509.
Plan Reviewer's activity  6/15/2001 PEND
6/15/01 9:35 Called and left a message for Tim, with Briggs Engineering, to call me. I have a question on wall line 1 regarding holdowns. I then called J.A. Holmes Corporation and to get the engineering cover page faxed over.
Case Summary (BLD)  6/15/2001  
Plan Review Report  6/15/2001  
Plan Reviewer's activity  6/15/2001 PEND
6/15/01 10:30 Waiting for cover page of engineering from builder, engineer to call me back and Jim Wyllie to release flood plain.
Pending Assignment by DJO6/6/2001 6/14/2001 DONE
DetailsDan Overy
6/14/2001 15:39:52 SAM - activity updated through activity BLDA183 from case BLD01-01509.
Routing - PLANNING6/6/20016/6/20016/7/2001 PASS
Routing - PUBLIC WORKS6/6/20016/6/20016/7/2001 PASS
Application received  6/6/2001  
Routing - PLAN CHECK6/7/20016/7/2001  PEND