BLD-Final | 11/9/2001 | 11/13/2001 | 11/13/2001 | A | PASS |
Steven Webb
|
|
|
###-#### MATT c. of c. #20634 issued 11/13/2001 10:37:51 AM
|
DOC - Permit Finaled | 11/13/2001 | 11/13/2001 | 11/13/2001 | A | PASS |
Steven Webb
|
|
|
Finaled by inspector at 11/13/2001 10:37:56 AM
|
BLD-Final | 11/9/2001 | 11/9/2001 | 11/9/2001 | P | FAIL |
Steven Webb
|
|
|
###-#### MATT c/n--tempered glass next to masterb. door, debris in crawl, stripping in 20 min. fire door needed. 11/9/2001 12:55:49 PM
|
BLD-Aging Inspection | 10/15/2001 | 10/15/2001 | 10/15/2001 | | PART |
Steven Webb
|
|
|
wip 10/15/2001 8:35:47 AM
|
BLD-Energy code compliance | 8/13/2001 | 8/14/2001 | 8/14/2001 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Framing/Rough-in | 8/13/2001 | 8/13/2001 | 8/13/2001 | P | PASS |
Jim Storey
|
|
|
FR MATT- ###-####
|
BLD-Framing/Rough-in | 8/3/2001 | 8/6/2001 | 8/6/2001 | A | PASS |
Steven Webb
|
|
|
###-#### shear ok to side 8/6/2001 9:15:59 AM
|
BLD-Framing/Rough-in | 8/2/2001 | 8/3/2001 | 8/3/2001 | A | FAIL |
Steven Webb
|
|
|
###-#### shear c/n issued. 8/3/2001 10:23:42 AM
|
BLD-Footing | 7/11/2001 | 7/12/2001 | 7/12/2001 | A | PART |
Steven Webb
|
|
|
Todd ###-####wip 7/12/2001 11:43:41 AM
|
Override - Parcel Holds | | | 7/11/2001 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 7/11/2001 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 7/11/2001 | | |
|
|
|
|
Override - Parcel Holds | | | 7/11/2001 | | |
|
|
|
|
Plan Reviewer's activity | | | 7/10/2001 | | DONE |
|
|
|
received paper work from Jim Wyllie. ok to issue permit. have added post-its to address poor quality of plans. plans are very blurry and almost un-readable. future submittals that are in this condition will not be accepted.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/10/2001 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 7/10/2001 | | |
|
|
|
|
Inspection Record Card- Bld | | | 7/10/2001 | | DONE |
|
|
|
|
Plan assigned to (SAM) | 6/14/2001 | | 7/10/2001 | | PASS |
Steve Munroe
|
|
|
7/10/2001 15:21:26 DJO - activity updated through activity BLDA022 from case BLD01-01509.
|
Plan Reviewer's activity | | | 6/15/2001 | | PEND |
|
|
|
6/15/01 9:35 Called and left a message for Tim, with Briggs Engineering, to call me. I have a question on wall line 1 regarding holdowns. I then called J.A. Holmes Corporation and to get the engineering cover page faxed over.
|
Case Summary (BLD) | | | 6/15/2001 | | |
|
|
|
|
Plan Review Report | | | 6/15/2001 | | |
|
|
|
|
Plan Reviewer's activity | | | 6/15/2001 | | PEND |
|
|
|
6/15/01 10:30 Waiting for cover page of engineering from builder, engineer to call me back and Jim Wyllie to release flood plain.
|
Pending Assignment by DJO | 6/6/2001 | | 6/14/2001 | | DONE |
Dan Overy
|
|
|
6/14/2001 15:39:52 SAM - activity updated through activity BLDA183 from case BLD01-01509.
|
Routing - PLANNING | 6/6/2001 | 6/6/2001 | 6/7/2001 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 6/6/2001 | 6/6/2001 | 6/7/2001 | | PASS |
|
|
|
|
Application received | | | 6/6/2001 | | |
|
|
|
|
Routing - PLAN CHECK | 6/7/2001 | 6/7/2001 | | | PEND |
|
|
|
|