Letter of compliance | | | 6/14/2002 | | DONE |
|
|
|
Letter of Compliance #22520 issued 6-14-02.
|
Fee Review-notes | 6/7/2001 | 6/7/2001 | 4/26/2002 | | DONE |
|
|
|
|
Temporary occupancy | | | 3/26/2002 | | DONE |
|
|
|
Temp. Occ. Cert. #4755 issued 3-26-02 to Republic Storage at Franklin, Bldg. #1.
|
BLD-Final | 3/19/2002 | 3/19/2002 | 3/19/2002 | P | PASS |
Tom Arcoraci
|
|
|
###-#### CORNELL ###-#### CORNELL ok for temp 3/19/2002 4:27:49 PM
|
FIRE-Final Inspection | 3/6/2002 | 3/6/2002 | 3/6/2002 | P | CANC |
Troy Cobbley
|
|
|
Duplicate inspection. Life/safety already finaled 3/6/2002 3:50:59 PM
|
BLD-Framing/Rough-in | 2/28/2002 | 3/1/2002 | 3/1/2002 | A | PART |
Tom Arcoraci
|
|
|
###-#### wip hds 3/1/2002 10:13:41 AM
|
FIRE-Final Inspection | 2/14/2002 | 2/15/2002 | 2/15/2002 | A | PASS |
Troy Cobbley
|
|
|
Fire life/safety finaled 2/15/2002 9:06:59 AM
|
BLD-Final | 2/14/2002 | 2/14/2002 | 2/14/2002 | P | NR |
Tom Arcoraci
|
|
|
TEMP OCC ONLY CORNEL-###-#### OR ###-####
|
BLD-Aging Inspection | 1/21/2002 | 1/21/2002 | 1/21/2002 | | PART |
Tom Arcoraci
|
|
|
|
BLD-Framing/Rough-in | 11/20/2001 | 11/21/2001 | 11/21/2001 | A | PART |
Jim Sly
|
|
|
###-#### CORNELL OK to cover 4 hr wall ... OK to install structural panels. 11/21/2001 9:14:20 AM
|
BLD-Wall cover | 11/9/2001 | 11/9/2001 | 11/9/2001 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by Inspector: 408 On 11/9/2001 3:55:27 PM 4 hour wall ok 11/9/2001 4:43:02 PM
|
BLD-Footing | 10/19/2001 | 10/19/2001 | 10/19/2001 | P | PASS |
Tom Arcoraci
|
|
|
###-####
|
(F) Reprint permit | | | 10/18/2001 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 10/15/2001 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 10/12/2001 | | DONE |
|
|
|
|
Print Occupancy Form | | | 10/12/2001 | | DONE |
|
|
|
|
Routing Off Site - STRUCTURAL | 9/11/2001 | | 10/11/2001 | | DONE |
|
|
|
Contacted pdq to take revised plans of 9/11/01 to outside eng. KMM
|
Routing - PLAN CHECK | 10/10/2001 | | 10/11/2001 | | PASS |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 10/11/2001 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/11/2001 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 10/11/2001 | | DONE |
|
|
|
|
Plan assigned to (M_P) | 6/11/2001 | | 10/11/2001 | | PASS |
Mike Phillips
|
|
|
10/11/2001 08:33:30 M_P - activity updated through activity BLDA022 from case BLD01-01532.
|
Routing - PLAN CHECK | 7/9/2001 | | 10/11/2001 | | DONE |
|
|
|
Mike, I received a copy of letter from Doug Mckibben regarding this permit and the Power Plus establishment. One copy was put in file and gave one copy to Brian M. Additional copies were also given the Marty S. and Wayne G., per your request. KMM 9/14/01 routed revised L-1 sheet to Mike Phillips.
|
Routing - PLANNING | 10/2/2001 | | 10/9/2001 | | PASS |
|
|
|
Approved per DRH01-7 and as noted on Sheet L-1.
|
Plan resubmittals received | | | 10/4/2001 | | DONE |
|
|
|
Received One copy of cover letter, structural notes and revised cert. of value. Two copies of struct. calculations, sheets O, A-8, F-2, RA-1, RA-2 RA-3 and RA-4 and structural response. Routed to Mike P. KMM
|
Routing - FIRE | 9/27/2001 | | 10/1/2001 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 9/11/2001 | | 9/27/2001 | | FAIL |
|
|
|
Review completed, correction notice mailed. Additional informaiton required for further review.
|
Print Pending Permit.LaserJet4 | | | 9/27/2001 | | |
|
|
|
|
Plan resubmittals received | | | 9/14/2001 | | DONE |
|
|
|
received 3 revised copies of L-1 and routed to Mike Phillips.
|
Plan resubmittals received | | | 9/11/2001 | | DONE |
|
|
|
Received three copies of revised struct. calcs., foundation only calcs.building #12 struct. calculations, building calculations for bldg. #12 . Three copies of ledger size steel building plans. Three copies of revised sheets T-1, S-1, S-2, S-3, S-4, OPTIONAL 40'0" SPAN S-3, S-4, S-5, S-6, S-7, S-8, S-9, S-10, S-11, S-12, S-13, S-14, S-15, D-1, D-2, D-3, D-4, D-5, D-6. 0 SP-1, A-1, A-2, A-3, A-4, A-5, A-6, A-7, A-8, F-1. Sent one copy to outside eng. and routed the other two copies to Mike P. KMM
|
Plan Reviewer's activity | | | 7/27/2001 | | HOLD |
|
|
|
Received call from Architect. Changing type of construction to noncombustible. Will be submitting new plans to reflect this change.
Hold removed 9/26/01
|
Routing - PUBLIC WORKS | 7/6/2001 | | 7/9/2001 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 6/27/2001 | | 7/6/2001 | | |
|
|
|
|
Routing - PUBLIC WORKS | 7/5/2001 | | 7/5/2001 | | FAIL |
|
|
|
Incomplete legal description andProof of legal land division required per Jim Rich. 7/5/01 DAR
|
Plan resubmittals received | | | 6/29/2001 | | DONE |
|
|
|
Received two copies of revised sheet SP-1 Routed to Mike P. KMM
|
Routing - PLUMBING | 6/21/2001 | | 6/27/2001 | | PASS |
|
|
|
review not required for residential plumbing, no plumbing associated with storage units
|
Routing - PLANNING | 6/19/2001 | | 6/21/2001 | | FAIL |
|
|
|
Landscape plan does not comply with Design Review conditions of approval, particularly the Hartman St. northwest yard.
|
Routing - PUBLIC WORKS | 6/11/2001 | | 6/19/2001 | | FAIL |
|
|
|
Possible Contamination per Brian M. Incomplete legal description and proof of legal land division per Jim Rich. KMM
|
Plan routing begun/NEW & ADDTN | | | 6/11/2001 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 6/11/2001 | | DONE |
|
|
|
|
Received Certificate of Value | | | 6/7/2001 | | DONE |
|
|
|
|
Application received | | | 6/7/2001 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 6/7/2001 | | |
|
|
|
|