Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD01-01556
StatusFinaled
Name ZION'S BANK
Site Address 890 W MAIN ST
Project NameALEXANDER BLDG
Customer Number 
ePlanReviewNo
Description
(ZION'S BANK) This building is fire sprinklered for story increase. To remodel areas on the 1st floor (2,395 square feet), 2nd floor (1,150 square feet), and 3rd floor (2,590 square feet) of an existing historic building for a new bank/office tenant. Work is to include interior nonbearing walls, interior doors, millwork, structural support for a new safe, an ATM, a marquee, and interior finishes all per approved drawings and plan review conditions on file. The location of fire sprinkler heads shall comply with NFPA 13 as regulated by the Fire Department. A PERMIT FROM ACHD'S CONSTRUCTION DIVISION FOR THE INSTALLATION OF THE STORM DRAIN PIPE AND CONNECTION TO THE TREE WELL IS REQUIRED. VERIFICATION OF A TEMPORARY LICENSE AGREEMENT FROM ACHD TO ALLOW THE MARQUEE AND STORM DRAIN IN THE PUBLIC RIGHT OF WAY IS REQUIRED PRIOR TO OCCUPANCY. PC-0480-01 **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Fee Review-notes7/8/20037/8/20037/8/2003 DONE
Additional values from subcontractors.
Permanent occupancy  5/9/2002 DONE
Perm. Occ. Cert. #9130 issued 5-9-02 to Zion's Bank in the old Alexander Bldg.
BLD-Final4/29/20024/30/20024/30/2002APASS
DetailsTom Arcoraci
###-#### DAVE ok for perm occ 4/30/2002 11:12:12 AM
Permanent Occupancy 4/30/20024/30/2002 DONE
Details
FIRE-Final Inspection4/29/20024/29/20024/29/2002PPASS
DetailsRick Jackson
###-#### DAVE
Telephone call  2/28/2002 DONE
Left msg. w/Chris about current status of temp. occ. - fire alarm control panel issue.
BLD-Aging Inspection1/21/20021/21/20021/23/2002 NR
DetailsCarl Dependahl
zions bank; complete fire "agreement " items 1/23/2002 6:23:03 PM
Conference1/18/20021/18/20021/18/2002 PART
Temp. Occ. Cert. #4593 cont. thru 3-20-02 per Tim Hogland.
BLD-Aging Inspection11/19/200111/19/200111/26/2001 NR
DetailsCarl Dependahl
called bldr, left msg, consulted w/ 409 re FACP upgrade agreement. keep c/n wip 11/26/2001 11:44:06 AM
Code Occupancy Approval  9/20/2001 PASS
NO REAL REQUIREMENTS SO SIGNED FINAL.
Temporary occupancy  9/20/2001 DONE
Temp. Occ. Cert. #4593 issued 9-20-01 to Zion's Bank.
FIRE-Final Inspection9/19/20019/19/20019/19/2001PPART
DetailsRick Jackson
fire fn- terry ###-#### per agreement with Dave Miller the FACP will be upgraded to handle the AHU detectors; smoke fire damper operation; sprinkler monitoring and other items to comply with code 9/19/2001 4:23:08 PM
BLD-Final9/19/20019/19/20019/19/2001PFAIL
DetailsCarl Dependahl
###-####, c/n, fire alarm agreement to be in place, seal floor & shaft penetrations, etc. 9/19/2001 5:56:40 PM
FIRE-Final Inspection9/17/20019/18/20019/18/2001PFAIL
DetailsRick Jackson
TERRY ###-#### AHU detector not wired; need approval from Dave Miller for temp 9/18/2001 5:29:51 PM
FIRE-Final Inspection9/17/20019/17/20019/17/2001PNR
DetailsRick Jackson
fire fn terry-- ###-####
Inspection Record Card- Bld  9/17/2001 DONE
Print Occupancy Form  9/17/2001 DONE
BLD-Framing/Rough-in9/12/20019/12/20019/12/2001PPART
DetailsCarl Dependahl
fire walls dave ###-#### shaft thru 2nd fl ok per detail. 9/12/2001 3:52:28 PM ok to cover vert & horiz. portion of shaft 9/12/2001 3:53:11 PM
BLD-Conference9/11/20019/11/20019/11/2001PPASS
DetailsCarl Dependahl
dave- ###-#### for conf ...rec'd detail; added clarifications to sheet & approved. 9/11/2001 1:43:52 PM
BLD-Framing/Rough-in9/11/20019/11/20019/11/2001PFAIL
DetailsCarl Dependahl
Added by Inspector: 340 On 9/11/2001 1:46:15 PM need install int layers gyp at horiz. shaft; infill 1st floor openings & seal "shaft" & verify s/f damper at bsmt side entry to shaft.
BLD-Conference9/6/20019/7/20019/10/2001APASS
DetailsCarl Dependahl
###-#### keep c/n, still need arch's detail, complete shaft at horiz section. 9/11/2001 1:42:59 PM
BLD-Conference9/7/20019/7/20019/7/2001PPART
DetailsCarl Dependahl
Added by Inspector: 340 On 9/7/2001 5:25:57 PM need archs detail...not submitted as yet.
BLD-Conference9/5/20019/6/20019/6/2001AFAIL
DetailsJim Storey
###-#### early am billy ray not able to attened meetting / remove shaft and resch. 9/6/2001 10:06:58 AM
BLD-Conference9/5/20019/6/20019/6/2001PCANC
DetailsJim Storey
Scheduled by Inspector: 340 On 9/5/2001 5:23:23 PM dave ###-####...re shaft w/ BRS. for Bob
BLD-Framing/Rough-in9/4/20019/5/20019/5/2001AFAIL
DetailsCarl Dependahl
###-####, c/n, shaft details, hvac penetrations at bsmt lid, fireblocks at soffits, need fire sprinkler r/i 9/4/2001 4:53:10 PM
BLD-Framing/Rough-in9/4/20019/5/20019/5/2001AFAIL
DetailsCarl Dependahl
###-####; keep c/n re shaft; wants to meet w/ arch onsite 9-6 9/5/2001 5:25:47 PM
BLD-Conference9/5/20019/5/20019/5/2001APASS
DetailsCarl Dependahl
Added by Inspector: 340 On 9/5/2001 10:29:13 AM w/ ah re shaft const...keep c/n
BLD-Framing/Rough-in8/7/20018/8/20018/8/2001PPART
DetailsCarl Dependahl
9415036 8/7/2001 5:01:06 PM; 1st floor ok pend elec. 8/8/2001 3:32:36 PM
BLD-Conference8/7/20018/7/20018/7/2001APART
DetailsCarl Dependahl
Added by Inspector: 340 On 8/7/2001 11:25:53 AM ok to cover back of ATM kiosk pend elec...
BLD-Conference8/3/20018/6/20018/6/2001APASS
DetailsCarl Dependahl
conf-- insp terry-- ###-#### ; c/n issued re roof drains; ok to use 3rd floor offices pending fire ok 8/6/2001 11:53:40 AM
FIRE-Conference8/6/20018/6/20018/6/2001PPART
DetailsRick Jackson
Terry ###-#### okat to occupy 3rd floor 8/6/2001 4:09:42 PM
BLD-Final8/2/20018/3/20018/3/2001PNR
DetailsCarl Dependahl
###-####; n/r...need consult w/ GS & plan chk re partial ok for occupancy 8/6/2001 9:42:25 AM
Issue PAID IN FULL permit  7/19/2001 DONE
Routing - PLAN CHECK7/16/2001 7/17/2001 PASS
Drawings approved after letter from ACHD.
Plan Reviewer's activity  7/17/2001 PASS
Received letter from ACHD. ACHD supported issuing the building permit with the following conditions: (1) Zion's Bank obtain a right-of-way permit from ACHD's Construction Division for the installation of the storm drain pipe and connection to the tree well, and (2) Zion's Bank provide verification that a Temporary License Agreement granted by ACHD is in effect prior to occupancy.
PLANS/APPL TAKEN TO FRONT DESK  7/17/2001 PASS
Inspection Record Card- Bld  7/17/2001 DONE
Print Occupancy Form  7/17/2001 DONE
Routing - PLAN CHECK7/10/2001 7/16/2001  
Failed 2nd UBC review. At CJW's desk waiting for easment documentation.
Plan Reviewer's activity  7/16/2001  
Failed 2nd UBC review. Waiting for easment documentation to allow the marquee.
Routing - PLANNING7/16/2001 7/16/2001 PASS
Approve
Plan resubmittals received  7/13/2001 DONE
Received plan resubmittals from BRS Architects, two sets of sheets A-1, A-2 and A-5, forwarded same to CArl Westfall. 7/13/01 DAR
Plan Reviewer's activity  7/11/2001  
Sent letter to architect. Previous letter had been "returned for proper postage". Report was faxed July 10, 2001.
Routing - FIRE7/5/2001 7/9/2001 PASS
Plan Review Completed(1st rev)  7/9/2001  
Failed first UBC and Planning/Zoning reviews.
Routing - PLAN CHECK6/28/2001 7/5/2001  
Failed first UBC review.
Plan Reviewer's activity  7/3/2001  
Failed first UBC review. UBC plan review started July 3, 2001 and finished July 5, 2001. A response from the architect was required. See the conditions list.
Routing - PLANNING6/18/2001 6/28/2001  
Failed first P&Z review. Continue to route while historic issues are being discussed with the architect.
Routing - PUBLIC WORKS6/15/2001 6/18/2001 PASS
Plan assigned to (CJW)6/15/2001 6/15/2001  
DetailsCarl Westfall
Drawings received June 12, 2001. 2 weeks (June 26). 3 weeks (July 3). 4 weeks (July 10).
Application received  6/12/2001  
Recd Pcfee & Taken To Pln CK  6/12/2001  
Plans ACCEPTED BY PLAN TECH  6/12/2001 DONE
Received Certificate of Value  6/12/2001 DONE