Fee Review-notes | 6/12/2001 | 6/12/2001 | 12/16/2002 | | DONE |
|
|
|
|
Permanent occupancy | | | 7/25/2002 | | DONE |
|
|
|
Perm. Occ. Cert. #9278 issued 7-25-02 to the Boise Samaritan Village.
|
Permanent Occupancy | | 7/24/2002 | 7/24/2002 | | DONE |
|
|
|
|
Temporary occupancy | | | 4/25/2002 | | DONE |
|
|
|
Temp. Occ. Cert. #4796 issued 4-25-02 to Boise Samaritan Village.
|
BLD-Final | 4/23/2002 | 4/24/2002 | 4/24/2002 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 04/23/2002 at 16:18:54. Contact: ###-####.ok for perm occ 4/24/2002 2:57:39 PM
|
FIRE-Final Inspection | 4/19/2002 | 4/22/2002 | 4/22/2002 | P | PASS |
Troy Cobbley
|
|
|
life safety, fire alarm and fire sprinkler finaled 4/23/2002 11:50:32 AM
|
FIRE-Alarm Testing | 4/19/2002 | 4/22/2002 | 4/22/2002 | P | CANC |
Troy Cobbley
|
|
|
duplicate inspection 4/23/2002 11:50:57 AM
|
BLD-Wall cover | 3/10/2002 | 3/11/2002 | 3/11/2002 | A | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 03/10/2002 at 09:58:01. Contact: ###-####. Ok to rock drop ceiling in kitchen. 3/11/2002 10:55:54 AM
|
BLD-Wall cover | 3/8/2002 | 3/8/2002 | 3/8/2002 | P | FAIL |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 03/08/2002 at 08:29:46. Contact: ###-####. needs to fire caulk around penetrations walls and ceiling 3/8/2002 3:27:13 PM
|
BLD-Wall cover | 3/4/2002 | 3/4/2002 | 3/4/2002 | P | PASS |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 03/04/2002 at 08:53:10. Contact: ###-####.
|
BLD-Wall cover | 3/1/2002 | 3/1/2002 | 3/1/2002 | P | FAIL |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 03/01/2002 at 10:01:55. Contact: ###-####. corridor back to back boxes req protection also there are side mounted fire dampers with pipe penetrations near them with no protection and other sheetrock holes. Talked with job supper will correct and recall. 3/1/2002 5:10:22 PM
|
BLD-Wall cover | 2/25/2002 | 2/26/2002 | 2/26/2002 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 02/25/2002 at 18:59:01. Contact: ###-####. need to start 2 hr assemby for insp. steel ele boxes need protection of thrur pendatratinon exit head height min 7 ft. okto start coridor gyp but not with out reinsp of 2 hr.. 2/26/2002 11:59:03 AM
|
BLD-Conference | 2/19/2002 | 2/20/2002 | 2/20/2002 | A | DONE |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 02/19/2002 at 16:47:53. Contact: . contractor added walls in attic space cutting off path of smoke to alarms needs to remove walls and bld as per plans so smoke det will work will mantain 1hr construction 2/20/2002 11:24:37 AM
|
BLD-Wall cover | 2/12/2002 | 2/13/2002 | 2/13/2002 | A | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 02/12/2002 at 16:13:23. Contact: .
ok to cover main hall pending electrical rouph 2/13/2002 3:01:59 PM
|
BLD-Framing/Rough-in | 2/7/2002 | 2/8/2002 | 2/8/2002 | A | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 02/07/2002 at 16:39:06. Contact: .
ok to insulate main room, may need to remove some areas for trades, and fire caulking at top plate 2/8/2002 10:00:03 AM
|
BLD-Framing/Rough-in | 2/4/2002 | 2/5/2002 | 2/5/2002 | A | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 02/04/2002 at 12:52:24. Contact: ###-####.
ok to cover north rooms 2/5/2002 10:26:20 AM
|
BLD-Conference | 2/5/2002 | 2/5/2002 | 2/5/2002 | A | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 2/5/2002 10:33:16 AM firestopping, prior c/n w/ Tony & Joel at site
|
BLD-Framing/Rough-in | 1/28/2002 | 1/28/2002 | 1/28/2002 | P | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 01/28/2002 at 08:35:45. Contact: .
ok to cover south and west walls, pending trades 1/28/2002 3:43:07 PM
|
BLD-Framing/Rough-in | 1/23/2002 | 1/23/2002 | 1/23/2002 | P | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 01/23/2002 at 08:06:48. Contact: ###-####.see c/n for remaining items 1/23/2002 4:37:29 PM
|
BLD-Framing/Rough-in | 1/14/2002 | 1/15/2002 | 1/15/2002 | A | FAIL |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 01/14/2002 at 15:51:31. Contact: .c/n: hd's, beam support details, 1hr assemblies not done...ok to pre-rock mech chase w/ other trade ok's. Partial insp. only. 1/15/2002 12:32:12 PM
|
BLD-Framing/Rough-in | 1/9/2002 | 1/10/2002 | 1/10/2002 | A | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 01/09/2002 at 15:37:08. Contact: .
ext shear ok 1/10/2002 11:58:21 AM
|
BLD-Framing/Rough-in | 1/8/2002 | 1/9/2002 | 1/9/2002 | A | FAIL |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 01/08/2002 at 14:03:22. Contact: .
ext. shear needs more nailing per plans 1/9/2002 11:41:37 AM
|
BLD-Framing/Rough-in | 12/19/2001 | 12/20/2001 | 12/20/2001 | P | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 12/19/2001 at 14:29:57. Contact: .
roof nailing, wip, ok 12/20/2001 3:52:12 PM
|
BLD-Foundation | 11/25/2001 | 11/26/2001 | 11/26/2001 | A | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 11/25/2001 at 05:47:53. Contact: .
wip, pending si report 11/26/2001 10:25:06 AM
|
BLD-Foundation | 11/19/2001 | 11/20/2001 | 11/20/2001 | A | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 11/19/2001 at 11:33:51. Contact: .
pan deck? pending si report 11/20/2001 11:33:34 AM
|
BLD-Foundation | 11/1/2001 | 11/2/2001 | 11/2/2001 | A | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 11/01/2001 at 13:16:24. Contact: . wip pending report from strata 11/2/2001 10:21:13 AM
|
BLD-Footing | 10/26/2001 | 10/26/2001 | 10/26/2001 | P | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 10/26/2001 at 09:54:24. Contact: .
wip, pending si report 10/26/2001 2:49:58 PM
|
BLD-Footing | 10/23/2001 | 10/24/2001 | 10/24/2001 | A | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 10/23/2001 at 13:32:00. Contact: .
pending si report 10/24/2001 12:05:42 PM
|
Issue PAID IN FULL permit | | | 9/21/2001 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 9/13/2001 | | 9/14/2001 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/14/2001 | | DONE |
|
|
|
|
Print Occupancy Form | | | 9/14/2001 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 9/14/2001 | | DONE |
|
|
|
|
Telephone call | | | 9/14/2001 | | DONE |
|
|
|
|
Plan assigned to (MLO) | 6/12/2001 | | 9/14/2001 | | PASS |
Mike Otto
|
|
|
9/14/2001 10:01:18 MLO - activity updated through activity BLDA022 from case BLD01-01560.
|
Plan resubmittals received | | | 9/13/2001 | | DONE |
|
|
|
Received two copies of revised sheets S2.3 & S3.2 Routed to Mike O. kmm
|
Case Summary (BLD) | | | 9/13/2001 | | |
|
|
|
|
Routing - PLAN CHECK | 9/5/2001 | | 9/7/2001 | | PEND |
|
|
|
missing structural sheets for revised roof framing. Architect contacted 9/7/2001
|
Routing - PLANNING | 9/4/2001 | | 9/5/2001 | | PASS |
|
|
|
Pass per conditions of approval from CUP01-00066.
|
Plan resubmittals received | | | 9/5/2001 | | DONE |
|
|
|
Received three copies of revised sheets A1.2, A5.1, A7.1, A8.1, A8.3, and one cover letter. Routed to Mike O. kmm
|
Routing - PLAN CHECK | 8/10/2001 | | 8/23/2001 | | FAIL |
|
|
|
corrections faxed and mailed to architect.
|
Plan resubmittals received | | | 8/10/2001 | | DONE |
|
|
|
Received two sets plan resubmittals and a small document , forwarded same to Mike Otto. 8/10/01 DAR
|
Plan Review Completed(1st rev) | | | 7/13/2001 | | FAIL |
|
|
|
plans returned to plan review
|
Routing - FIRE | 7/11/2001 | | 7/13/2001 | | PASS |
|
|
|
|
Plan resubmittals requested | | | 7/11/2001 | | FAIL |
|
|
|
UBC corrections
|
Routing - PLAN CHECK | 6/27/2001 | | 7/11/2001 | | FAIL |
|
|
|
corrections faxed and mailed to architect
|
Routing - PLUMBING | 6/20/2001 | | 6/27/2001 | | PASS |
|
|
|
per plans and 97 upc, additional cross connection may be required, dish washer air gap fitting will be required a on dishwasher drain.
|
Routing - PLANNING | 6/13/2001 | | 6/20/2001 | | FAIL |
|
|
|
|
Routing - PUBLIC WORKS | 6/12/2001 | | 6/13/2001 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 6/12/2001 | | |
|
|
|
|
Application received | | | 6/12/2001 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 6/12/2001 | | DONE |
|
|
|
|