Information based on query as of Saturday, August 17, 2024.
Permit Information
Permit NumberBLD01-01600
StatusFinaled
Name PIZZA HUT
Site Address 2450 S VISTA AVE
Project NamePIZZA HUT
Customer Number 
ePlanReviewNo
Description
PIZZA HUT RESTAURANT - TO CONSTRUCT A NEW 2380 SQUARE FOOT, ONE STORY, WOOD FRAMED PIZZA RESTAURANT BUILDING WITH SIT DOWN, PICKUP AND DELIVERY. THIS PERMIT ALSO INCLUDES RELATED SITE IMPROVEMENTS. ALL CONSTRUCTION PER THE APROVED PLANS AND ATTACHED COMMENT LIST. DRH01-00091/PC#491-01/JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Permanent occupancy UNPAID FEE  3/15/2002 DONE
Perm. Occ. Cert. #9070 issued 3-15-02 to Pizza Hut.
Permanent Occupancy 3/14/20023/14/2002 DONE
Details
Fee Review-notes6/14/20016/14/20011/14/2002 DONE
4/30 left mesg for allen H. to call me back.
Temporary occupancy  11/21/2001 PART
Temp. Occ. Cert. #4660 issued 11-21-01 to Pizza Hut.
BLD-Grading Inspection11/20/200111/20/200111/20/2001PPASS
DetailsRita DeYoung
###-#### Final not grading--signed--ok for issuance of Temp. c. of o. A few signatures are need under perm. before the perm c. of o. can be issued.
11/20/2001 3:09:19 PM
FIRE-Final Inspection11/19/200111/19/200111/19/2001PPASS
DetailsRick Jackson
###-#### charlie
Code Occupancy Approval  11/19/2001 PASS
Inspected and passed.
BLD-Framing/Rough-in11/13/200111/14/200111/14/2001APASS
DetailsJim Storey
###-#### ceilling ok for cover. 11/14/2001 10:48:14 AM
Plan resubmittals received  11/14/2001 DONE
Received four copies of sheet C1.1. Put one in records and one with inspector and two to Brian M. KMM
BLD-Final11/13/200111/13/200111/13/2001PNR
DetailsJim Storey
fn ###-####- charlie ceilling ok for cover not a final insp. 11/14/2001 10:49:31 AM
BLD-Framing/Rough-in11/8/200111/9/200111/9/2001ANR
DetailsDave Hannah
CEILING GRID ###-#### CHARLIE
BLD-Framing/Rough-in11/9/200111/9/200111/9/2001PPART
DetailsRuss Owen
CEILING GRID CHARLIE ###-#### . Needs some perimeter wires over the 3 compartment sink . will leave tile out at this area to verify. 11/9/2001 1:45:00 PM
BLD-Framing/Rough-in10/8/200110/9/200110/9/2001APART
DetailsJim Storey
###-#### charlie ###-#### charlie hip ridge hangers to be secured at ceilling insp. 10/9/2001 3:55:53 PM
Plan resubmittals received  10/2/2001 DONE
recieved 4 revised copies of E5.1 and routed to Mike Hall
BLD-Framing/Rough-in9/27/20019/27/20019/27/2001PFAIL
DetailsCarl Dependahl
###-#### CHARLIE c/n: substitution of members (3x or PSL cols, etc.).., install all hdwe; nailing basically ok to start siding. 9/27/2001 4:27:19 PM
BLD-Foundation9/11/20019/11/20019/11/2001PPASS
DetailsSteven Webb
for main floor charlie-- ###-#### floor slab 9/11/2001 2:17:27 PM
BLD-Foundation8/28/20018/29/20018/29/2001APASS
DetailsTom Arcoraci
###-#### CHARLIE
BLD-Footing8/27/20018/28/20018/28/2001APASS
DetailsSteven Webb
FT INSP CHARLIE ###-####
Issue PAID IN FULL permit  8/17/2001 DONE
Plan resubmittals received  8/2/2001 DONE
Received plan resubmittals from BRS Architects two sets of sheet S3.2, forwarded same to John Menard. 8/2/01 DAR
Routing - PLAN CHECK7/30/2001 8/1/2001 PASS
PLANS/APPL TAKEN TO FRONT DESK  8/1/2001 PASS
Print Occupancy Form  8/1/2001 DONE
Inspection Record Card- Bld  8/1/2001 DONE
Telephone call  8/1/2001 DONE
permit ready left message with Allan Humphries and also let him know we need ACHD before issuance.
Plan assigned to (JCM)6/18/2001 8/1/2001 PASS
DetailsJohn Menard
8/1/01 13:45:44 JCM - activity updated through activity BLDA022 from case BLD01-01600.
Routing - FIRE7/25/2001 7/30/2001 PASS
Approved without written comment
Plan resubmittals received  7/30/2001 DONE
Received plan resubmittals from BRS Architects, Drew Ebright,Two sets, forwarded same two John Menard. 7/30/01 DAR
Plan Review Completed(1st rev)  7/30/2001 FAIL
Plan resubmittals requested  7/25/2001  
Mailed the architect of record a copy of the plan review comment list requesting revisions. JCM
Routing - PLAN CHECK7/9/2001 7/24/2001 FAIL
took to john m
Routing - PLUMBING7/9/2001 7/9/2001 PASS
jerry v passed 7/9/2001
Routing - PUBLIC WORKS7/3/2001 7/9/2001 PASS
Plan resubmittals requested  7/3/2001  
3 site lighting plan e5.1 put with plans.
Routing - PLANNING6/21/2001 6/25/2001 PASS
Approved per DRH01-00091.
Routing - PUBLIC WORKS6/18/2001 6/21/2001 FAIL
Street lighting plans required per Bill Colson. 6/21/01 DAR
Plan routing begun/NEW & ADDTN  6/18/2001 DONE
Plans ACCEPTED BY PLAN TECH  6/18/2001 DONE
Received Certificate of Value  6/15/2001 DONE
Application received  6/14/2001  
Recd Pcfee & Taken To Pln CK  6/14/2001  
Received Certificate of Value  6/14/2001 DONE