Information based on query as of Sunday, August 18, 2024.
Permit Information
Permit NumberBLD01-01621
StatusFinaled
Name GOLDY'S - HYDE PARK
Site Address 1513 N 13TH ST
Project NameGOLDY'S - HYDE PARK
Customer Number 
ePlanReviewNo
Description
(GOLDY'S - HYDE PARK) This building is NOT fire sprinklered. To create a 3,300 square foot bakery and full-service restaurant within a historic building. An interior nonbearing frame wall is being removed to combine areas. Partial demolition of interior masonry walls is covered under this permit. Work is to include an interior shear wall, interior nonbearing walls, headers at masonry wall openings, a freezer and cooler, a 1-hr shaft for a grease duct, a restroom accessible to the disabled, and ramps all per approved drawings, engineering, and plan review conditions on file. The maximum occupant load of the public area (66) shall be posted on an approved sign near the main exit. (10-12-01) OCCUPANCY SHALL NOT BE ALLOWED UNTIL A RECORD OF SURVEY IS APPROVED AND A COPY OF THE RECORDED DEED IS RECEIVED. PC-0493-01 CZC01-00118 **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Plan Review Report  3/18/2015  
(F) Reprint permit  7/14/2004 DONE
Fee Review-notes7/8/20037/8/20037/8/2003 DONE
Additional values from subcontractors.
Permanent occupancy  11/21/2002 DONE
Perm Occupancy issued 11/21/02 to Goldy's
BLD-Conference11/19/200211/19/200211/19/2002PPASS
DetailsCarl Dependahl
w/301 re final 11/19/02 4:31:49 PM
BLD-Final11/15/200211/18/200211/18/2002APASS
DetailsJim Storey
Carl, all others have signed off, are you ready to approve for perm. occ.? ok per temp sign off. 11/19/2002 2:28:31 PM
Routing - PLANNING Land Div11/4/2002 11/4/2002 PASS
Record of Survey and deeds recorded. Deeds recorded March 29, 2002.
Override - Parcel Holds  3/4/2002  
Temporary occupancy  3/4/2002 DONE
Temp. Occ. Cert. #4740 issued 3-4-02 to Goldy's Restaurant.
BLD-Final3/1/20023/1/20023/1/2002PPART
DetailsCarl Dependahl
###-####...c/n, ok for t/o ; verify pub wks, code enf...3/1/2002 4:52:20 PM 3/1/2002 5:07:07 PM
FIRE-Final Inspection2/28/20023/1/20023/1/2002APASS
DetailsRick Jackson
###-####
Permanent Occupancy 3/1/20023/1/2002 DONE
Details
Override - Parcel Holds  3/1/2002  
Override - Parcel Holds  2/28/2002 DONE
DetailsRita DeYoung
Parcel Tag Notes: No permanent occupancy permit or approval is to be granted until a Record of Survey is completed (with recorded deeds), as approved by Tim H.- see Erstad Thornton Architects letter dated September 18, 2001. - Karen Reason for OverRide:
Override - Parcel Holds  2/28/2002 DONE
DetailsRita DeYoung
Parcel Tag Notes: No permanent occupancy permit or approval is to be granted until a Record of Survey is completed (with recorded deeds), as approved by Tim H.- see Erstad Thornton Architects letter dated September 18, 2001. - Karen Reason for OverRide:
Override - Parcel Holds  2/28/2002 DONE
DetailsRita DeYoung
Parcel Tag Notes: No permanent occupancy permit or approval is to be granted until a Record of Survey is completed (with recorded deeds), as approved by Tim H.- see Erstad Thornton Architects letter dated September 18, 2001. - Karen Reason for OverRide:
Override - Parcel Holds  2/27/2002  
Override - Parcel Holds  2/27/2002  
BLD-Final2/4/20022/4/20022/4/2002PPART
DetailsRuss Owen
###-#### . Wanted a temp oc of the bakery area only work is not complete in other areas tied to bld permit , I told th 2/4/2002 3:09:43 PM em it would be possible as long as ,agencies would approve , IE: health dpt,fire/life safety,plumbing,electrical. With written approval. 2/4/2002 3:12:07 PM
Override - Parcel Holds  2/4/2002 DONE
DetailsAnnett Moore
Parcel Tag Notes: No permanent occupancy permit or approval is to be granted until a Record of Survey is completed (with recorded deeds), as approved by Tim H.- see Erstad Thornton Architects letter dated September 18, 2001. - Karen Reason for OverRide:
FIRE-Final Inspection1/31/20022/1/20022/1/2002PPART
DetailsRick Jackson
BAKERY SECTION ONLY LARRY - ###-#### okay to use bakery type one hood only 2/1/2002 4:48:11 PM
Override - Parcel Holds  1/31/2002 DONE
DetailsDarla L Downs
Parcel Tag Notes: No permanent occupancy permit or approval is to be granted until a Record of Survey is completed (with recorded deeds), as approved by Tim H.- see Erstad Thornton Architects letter dated September 18, 2001. - Karen Reason for OverRide: THIS IS JUST FOR AN INSPECTION ONLY
BLD-Conference1/25/20021/25/20021/25/2002PPASS
DetailsCarl Dependahl
Added by Inspector: 340 On 1/25/2002 12:03:24 PM w/ Larry re eng'g ... ok to continue, call fire for insp at bakery hood
BLD-Framing/Rough-in1/16/20021/17/20021/17/2002PPART
DetailsCarl Dependahl
###-####, c/n, shear wall ok 1/17/2002 7:14:14 PM 1/17/2002 7:15:11 PM
Override - Parcel Holds  1/16/2002 DONE
DetailsRita DeYoung
Parcel Tag Notes: No occupancy permit or approval is to be granted until a Record of Survey is completed (with recorded deeds), as approved by Tim H.- see Erstad Thornton Architects letter dated September 18, 2001. - Karen Reason for OverRide:
Override - Parcel Holds  1/16/2002 DONE
DetailsRita DeYoung
Parcel Tag Notes: No occupancy permit or approval is to be granted until a Record of Survey is completed (with recorded deeds), as approved by Tim H.- see Erstad Thornton Architects letter dated September 18, 2001. - Karen Reason for OverRide:
BLD-Footing1/9/20021/10/20021/10/2002APART
DetailsRuss Owen
###-####. Ok except for the interior hold-down footings c/n posted . Also not they have added an exterior non bearing frost protected mono-slab footing to the front area bettween the existing bearing post supports this was not shown on plans to be done. 1/10/2002 5:12:13 PM
Override - Parcel Holds  1/9/2002 DONE
DetailsAnnett Moore
Parcel Tag Notes: No occupancy permit or approval is to be granted until a Record of Survey is completed (with recorded deeds), as approved by Tim H.- see Erstad Thornton Architects letter dated September 18, 2001. - Karen Reason for OverRide:
BLD-Conference12/31/20011/2/20021/2/2002APART
DetailsTony Young
LARRY ###-####
conf. w/ Jim Schmere on electical concerns, so. parapet wall ok as long as it is not touched 1/2/2002 11:20:37 AM
Override - Parcel Holds  12/31/2001 DONE
DetailsDarla L Downs
Parcel Tag Notes: No occupancy permit or approval is to be granted until a Record of Survey is completed (with recorded deeds), as approved by Tim H.- see Erstad Thornton Architects letter dated September 18, 2001. - Karen Reason for OverRide: THIS IS A CONF ONLY
BLD-Conference12/19/200112/20/200112/20/2001PPASS
DetailsTony Young
Profit meeting for 1:30 call Larry ###-####
met w/ trades, other inspectors, arch., eng., owners, etc. all went well, should be a clean job from here out 11/2 hrs 12/20/2001 3:11:01 PM
Override - Parcel Holds  12/19/2001  
BLD-Conference12/12/200112/13/200112/13/2001APART
DetailsTony Young
LARRY ###-####
spent 2 hrs looking at project, need re-submittals on changes, lots of items due to old building w/ lots of concerns, need contractor to call when ready for profit mtg w/ all trades and inspectors to be more effective on poject w/ hopefull dates for opening. 12/13/2001 12:44:46 PM
Override - Parcel Holds  12/12/2001 DONE
DetailsDarla L Downs
Parcel Tag Notes: No occupancy permit or approval is to be granted until a Record of Survey is completed (with recorded deeds), as approved by Tim H.- see Erstad Thornton Architects letter dated September 18, 2001. - Karen Reason for OverRide: NEEDS A CONF
Override - Parcel Holds  12/7/2001  
Issue PAID IN FULL permit  12/7/2001 DONE
Telephone call  11/29/2001 DONE
talked to rob thornton/will pickup in a week or so/discussing fees for swr with public works 1st/mls
Routing - PLAN CHECK9/24/2001 10/12/2001  
Waiting for resolution of property issues (density reduction and/or land division). Routed back to Public Works.
Routing - PUBLIC WORKS10/12/2001 10/12/2001 PASS
Per letter signed by Tim Hogland, occupancy shall not be allowed until a record of survey is approved and a copy of the recorded deed is received.
Routing - PLAN CHECK10/12/2001 10/12/2001 PASS
Per Tim Hogland's approval, occupancy shall not be allowed until a record of survey is approved and a copy of the recorded deed is received.
PLANS/APPL TAKEN TO FRONT DESK  10/12/2001 PASS
Print Occupancy Form  10/12/2001 DONE
Override - Parcel Holds  10/12/2001  
Inspection Record Card- Bld  10/12/2001 DONE
Telephone call  10/12/2001 DONE
permit ready and need ACHD
Plan assigned to (CJW)6/21/2001 10/12/2001 PASS
DetailsCarl Westfall
10/12/01 12:55:29 CJW - activity updated through activity BLDA022 from case BLD01-01621.
Routing - PLAN CHECK8/13/2001 9/24/2001  
Failed 2nd UBC review. Need deed.
Routing - PLANNING9/24/2001 9/24/2001 PASS
Routing - PUBLIC WORKS9/24/2001 9/24/2001  
Failed per Karen Gallagher. Legal land question.
Plan resubmittals received  9/20/2001 DONE
Received revised sheets a0.01, a2.01, a2.11, a2.31, a3.21, a3.22, a5.11, a6.11, one copy of cover letter. Routed to Carl W. KMM
Routing - PLAN CHECK7/16/2001 8/13/2001  
Waiting for resubmittals. Rerouted to Planning.
Routing - PLANNING8/13/2001 8/13/2001  
Failed 2nd Planning review.. Plans show 44 seats. CZC01-00118 limits occupants to 32 seats.
Plan Review Completed(1st rev)  7/16/2001  
Failed first UBC and Planning review.
Routing - FIRE7/11/2001 7/16/2001 PASS
Routing - PLAN CHECK7/5/2001 7/11/2001  
Failed first UBC review.
Plan Reviewer's activity  7/10/2001  
Failed first UBC review. UBC review started July 10, 2001 and finished the next day. A response was required from the architect. A report was mailed to him. See the conditions list.
Routing - PLUMBING6/27/2001 7/3/2001 PASS
Routing - PLANNING6/26/2001 6/27/2001  
Failed first Planning review. Submitted plans show 44 seats. Zoning Certificate (CZC01-00118) limits occupants to 32 seats.
Routing - PUBLIC WORKS6/21/2001 6/26/2001  
Failed per Karen Gallagher. Land divisions has not signed off.
Plans ACCEPTED BY PLAN TECH  6/19/2001 PASS
NOTE: These plans were not signed by Central District Health until after they were submitted to the PDS Department.
Routing Off Site - C.D.H6/19/2001 6/19/2001 PASS
First Notice6/15/20016/15/20016/15/2001 DONE
faxed russ cert for final cert. I think there is owner supplied equipment. lh
Application received  6/15/2001  
Recd Pcfee & Taken To Pln CK  6/15/2001