Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD01-01631
StatusFinaled
Name ST LUKES STL21506
Site Address 190 E BANNOCK ST
Project NameST LUKES-WEST WING
Customer Number21-506
ePlanReviewNo
Description
(ST LUKES-WEST WING)(THIRD FLOOR REMODEL-PHASE B) To remodel a 5,438 sq.ft. area on the south end of the floor for outpatient rooms and offices per approved plans on file. Interior demolition performed under BLD01-01682. Seismic structural upgrade reinforcement & shotcrete done under BLD00-02394. Work to include construction of interior non-bearing, non-combustible, fire-resistive walls to create exam rooms; testing rooms; work rooms and conference / break room for use as medical offices in conjunction with the main hospital. NOTE: This builidng is fully sprinklered. A "Letter of Completion / Compliance" is required for final approval of Phase "B". When Phase "A" & "B" are finished and L.C.'s issued, a Certificate of Occupancy for the tenant medical office use shall be issued (see comments section of permit for data). (P.C.#0498-01)/drs
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Aging Inspection10/25/200610/25/200610/26/2006 PASS
DetailsDave Hannah
BLD-Final5/11/20065/15/20065/15/2006APASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 5/11/2006 at 8:52:52 AM. Contact: ###-####. ok for perm occ
FIRE-Final Inspection5/9/20065/10/20065/10/2006APASS
DetailsForrest France
Project related FIR permits have been finaled, fire life safety walk through is acceptable for final.
BLD-Final5/3/20065/4/20065/5/2006AFAIL
DetailsDave Hannah
Scheduled by a contractor via Hello! on 5/3/2006 at 10:17:32 AM. Contact: ###-####. needs fire life safty final no inspection done
BLD-Final3/8/20063/9/20063/9/2006ANR
DetailsDave Hannah
Scheduled by a contractor via Hello! on 3/8/2006 at 10:39:48 AM. Contact: ###-####.
BLD-Wall cover2/22/20062/23/20062/23/2006APASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 2/22/2006 at 10:55:58 AM. Contact: ###-####. ceiling grid ok to cover
BLD-Aging Inspection1/9/20061/9/20061/12/2006 PASS
DetailsDave Hannah
BLD-Framing/Rough-in11/9/200511/9/200511/10/2005PPART
DetailsDave Hannah
dan; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles framing ok but need tth two shafts built
BLD-Framing/Rough-in9/26/20059/27/20059/27/2005APART
DetailsDave Hannah
dan ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie framing just starting questions on shafts


BLD-Aging Inspection9/26/20059/26/20059/26/2005 PASS
DetailsDave Hannah
BLD-Framing/Rough-in7/25/20057/25/20057/25/2005APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 7/25/2005 at 7:30:33 AM. Contact: ###-####. work to start soon
BLD-Framing/Rough-in7/20/20057/22/20057/22/2005ACANC
DetailsJim Storey
dan wilson; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
BLD-Aging Inspection5/30/20055/30/20055/31/2005 PASS
DetailsDave Hannah
BLD-Aging Inspection3/29/20053/29/20053/29/2005 PART
DetailsDave Hannah
wip 3/29/2005 1:17:30 PM
BLD-Aging Inspection11/2/200411/2/200411/2/2004 PASS
DetailsDave Hannah
wip 11/2/2004 10:35:16 AM
BLD-Aging Inspection8/31/20048/31/20048/31/2004 PASS
DetailsDave Hannah
wip 8/31/2004 8:51:14 AM
BLD-Aging Inspection6/29/20046/29/20046/29/2004 PASS
DetailsDave Hannah
wip 6/30/2004 1:50:55 PM
BLD-Aging Inspection4/28/20044/28/20044/28/2004 DONE
DetailsDave Hannah
Case Summary (BLD)  4/14/2004  
BLD-Aging Inspection9/30/20039/30/20039/30/2003 PASS
DetailsDave Hannah
BLD-Aging Inspection7/8/20037/8/20037/8/2003 PASS
DetailsCarl Dependahl
wp, at demo phasei 7/8/2003 8:12:03 AM
BLD-Conference5/8/20035/8/20035/8/2003APASS
DetailsCarl Dependahl
w/ Rick J re corridors 5/8/2003 9:18:43 AM
BLD-Aging Inspection4/30/20034/30/20034/30/2003 PASS
DetailsCarl Dependahl
rec'd eng's report re seismic upgrade of north portion,, ok 5/1/2003 11:41:57 AM
Case Summary (BLD)  2/7/2003  
BLD-Aging Inspection1/8/20021/8/20021/9/2002 NR
DetailsCarl Dependahl
st lukes west wing, 3rd fl south, work may be post poned? 1/9/2002 8:52:41 AM
Issue & PRINT to be Invoiced  10/9/2001 DONE
Print Occupancy Form  10/5/2001 DONE
Inspection Record Card- Bld  10/5/2001 DONE
Telephone call  10/5/2001 DONE
emailed Curtis at St. Luke's permit ready
PLANS/APPL TAKEN TO FRONT DESK  10/4/2001 PASS
Plans to permit desk to issue.
Routing - PLAN CHECK9/13/2001 10/4/2001 PASS
Inserted new plan sheets received 10/1/01 in response to 9/11/01 plan review. Approved as noted and plan review comments attached to and part of the approved plans.
Plan assigned to (DRS)6/21/2001 10/4/2001 PASS
DetailsDan Stuart
10/4/2001 08:45:21 DRS - activity updated through activity BLDA022 from case BLD01-01631.
Plan resubmittals received  10/2/2001 DONE
Received two copies of revised sheets A2.3B, M1.3B, E7.0, E7.1, and one copy of cover letter. Routed to Dan S. kmm
Routing - FIRE9/11/2001 9/13/2001 PASS
Plan Review Completed(1st rev)  9/13/2001 FAIL
Plan resubmittals requested  9/11/2001 FAIL
Faxed and mailed copy of corrections / clarifications and or details required as result of plan review for this project.
Routing - PLAN CHECK6/27/2001 9/11/2001 FAIL
Routing to fire code analyst for review.
Routing - PLUMBING6/22/2001 6/27/2001 PASS
floor drain in breakroom must not be inclosed in a cabinet
Routing - PUBLIC WORKS6/21/2001 6/22/2001 PASS
Plans ACCEPTED BY PLAN TECH  6/19/2001 PEND
6/20/01 Mech. and Plumb signed. Still requires updated application. No code data on cover sheet of plans. KMM
Requires. 1. Updated application
2. Mech. and Plumb. and last page of Elect. need to be signed
Faxed Gred Ostrow of these needs. KMM
Received Certificate of Value  6/18/2001 PEND
Requires updated application. KMM
Application received  6/18/2001  
Fee Review-notes6/18/20016/18/2001