Case Summary (BLD) | | | 12/22/2014 | | DONE |
|
|
|
|
Fee Review-notes | 7/8/2003 | 7/8/2003 | 7/8/2003 | | DONE |
|
|
|
|
Permanent Occupancy | | 12/14/2001 | 12/14/2001 | | DONE |
|
|
|
|
BLD-Final | 12/13/2001 | 12/14/2001 | 12/14/2001 | A | PASS |
Carl Dependahl
|
|
|
###-####; rec'd spec insp final report ok, hand rails installed, ok for c/o 12/14/2001 12:02:19 PM
|
Permanent occupancy | | | 12/14/2001 | | DONE |
|
|
|
Perm. Occ. Cert. #8958 issued 12-14-01 to Davies-Reid Tribal Arts.
|
BLD-Final | 12/13/2001 | 12/13/2001 | 12/13/2001 | P | NR |
Carl Dependahl
|
|
|
fn occ bill ###-#### ...rec'd letter from arch re deletion of one stairway from bsmt; ok as two exits remain. Need spec insp's report re seismic upgrade. keep c/n 12/13/2001 3:09:11 PM
|
BLD-Final | 12/5/2001 | 12/6/2001 | 12/6/2001 | P | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 12/05/2001 at 15:18:07. Contact: ###-####...keep c/n, (spec insp seismic ties, complete firestops or box out pvc at bsmt lid.) ok for t/o 12/6/2001 12:50:22 PM
|
Temporary occupancy | | | 12/6/2001 | | PART |
|
|
|
Temp. Occ. Cert. #4678 issued 12-6-01 to Davies-Reid Tribal Arts.
|
BLD-Final | 12/4/2001 | 12/5/2001 | 12/5/2001 | A | FAIL |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 12/04/2001 at 15:52:39. Contact: ###-####. east stair handrailling not compliant submital to tim hogland based on conversation with carl w. and the provitions in the ucbc./ need all handraills to extened and return/ need fire stopping listing for 3 " pipe penatration sw corner of basement. 12/5/2001 11:22:56 AM
|
FIRE-Final Inspection | 12/3/2001 | 12/4/2001 | 12/4/2001 | A | PASS |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 12/03/2001 at 13:55:09. Contact: ###-####. will remove deadbolt from rear exit door for structural inspector 12/4/2001 4:42:11 PM
|
BLD-Final | 12/3/2001 | 12/4/2001 | 12/4/2001 | P | NR |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 12/03/2001 at 13:55:54. Contact: ###-####.. needs zoning and fire prior to calling for final. 12/4/2001 4:01:57 PM
|
BLD-Framing/Rough-in | 10/30/2001 | 10/31/2001 | 10/31/2001 | A | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 10/30/2001 at 14:50:48. Contact: ###-####.. Ok to cover rest room walls. 10/31/2001 11:21:34 AM
|
BLD-Framing/Rough-in | 10/29/2001 | 10/30/2001 | 10/30/2001 | P | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 10/29/2001 at 13:32:21. Contact: ###-####. need ti fire block. 10/31/2001 9:13:56 AM
|
BLD-Conference | 10/26/2001 | 10/26/2001 | 10/26/2001 | P | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 10/26/2001 4:38:02 PM w/ supt re resubmittal...ok to realign elevator and hvac chases
|
Plan resubmittals received | | | 10/22/2001 | | DONE |
|
|
|
Received two copies of revised sheets A7.1, A2.5 and one cover letter. routed to Carl D. KMM
|
Plan resubmittals received | | | 10/11/2001 | | DONE |
|
|
|
Received two copies of revised sheets A2.5, A7.1 and A8.2 Routed to Carl D. kmm
|
BLD-Framing/Rough-in | 10/3/2001 | 10/3/2001 | 10/3/2001 | P | CANC |
Russ Owen
|
|
|
###-#### BOB. trans to 340. 10/4/2001 10:18:02 AM
|
BLD-Concrete | 10/3/2001 | 10/3/2001 | 10/3/2001 | P | PART |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 10/3/2001 3:06:51 PM col ftgs at rear of bldg ok
|
BLD-Framing/Rough-in | 10/3/2001 | 10/3/2001 | 10/3/2001 | P | PART |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 10/3/2001 5:46:12 PM seismic straps,blocks ok...bolts imbeds ok per mti
|
BLD-Footing | 9/12/2001 | 9/13/2001 | 9/13/2001 | P | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 09/12/2001 at 15:29:11. Contact: ###-####....c/n issued re spec insp agreement; shore dangerous outbuilding. 9/13/2001 4:43:17 PM
|
Issue PAID IN FULL permit | | | 8/15/2001 | | DONE |
|
|
|
|
Telephone call | | | 8/13/2001 | | DONE |
|
|
|
Per Scott Rudel, ACHD, they do not need to review this project.
|
Plan assigned to (CJW) | 6/22/2001 | | 8/9/2001 | | PASS |
Carl Westfall
|
|
|
8/9/01 14:30:20 CJW - activity updated through activity BLDA022 from case BLD01-01634.
|
Routing - PLAN CHECK | 7/24/2001 | | 8/9/2001 | | PASS |
|
|
|
(8-8-01) Worked on resubmittal. Wating for resolution of engineering concerns. (8-9-01) Drawings approved with conditions after response from engineer.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/9/2001 | | PASS |
|
|
|
|
Print Occupancy Form | | | 8/9/2001 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 8/9/2001 | | DONE |
|
|
|
|
Telephone call | | | 8/9/2001 | | DONE |
|
|
|
permit ready need ACHD
|
Telephone call | | | 8/8/2001 | | DONE |
|
|
|
Called Keith Jones with AHJ and ask for clarification on the knife plate support for glu-lam beams. Also ask that load transfer through the building be verified. Footing and columns may be undersized.
|
Plan resubmittals received | | | 8/7/2001 | | DONE |
|
|
|
Received two sets of plan resubmittals from Trout Architects, plus two sets of structural caculations, forwarded same to Carl Westfall. 8/7/01 DAR
|
Plan Review Completed(1st rev) | | | 7/24/2001 | | |
|
|
|
Failed first UBC review.
|
Routing - FIRE | 7/20/2001 | | 7/24/2001 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 6/27/2001 | | 7/20/2001 | | |
|
|
|
Failed first UBC review.
|
Plan Reviewer's activity | | | 7/17/2001 | | |
|
|
|
Failed first UBC review. UBC plan review started July 17, 2001 and finished July 20, 2001. A response from the architect and engineer was required. See the conditions list.
|
Routing - PUBLIC WORKS | 6/22/2001 | | 6/27/2001 | | PASS |
|
|
|
|
Routing - PLANNING | 6/27/2001 | | 6/27/2001 | | PASS |
|
|
|
Jeff Neberman.
|
Plans ACCEPTED BY PLAN TECH | | | 6/19/2001 | | DONE |
|
|
|
|
Waiting for Cert. of Value | | | 6/19/2001 | | DONE |
|
|
|
|
Application received | | | 6/18/2001 | | |
|
|
|
|