(RIVER WALK CENTER)(Suite #200) New 6,900 sq.ft. tenant on 2nd floor of existing building for office use per approved plans on file. Work to include demolishing almost all interior walls on second floor, new accessible elevator installation for upgrade work, building structural modifications for new elevator shaft, new interior walls, new interior doors and windows, interior finish, new suspended ceiling installation, mechanical work, plumbing work, and electrical work. This work is considered Phase I and is being done in conjunction with another permit of BLD01-02102. A CERTIFICATE OF OCCUPANCY IS TO BE ISSUED WHEN COMPLETED AND APPROVED. Interior demolition of the 2nd floor performed under BLD01-01710. NOTE: This building is NOT fire sprinklered. Exterior parking lot work approved under DRH01-00093. (P.C.#0508-01) JCB
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Fee Review-notes6/18/20016/18/20012/1/2002 DONE
Permanent occupancy  1/4/2002 DONE
Permanent occ #8980 issued 1-4-02 to Knipe Janoush Knipe on the 2nd floor.
Permanent Occupancy 12/18/200112/18/2001 DONE
Details
BLD-Final12/17/200112/18/200112/18/2001APASS
DetailsCarl Dependahl
###-####; ph 1 ok; stairs/rails to be done w/ ph.2 12/18/2001 10:59:08 AM
BLD-Final12/14/200112/17/200112/17/2001ANR
DetailsCarl Dependahl
###-####.nr, need final for elev by elec. 12/17/2001 10:30:17 AM
Temporary occupancy  11/30/2001 DONE
#4672 issued on 11/30/01 to River Walk Center - needs electrical and structural
FIRE-Final Inspection11/27/200111/28/200111/28/2001APASS
DetailsRick Jackson
Scheduled by a contractor via Hello! on 11/27/2001 at 14:51:52. Contact: ###-####.
BLD-Final11/27/200111/28/200111/28/2001AFAIL
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 11/27/2001 at 14:53:33. Contact: ###-####. c/n glazing signage, elev cert, ok for t/o. 11/28/2001 5:57:06 PM
BLD-Final11/26/200111/27/200111/27/2001PNR
DetailsCarl Dependahl
###-####
FIRE-Final Inspection11/26/200111/27/200111/27/2001PCANC
DetailsTroy Cobbley
To be rescheduled by contractor 11/27/2001 2:46:23 PM
BLD-Framing/Rough-in11/23/200111/26/200111/26/2001APART
DetailsCarl Dependahl
###-#### CEILING...add perim. wires at server room, seismic pod over west stair area; ok to continue, chk at final. 11/26/2001 10:32:23 AM
FIRE-Final Inspection11/26/200111/26/200111/26/2001PNR
DetailsRick Jackson
###-####
BLD-Framing/Rough-in11/13/200111/14/200111/14/2001PPART
DetailsCarl Dependahl
###-#### RICK clg ok pend elec. 11/14/2001 2:26:04 PM
BLD-Footing11/13/200111/14/200111/14/2001PPART
DetailsCarl Dependahl
Scheduled by Inspector: 340 On 11/13/2001 3:29:13 PM ext ftg ok 11/14/2001 3:47:01 PM
FIRE-Conference11/9/200111/13/200111/13/2001APART
DetailsRick Jackson
###-#### RICK exit sign coverage; alarm submittals required for elevator recall 11/13/2001 11:32:26 AM
BLD-Conference11/13/200111/13/200111/13/2001APASS
DetailsCarl Dependahl
Added by Inspector: 340 On 11/13/2001 9:16:37 AM w/ supt. re ceiling req's.
BLD-Foundation11/13/200111/13/200111/13/2001PNR
DetailsCarl Dependahl
###-#### rick
BLD-Conference11/13/200111/13/200111/13/2001PPASS
DetailsCarl Dependahl
Added by Inspector: 340 On 11/13/2001 12:23:43 PM w/ framer & bldr re exit signs & clg reqs
BLD-Foundation11/8/200111/8/200111/8/2001PPART
DetailsCarl Dependahl
###-#### RICK west side ext footing/frost wall 11/8/2001 2:42:43 PM
BLD-Foundation11/5/200111/6/200111/6/2001APART
DetailsCarl Dependahl
rick ###-#### ; isolated ext ftgs ok. 11/6/2001 11:47:08 AM
BLD-Framing/Rough-in11/6/200111/6/200111/6/2001PPART
DetailsCarl Dependahl
Added by Inspector: 340 On 11/6/2001 3:59:16 PM grid...add spacer bars, perimeter wires, & seismic pods at areas >144s.f. also met w/ arch onsite, will provide resubmittal for Dr. Hollingsworth space at 1st fl.
BLD-Framing/Rough-in10/30/200110/31/200110/31/2001APART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 10/30/2001 at 13:45:49. Contact: ###-####. Elevator shaft and 2 footings at entry.(columns). 10/31/2001 4:29:18 PM
BLD-Framing/Rough-in10/18/200110/19/200110/19/2001ANR
DetailsCarl Dependahl
###-####...east stair "enclosure" ok to cover. 10/19/2001 11:27:06 AM
BLD-Framing/Rough-in10/17/200110/18/200110/18/2001APART
DetailsCarl Dependahl
###-#### RICK 2nd fl r. rm. entry walls ok 10/18/2001 11:40:50 AM
BLD-Conference10/15/200110/15/200110/15/2001PPASS
DetailsCarl Dependahl
###-#### re 2nd fl rest rms & floor joist mod, ok per spec/plans 10/15/2001 6:00:46 PM
BLD-Foundation10/5/200110/8/200110/8/2001PPART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 10/05/2001 at 09:19:30. Contact: ###-####. elev pit walls and adjacent 10/8/2001 4:31:56 PM
BLD-Framing/Rough-in10/5/200110/8/200110/8/2001PPART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 10/05/2001 at 09:20:15. Contact: ###-####. hvac chases; seal draft stops thru-out 10/8/2001 4:33:18 PM
BLD-Footing10/2/200110/3/200110/3/2001PPART
DetailsCarl Dependahl
###-####, elev pit base & walls 10/3/2001 3:07:30 PM
BLD-Framing/Rough-in10/2/200110/3/200110/3/2001PPART
DetailsCarl Dependahl
2nd fl. int partitions except chases ok 10/3/2001 3:08:26 PM
Issue PAID IN FULL permit  9/6/2001 DONE
Inspection Record Card- Bld  8/16/2001 DONE
Print Occupancy Form  8/16/2001 DONE
Telephone call  8/16/2001 DONE
left mess that permit is ready
Routing - FIRE8/13/20018/15/20018/15/2001 PASS
DetailsBill Alexander
Review notes attached.
Routing - PLAN CHECK8/15/2001 8/15/2001 PASS
Permit and plans approved and taken to front desk.
PLANS/APPL TAKEN TO FRONT DESK  8/15/2001 PASS
Plan assigned to (JCB)6/25/2001 8/15/2001 PASS
DetailsJason Blais
8/15/2001 16:18:22 JCB - activity updated through activity BLDA022 from case BLD01-01643.
Routing - PUBLIC WORKS8/10/2001 8/13/2001 DONE
Routing - PLAN CHECK7/24/2001 8/9/2001 PEND
When approved by Fire Dept. permit can be issued.
Routing - FIRE7/24/20017/24/20017/27/2001 FAIL
DetailsBill Alexander
Lack exiting issues of conformance and detail
Plan resubmittals requested  7/24/2001  
Plan resubmittals and response required for further review.
Routing - PLAN CHECK6/27/2001 7/24/2001 FAIL
Plan review report sent and faxed to architect. Plan resubmittals and response required for further review. Plans routed to Fire Dept. for review.
Routing - PUBLIC WORKS6/25/2001 6/27/2001 PASS
Plans ACCEPTED BY PLAN TECH  6/19/2001 DONE
Application received  6/18/2001  
Routing - PLANNING6/27/2001 6/27/2000 PASS
Paul Krommenhoek approved per DRH01-00093