Information based on query as of Sunday, August 18, 2024.
Permit Information
Permit NumberBLD01-01647
StatusFinaled
Name TAMURA & ASSOCIATES
Site Address 575 E PARKCENTER BLVD
Project NameZIEGLER TAMURA BLDG
Customer Number 
ePlanReviewNo
Description
ZIEGLER TAMURA OFFICE BUILDING (SHELL) - TO CONSTRUCT A NEW 16,000 SQ. FT., ONE STORY, WOOD FRAMED OFFICE SHELL BUILDING AND RELATED SITE IMPROVEMENTS. THIS IS A SHELL PERMIT ONLY. NO OCCUPANCY IS ALLOWED UNDER THIS PERMIT. SEPARATE TENANT IMPROVEMENT PERMITS ARE REQUIRED TO FINISH THIS BUILDING FOR OCCUPANCY. ALL CONSTRUCTION PER THE APPROVED PLANS AND ATTACHED COMMENT LIST. NOTE: THIS BUILDING IS LOCATED IN A FLOOD PLAIN AREA. A FLOOD PLAIN CERTIFICATE, SHOWING COMPLIANCE, IS REQUIRED TO BE SUBMITTED TO THE BUILDING DEPARTMENT AS SOON AS POSSIBLE AFTER CONSTRUCTION OF THE FOUNDATION AND PLACEMENT OF THE SLAB FLOOR. JCM/DRH00-00153/PC#506-01 GRADING UNDER PERMIT BLD01-00865.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Code Occupancy Approval  1/9/2004 DONE
Fee Review-notes6/19/20016/19/20016/28/2002 DONE
Code Occupancy Approval5/8/20025/8/20025/8/2002PPASS
DetailsWm. Michael Meloy
Scheduled by Inspector: WMM On 5/8/2002 12:37:40 PM Inspection noted landscaping as per plans. 5/8/2002 12:43:41 PM
DOC - L/C Approved  4/16/2002 DONE
Cert of Compliance #22333 issued 4/16/02 aml
BLD-Final4/15/20024/15/20024/15/2002PPASS
DetailsJim Storey
fn occ ###-####- mike final ok pending others. 4/15/2002 2:01:43 PM
FIRE-Final Inspection4/11/20024/11/20024/11/2002PPASS
DetailsRick Jackson
Added by Inspector: 409 On 4/11/2002 3:17:13 PM
FIRE-Final Inspection4/9/20024/10/20024/10/2002PFAIL
DetailsTroy Cobbley
duct detectors still not wired correctly, structural inspector to verify door hardware, address numbers are temporary as the permanant are on order, fire extinguisher has been mounted 4/10/2002 3:45:27 PM
BLD-Framing/Rough-in4/5/20024/8/20024/8/2002ANR
DetailsJim Storey
###-#### MIKE (SHELL)
FIRE-Final Inspection4/8/20024/8/20024/8/2002PFAIL
DetailsTroy Cobbley
duct detectors are not wired and could not be tested 4/9/2002 9:56:23 AM
BLD-Framing/Rough-in4/3/20024/4/20024/4/2002AFAIL
DetailsJim Storey
###-#### tape draftstop joints 4/4/2002 11:58:46 AM
BLD-Framing/Rough-in1/2/20021/2/20021/2/2002PPASS
DetailsJim Storey
NAIL MIKE ###-#### exterior ok to cover. 1/2/2002 2:25:32 PM
BLD-Framing/Rough-in12/28/200112/28/200112/28/2001PPART
DetailsJim Storey
###-#### only north and east walls ok for cover. 12/28/2001 2:32:05 PM
BLD-Framing/Rough-in12/26/200112/27/200112/27/2001AFAIL
DetailsJim Storey
###-#### sheer nailing received engineering/archived/ need more naills and rfi for pipes through sheer pannels. c/n on site. 12/27/2001 2:31:45 PM
BLD-Framing/Rough-in12/3/200112/4/200112/4/2001AFAIL
DetailsRuss Owen
for nailing insp-- mike- ###-#### . need engineer to clairify hold-down attachement to studs and nailing c/n given to framer on site. 12/4/2001 2:05:17 PM
BLD-Foundation10/4/200110/4/200110/4/2001PPASS
DetailsDave Hannah
Added by Inspector: 425 On 10/4/2001 1:19:50 PM
BLD-Footing10/1/200110/1/200110/1/2001PPASS
DetailsSteven Webb
###-#### mike
(F) Reprint permit  9/27/2001 DONE
Issue PAID IN FULL permit  9/26/2001 DONE
Inspection Record Card- Bld  9/18/2001 DONE
Print Occupancy Form  9/18/2001 DONE
Telephone call  9/18/2001 DONE
Routing - FIRE9/17/2001 9/17/2001 PASS
Routing - PLAN CHECK9/17/2001 9/17/2001 PASS
PLANS/APPL TAKEN TO FRONT DESK  9/17/2001 PASS
Routing - PLAN CHECK9/12/2001 9/17/2001  
Plan assigned to (JCM)6/29/2001 9/17/2001 PASS
DetailsJohn Menard
9/17/01 15:15:51 JCM - activity updated through activity BLDA022 from case BLD01-01647.
Plan Reviewer's activity  9/13/2001 PASS
Reviewed and approved resubmiitals as drawn. JCM
Routing - PLANNING9/10/2001 9/12/2001 PASS
Approved per DRH00-153.
Routing - FIRE9/4/20019/7/20019/10/2001 FAIL
DetailsBill Alexander
lack correct water supply (hydrant) information/verification.
Routing - PLAN CHECK9/10/2001 9/10/2001  
Routing Off Site - STRUCTURAL8/30/2001 9/7/2001 PASS
Contacted PDQ to take resubmitted plans sheetsA2.0, A2.2, A2.4, A4.0, A4.1, one copy of struct. calcs. and response to struct. plans check review. KMM Received a fax from the consulting engineer indicating that all concerns had been adequately addressed. JCM
Plan resubmittals received  9/5/2001 DONE
Received two copies of landscape plan. Routed to John M. KMM
Plan resubmittals received  9/4/2001 DONE
Received one copy of legal description, one copy of cover letter and two copies of revised sheetsA1.0, A1.2, A4.1. Routed to John M. KMM
Routing - PLAN CHECK8/6/2001 9/4/2001  
Plan resubmittals requested  8/30/2001  
Faxed the architect of record a request for additional revisions. JCM
Plan resubmittals received  8/29/2001 DONE
Received three copies of revised sheets A2.0, A2.2, A2.4, A4.0, A4.1. Two copies of struct. calcs. and one copy of response letter. Routed to John M. KMM
Plan resubmittals received  8/29/2001 DONE
Received two copies of revised sheets A1.2, A2.1, A2.4, A4.1, and one copy of response letter. Routed to John M. KMM
Routing - PLAN CHECK8/3/2001 8/6/2001 PEND
Routing - PUBLIC WORKS8/6/2001 8/6/2001 PASS
Routing - PUBLIC WORKS8/3/2001 8/3/2001 FAIL
To April Miller
Plan Review Completed(1st rev)  8/3/2001 FAIL
Routing - FIRE7/31/2001 8/3/2001 FAIL
FIRE FLOW INADEQUATE
Routing - PLAN CHECK7/11/2001 7/31/2001 FAIL
Plan resubmittals requested  7/31/2001  
Mailed the architect of record a copy of the plan review comment list requesting revisions. JCM
Routing - PLANNING7/3/2001 7/11/2001 FAIL
Plans do not comply with Design Review conditons of approval. Staff will inform applicant via letter that a modification application must be approved for the roof line/building mass changes to the south elevation (facing Logger's Creek).
Plan resubmittals requested  7/11/2001  
Faxed the architect of record a copy of the comment list from the consulting engineer requesting revisions to the structural plans and calculations. JCM
Routing Off Site - STRUCTURAL7/5/2001 7/10/2001 FAIL
pending Johns say so. KMM Received a comment list from the consulting structural engineer requesting revisions. JCM
Routing - PUBLIC WORKS7/2/2001 7/3/2001 FAIL
brian m failed reequires drainage plan revision/pe
Plans ACCEPTED BY PLAN TECH  6/29/2001 PEND
Acceptance per John M. John I still have three separate parcel numbers for this address. DRH00-00153 lists R5935010075, on application R5935010980, in computer under Bld01-01657 R593510044. KMM
CHANGE STATUS TO (PND)  6/28/2001 DONE
Plans ACCEPTED BY PLAN TECH  6/19/2001 FAIL
Plans given back to Mark Sanders per John M. Requires 1.Correct Parcel #
2. Complet legal description, verifying legal building lot
3. Revised Civil plan
4. Property lines with dimensions
5. Show surrounding areas including public way locations & access
6. Take off - for information only notes, prelim. not for constr. etc.
7. Stamped and signed calcs. KMM
Received Certificate of Value  6/19/2001 DONE
Application received  6/19/2001  
Plan routing begun/NEW & ADDTN