*CO-LOCATE EQUIPMENT SHELTER FOUNDATION & ELECTRICAL HOOK-UP* *ID-013P-Z USTICK/5MILE* ** THIS PERMIT IS FOR FOUNDATION & CONNECTION TO PREMANUFACTURED BUILDING ONLY** Nextel Partners Inc. to prepare site, excavate, form, place steel reinforcement, pour and finish concrete monolithic slab/foundation for support of pre-manufactured, State of Idaho approved, 10' x 20' building for use as equipment shelter. Placement and construction of foundation to be per detail 5/A4 with connection of building to foundation per State approved plans, Sheet 7. Separate electrical permit also required. To maintain 10 feet or more to all property lines to avoid requirements for protected openings per Table 5-A, UBC. Final inspection and approval required by Planning, Electrical & Structural Inspection Divisions & Office Staff. A "Letter of Completion / Compliance is required for this project. drs
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Fee Review-notes6/19/20016/19/20014/17/2002 DONE
Letter of compliance  7/6/2001 DONE
Letter of Compliance #21557 issued 7-6-01.
BLD-Final7/5/20017/5/20017/5/2001PPASS
DetailsDave Hannah
###-####
BLD-Footing6/25/20016/26/20016/26/2001PCANC
DetailsRick Jackson
Bill ###-#### or Curtis ###-#### not for fire inspection 6/27/2001 7:39:15 AM
Inspection Record Card- Bld  6/22/2001 DONE
Print Occupancy Form  6/22/2001 DONE
Issue PAID IN FULL permit  6/22/2001 DONE
Plan assigned to (MYS)6/19/20016/19/20016/21/2001 PASS
DetailsMarlene Southard
6/21/2001 16:23:52 DRS - activity updated through activity BLDA022 from case BLD01-01653.
Plan assigned to (DRS)6/19/20016/19/20016/21/2001 PASS
DetailsDan Stuart
6/21/2001 16:23:53 DRS - activity updated through activity BLDA022 from case BLD01-01653.
Print Pending Permit.LaserJet4  6/21/2001  
Case Summary (BLD)  6/21/2001  
Meeting  6/21/2001  
Met with Marsha Smylie to review situation for this plan. The permit cannot be issued until the last thing on friday to comply with CAA01-00145 condition for appeal period which ends at 5pm on June 22, 2001, Friday. I ask that she prepare the permit but note that it is not to be issued until 4:55 p.m. I told Curtis Prater of Nextell Partners that this would be the soonest time they could pick the permit up. Marsha said to put a note on the plan and give to her as she will be here tommorrow and will take care of it.
PLANS/APPL TAKEN TO FRONT DESK  6/21/2001 PASS
Took plan to permit desk based on discussion with Marsha Smylie so the permit can be prepared but not issued until 4:55 pm on Friday. The applicant will bring in a check at that time
Application received  6/19/2001  
Recd Pcfee & Taken To Pln CK  6/19/2001 DONE
Meeting  6/18/2001  
Met with Jerry Davis & Curtis Prater to again review what was needed in the way of submittals. Have received the plan approval & insignia numbers from the state of Idaho for the building review as pre-manufactured unit. Mr. Prater said he would submit plans on the 19th.
Plan Reviewer's activity  6/15/2001  
Met with Jerry Davis to review plans necessary for issuance of a permit for the foundation. Need two copies of plans with architects stamp and evidence that the State of Idaho has reviewed and approved the plans for the structure as a pre-manufactured building. An application and certificate of value is needed to cover the costs of the monolithic foundation and the electrical that connects to the self contained unit. Jerry said he would bring in Monday the 18th.
Routing - PLAN CHECK6/21/20016/21/2001  PEND
Approved as noted in permit. Per planning conditions, cannot issued until last thing on Friday afternoon to meet conditions of appeal period.