BLD-Conference | 10/8/2001 | 10/8/2001 | 10/8/2001 | A | PART |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 10/8/2001 10:42:37 AM w/ Pete re final req's
|
Letter of compliance | | | 8/1/2001 | | DONE |
|
|
|
Letter of Compliance #21617 issued 8-1-01.
|
FIRE-Final Inspection | 7/24/2001 | 7/25/2001 | 7/25/2001 | A | PASS |
Rick Jackson
|
|
|
###-#### fire sprinkler or fire alarm work not required nor needed. 7/25/2001 9:17:45 AM
|
BLD-Final | 7/24/2001 | 7/25/2001 | 7/25/2001 | P | PASS |
Russ Owen
|
|
|
###-#### this portion of work is ok, but a stop work has been posted for adnl work of door way cut into concrete wall. 7/25/2001 1:47:49 PM
|
BLD-Final | 7/24/2001 | 7/24/2001 | 7/24/2001 | P | FAIL |
Russ Owen
|
|
|
###-####c/n posted needs fire/life safety inspection and permit for addnl work, consisting of new opening into concrete wall for new door located bettween the 2 rooms under this permit. 7/24/2001 2:34:41 PM
|
BLD-Framing/Rough-in | 6/29/2001 | 7/2/2001 | 7/2/2001 | A | PART |
Carl Dependahl
|
|
|
Pete ###-#### need verify other insps as needed, c/n re plans. 7/2/2001 11:37:27 AM
|
BLD-Conference | 7/2/2001 | 7/2/2001 | 7/2/2001 | A | CANC |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 7/2/2001 11:43:42 AM ok to complete cover; verify penetrations at final
|
Issue PAID IN FULL permit | | | 6/21/2001 | | DONE |
|
|
|
|
Plan assigned to (DRS) | 6/20/2001 | 6/20/2001 | 6/20/2001 | | PASS |
Dan Stuart
|
|
|
6/20/2001 11:03:00 DRS - activity updated through activity BLDA022 from case BLD01-01654.
|
Routing - PLAN CHECK | 6/20/2001 | 6/20/2001 | 6/20/2001 | | PASS |
|
|
|
Approved as noted and attached plan review conditions.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/20/2001 | | PASS |
|
|
|
To permit desk.
|
Inspection Record Card- Bld | | | 6/20/2001 | | DONE |
|
|
|
|
Print Occupancy Form | | | 6/20/2001 | | DONE |
|
|
|
|
Telephone call | | | 6/20/2001 | | DONE |
|
|
|
|
Plan Reviewer's activity | | | 6/20/2001 | | |
|
|
|
Researched history of facility for the use change to include Anser Charter School. This was done in June, 1999 W/ C.O. #8154 issued 3/7/00 under BLD99-01697. The occupancy use Groups became A-3 / E-1; Construction Type was Changed from III-N to II-N on School side & V-N on other side with 2-hour area seaparation wall between the two construction types.
|
Application received | | | 6/20/2001 | | |
|
|
|
|
Meeting | | | 6/19/2001 | | |
|
|
|
Met with Earl Gafford, Gafford Construction to review the scope of work proposed. Work involves enclosing openings within existing walls at the upper level between the running track and the rooms 111 & 112 to be used as principle's office & computer / library room. Will issue as quick permit using previously approved plans from records vault with red-line notation as to location & scope of work. Reviewed scope of work with Sam Rogers, fire code analyst. Scope of work should not require any changes to the sprinkler or alarm system and this can be verified in the filed and corrections made if needed.
|