Fee Review-notes | 6/21/2001 | 6/21/2001 | 2/21/2003 | | DONE |
|
|
|
|
Letter of compliance | | | 1/24/2003 | | DONE |
|
|
|
Letter of Compliance #22819 issued 1-24-03.
|
BLD-Aging Inspection | 1/23/2003 | 1/23/2003 | 1/23/2003 | | PASS |
Tom Arcoraci
|
|
|
|
BLD-Final | 2/5/2002 | 2/5/2002 | 2/5/2002 | P | PASS |
Russ Owen
|
|
|
22-9098 Ok for permanent oc. 2/5/2002 4:19:43 PM
|
FIRE-Final Inspection | 1/17/2002 | 1/17/2002 | 1/17/2002 | P | PASS |
Troy Cobbley
|
|
|
Fire life/safety finaled. I didn't require sticker at exit due to people not being able to be locked in 1/17/2002 1:40:53 PM
|
FIRE-Final Inspection | 1/10/2002 | 1/10/2002 | 1/10/2002 | P | FAIL |
Troy Cobbley
|
|
|
provide "door to remain unlocked" sticker on main exit 1/10/2002 2:57:56 PM
|
BLD-Final | 12/3/2001 | 12/4/2001 | 12/4/2001 | P | FAIL |
Jim Storey
|
|
|
###-#### call kerry first a-3 panic hardware required/ need fire insp. 12/4/2001 4:16:13 PM
|
BLD-Aging Inspection | 11/28/2001 | 11/28/2001 | 11/28/2001 | | PART |
Tom Arcoraci
|
|
|
|
BLD-Framing/Rough-in | 9/26/2001 | 9/27/2001 | 9/27/2001 | A | PASS |
Dave Hannah
|
|
|
kerry ###-#### call 1st before insp fr c/n items complete ook to cover 9/27/2001 8:45:34 AM
|
BLD-Framing/Rough-in | 9/24/2001 | 9/24/2001 | 9/24/2001 | P | FAIL |
Tom Arcoraci
|
|
|
###-#### ok to cover all but hd area need fix from eng 9/24/2001 1:56:49 PM
|
BLD-Framing/Rough-in | 9/20/2001 | 9/21/2001 | 9/21/2001 | A | NR |
Tom Arcoraci
|
|
|
###-#### KERRY PLEASE CALL BEFORE GOING OUT ###-#### no plans 9/21/2001 2:29:53 PM
|
BLD-Foundation | 8/24/2001 | 8/24/2001 | 8/24/2001 | P | PASS |
Tom Arcoraci
|
|
|
found corwin- ###-####
|
BLD-Footing | 8/20/2001 | 8/21/2001 | 8/21/2001 | A | CANC |
Tom Arcoraci
|
|
|
###-#### corwin
|
BLD-Footing | 8/21/2001 | 8/21/2001 | 8/21/2001 | P | PASS |
Tom Arcoraci
|
|
|
###-#### corwin
|
Issue PAID IN FULL permit | | | 8/14/2001 | | DONE |
|
|
|
|
Plan assigned to (R_H) | 6/28/2001 | | 8/6/2001 | | PASS |
|
|
|
8/6/2001 10:13:52 RMH - activity updated through activity BLDA022 from case BLD01-01684.
|
Plan Review Report | | | 8/6/2001 | | DONE |
|
|
|
|
Plan Review Report | | | 8/6/2001 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 8/6/2001 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/6/2001 | | PASS |
Ron Hill
|
|
|
|
Print Occupancy Form | | | 8/6/2001 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 8/6/2001 | | DONE |
|
|
|
|
Telephone call | | | 8/6/2001 | | DONE |
|
|
|
permit ready
|
Routing - PLAN CHECK | 7/2/2001 | | 8/6/2001 | | PASS |
Ron Hill
|
|
|
|
Plan resubmittals received | | | 8/3/2001 | | DONE |
|
|
|
Received two sets of plan resubmittals from LKV Architects plus structural caculations, forwarded same to Ron Hill. 8/3/01 DAR
|
Plan Reviewer's activity | | | 7/23/2001 | | FAIL |
Ron Hill
|
|
|
Plans failed in building plan check.
|
Case Summary (BLD) | | | 7/23/2001 | | DONE |
|
|
|
|
Plan Review Report | | | 7/23/2001 | | DONE |
|
|
|
|
Routing - PLANNING | 6/28/2001 | | 7/2/2001 | | PASS |
|
|
|
Dave Abo.
|
Plans ACCEPTED BY PLAN TECH | | | 6/22/2001 | | PASS |
|
|
|
requires arch/eng. record form signed by owner. Faxed back to Amber Van Ocker. KMM 6/25/01 received arch/eng. record form. put with plans and file. kmm
|
Received Certificate of Value | | | 6/22/2001 | | DONE |
|
|
|
|
Application received | | | 6/21/2001 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 6/21/2001 | | DONE |
|
|
|
|