BLD-Final | 11/6/2001 | 11/7/2001 | 11/7/2001 | A | PASS |
Dave Hannah
|
|
|
###-#### MATT c.c # 22029 issued 11/7/2001 10:47:31 AM
|
DOC - Permit Finaled | 11/7/2001 | 11/7/2001 | 11/7/2001 | A | PASS |
Dave Hannah
|
|
|
Finaled by inspector at 11/7/2001 10:47:35 AM
|
BLD-Final | 11/6/2001 | 11/6/2001 | 11/6/2001 | P | FAIL |
Steven Webb
|
|
|
###-#### c/n issued 11/6/2001 2:11:38 PM
|
BLD-Energy code compliance | 9/21/2001 | 9/21/2001 | 9/21/2001 | P | PASS |
Steven Webb
|
|
|
###-#### ok to cover 9/21/2001 1:20:28 PM
|
BLD-Energy code compliance | 9/19/2001 | 9/20/2001 | 9/20/2001 | A | PART |
Dave Hannah
|
|
|
###-#### ok to cover every thing but garage and bouns room over garage 9/20/2001 9:36:53 AM
|
BLD-Energy code compliance | 9/20/2001 | 9/20/2001 | 9/20/2001 | P | NR |
Steven Webb
|
|
|
insulation matt- ###-####
|
BLD-Energy code compliance | 9/19/2001 | 9/19/2001 | 9/19/2001 | P | FAIL |
Steven Webb
|
|
|
matt ###-#### insulation--c/n issued--no energy report, insulation not completed and no vapor barrier at time of inspection--. 9/19/2001 1:58:18 PM
|
BLD-Framing/Rough-in | 9/18/2001 | 9/18/2001 | 9/18/2001 | P | PASS |
Dave Hannah
|
|
|
###-#### matt crew finished allc/n item before leaving ok to insulate no c/n items 9/18/2001 1:49:57 PM
|
BLD-Framing/Rough-in | 9/17/2001 | 9/17/2001 | 9/17/2001 | P | NR |
Russ Owen
|
|
|
fr matt ###-####
|
BLD-Framing/Rough-in | 9/10/2001 | 9/10/2001 | 9/10/2001 | P | PASS |
Steven Webb
|
|
|
###-#### SHEAR--OK 9/10/2001 2:10:59 PM
|
BLD-Framing/Rough-in | 9/7/2001 | 9/7/2001 | 9/7/2001 | P | PART |
Steven Webb
|
|
|
SHEER WALL ###-#### MATT ok to side except garage--need to verify garage shear blocks are installed and nailed. 9/7/2001 2:38:09 PM
|
BLD-Footing | 8/3/2001 | 8/3/2001 | 8/3/2001 | P | PART |
Steven Webb
|
|
|
todd ###-#### ft insp wip 8/3/2001 2:12:25 PM
|
Plan assigned to (SAM) | 8/1/2001 | | 8/2/2001 | | PASS |
Steve Munroe
|
|
|
8/2/2001 09:19:18 SAM - activity updated through activity BLDA022 from case BLD01-01708.
|
Plan Reviewer's activity | | | 8/2/2001 | | PEND |
|
|
|
8/2/01 8:15 Called and left a message for Tim Johnson, the engineer, to talk to him about wall lines "F", "2" and "6". At 8:50 I called the builder to ask about roof framing over stairs.
|
Print Pending Permit.LaserJet4 | | | 8/2/2001 | | |
|
|
|
|
Plan Review Report | | | 8/2/2001 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/2/2001 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 8/2/2001 | | DONE |
|
|
|
|
Telephone call | | | 8/2/2001 | | DONE |
|
|
|
left mess that permit is ready
|
Issue PAID IN FULL permit | | | 8/2/2001 | | DONE |
|
|
|
|
CHANGE ISSUED DATE | | | 8/2/2001 | | DONE |
|
|
|
|
Pending Assignment by DJO | 6/25/2001 | | 8/1/2001 | | DONE |
Dan Overy
|
|
|
8/1/2001 09:37:51 SAM - activity updated through activity BLDA183 from case BLD01-01708.
|
Routing - PUBLIC WORKS | 6/25/2001 | 6/25/2001 | 7/26/2001 | | DONE |
|
|
|
|
Routing - PLANNING | 6/25/2001 | 6/25/2001 | 6/25/2001 | | PASS |
|
|
|
|
Application received | | | 6/25/2001 | | |
|
|
|
|
Routing - PLAN CHECK | 7/26/2001 | 7/26/2001 | | | PEND |
|
|
|
|