(F) Reprint permit | | | 10/16/2001 | | DONE |
|
|
|
|
BLD-Final | 9/27/2001 | 9/28/2001 | 9/28/2001 | P | PASS |
Jim Storey
|
|
|
###-#### final ok 9/28/2001 2:12:45 PM
|
DOC - Permit Finaled | 9/28/2001 | 9/28/2001 | 9/28/2001 | P | PASS |
Jim Storey
|
|
|
Finaled by inspector at 9/28/2001 2:12:46 PM
|
BLD-Energy code compliance | 8/24/2001 | 8/24/2001 | 8/24/2001 | P | PASS |
Jim Storey
|
|
|
justin ###-#### energy code garage must be insulated walls ansd ceilling and condition garage space. to verify on final. 8/24/2001 5:09:15 PM
|
BLD-Energy code compliance | 8/22/2001 | 8/23/2001 | 8/23/2001 | A | FAIL |
Russ Owen
|
|
|
###-#### justin. left c/n slab perimeter insulation ,garage sla 8/23/2001 11:12:56 AM thermal break. 8/23/2001 11:13:07 AM
|
BLD-Framing/Rough-in | 8/15/2001 | 8/15/2001 | 8/15/2001 | P | PART |
Jim Storey
|
|
|
###-#### no thermal break in garage slab.ok to insulate. 8/15/2001 4:53:33 PM
|
BLD-Framing/Rough-in | 8/13/2001 | 8/14/2001 | 8/14/2001 | P | FAIL |
Dave Hannah
|
|
|
FR INSP -JUSTIN ###-#### c/n on site 8/14/2001 3:21:07 PM
|
BLD-Framing/Rough-in | 7/31/2001 | 8/1/2001 | 8/1/2001 | A | PART |
Jim Storey
|
|
|
###-#### brace panel nailling ok for cover. 8/1/2001 8:35:54 AM
|
BLD-Foundation | 7/11/2001 | 7/11/2001 | 7/11/2001 | P | PASS |
Jim Storey
|
|
|
###-####
|
BLD-Foundation | 7/11/2001 | 7/11/2001 | 7/11/2001 | P | PASS |
Jim Storey
|
|
|
###-####
|
BLD-Footing | 7/10/2001 | 7/10/2001 | 7/10/2001 | P | PART |
Steven Webb
|
|
|
late pm \\###-#### wip 7/10/2001 2:19:14 PM
|
Issue PAID IN FULL permit | | | 7/9/2001 | | DONE |
|
|
|
|
Plan assigned to (DJO) | 6/28/2001 | 6/28/2001 | 6/28/2001 | | PASS |
Dan Overy
|
|
|
6/28/2001 08:06:28 DJO - activity updated through activity BLDA022 from case BLD01-01723.
|
Plan Reviewer's activity | | | 6/28/2001 | | DONE |
|
|
|
have red-lined plans for truax. future submittals will not be accepted unless plans are in compliance with city requirements. garage changes, to meet zonings 20 ft inside dimension, will be modified by designer to reflect exactly what is being constructed.
|
Print Pending Permit.LaserJet4 | | | 6/28/2001 | | DONE |
|
|
|
|
Plan Review Report | | | 6/28/2001 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/28/2001 | | DONE |
|
|
|
|
Telephone call | | | 6/28/2001 | | DONE |
|
|
|
called Truax permit ready for pickup
|
Inspection Record Card- Bld | | | 6/28/2001 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN CHECK | | | 6/28/2001 | | |
|
|
|
|
Routing - PLANNING | 6/26/2001 | 6/26/2001 | 6/27/2001 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 6/26/2001 | 6/26/2001 | 6/27/2001 | | DONE |
|
|
|
assessment paid on 6/14/2001 credit given for house that was demolished. lw
|
Application received | | | 6/26/2001 | | |
|
|
|
|
Routing - PLAN CHECK | 6/27/2001 | 6/27/2001 | | | PEND |
|
|
|
|
Pending Assignment by DJO | 6/26/2001 | | | | PEND |
Dan Overy
|
|
|
|