BLD - Request for Extension | 8/18/2003 | 8/19/2003 | 8/19/2003 | A | DONE |
Steven Webb
|
|
|
|
BLD-Final | 8/18/2003 | 8/19/2003 | 8/19/2003 | A | NR |
Steven Webb
|
|
|
###-#### david Need all trades prior to final--called contact number, no room in mail box message. Secure trades and call for inspection. 8/19/2003 11:29:36 AM
|
PostCard Mailed | | | 7/13/2002 | | SENT |
|
|
|
PostCard has been mailed requesting inspection.
|
Code Occupancy Approval | | | 7/12/2002 | | PASS |
|
|
|
|
BLD-Wall cover | 12/19/2001 | 12/20/2001 | 12/20/2001 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 12/19/2001 at 14:23:23. Contact: .
|
BLD-Energy code compliance | 12/19/2001 | 12/20/2001 | 12/20/2001 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 12/19/2001 at 14:25:39. Contact: .
|
BLD-Framing/Rough-in | 12/14/2001 | 12/17/2001 | 12/17/2001 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 12/14/2001 at 13:17:39. Contact: .
|
BLD-Framing/Rough-in | 12/13/2001 | 12/14/2001 | 12/14/2001 | A | FAIL |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 12/13/2001 at 12:30:54. Contact: . no site approved plans for this address or truss engineering on site 42 $ reinspection posted 12/14/2001 9:55:58 AM
|
BLD-Framing/Rough-in | 12/10/2001 | 12/11/2001 | 12/11/2001 | A | FAIL |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 12/10/2001 at 12:22:29. Contact: . c/n no approved plans on site 12/11/2001 11:12:51 AM
|
BLD-Framing/Rough-in | 10/31/2001 | 10/31/2001 | 10/31/2001 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 10/31/2001 at 00:39:28. Contact: .shear nailing ok to cover ext 10/31/2001 9:05:04 AM
|
BLD-Framing/Rough-in | 10/29/2001 | 10/29/2001 | 10/29/2001 | P | FAIL |
Russ Owen
|
|
|
###-#### DAVID. No plans on site posted c/n also check plans when on site for north wall shear and floor to floor straps. 10/29/2001 2:37:54 PM
|
BLD-Framing/Rough-in | 10/26/2001 | 10/26/2001 | 10/26/2001 | P | FAIL |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 10/26/2001 at 09:01:02. Contact: ###-####. shear nailing not per plans 10/26/2001 1:18:29 PM
|
BLD-Framing/Rough-in | 10/24/2001 | 10/24/2001 | 10/24/2001 | P | FAIL |
Jim Storey
|
|
|
###-#### nailling not done/ missing floor to floor straps west wall. 10/24/2001 4:15:13 PM
|
BLD-Aging Inspection | 10/22/2001 | 10/22/2001 | 10/22/2001 | | PASS |
Jim Storey
|
|
|
wip 10/22/2001 9:21:44 AM
|
BLD-Foundation | 8/17/2001 | 8/20/2001 | 8/20/2001 | A | PASS |
Jim Storey
|
|
|
david ###-####
|
BLD-Footing | 7/30/2001 | 7/30/2001 | 7/30/2001 | P | PART |
Tony Young
|
|
|
###-####
wip, verbal corrections/warnings
7/30/2001 1:38:06 PM
|
Issue PAID IN FULL permit | | | 7/18/2001 | | DONE |
|
|
|
|
Plan assigned to (DJO) | 7/16/2001 | 7/16/2001 | 7/17/2001 | | PASS |
Dan Overy
|
|
|
7/17/2001 10:52:59 DJO - activity updated through activity BLDA022 from case BLD01-01729.
|
Plan Reviewer's activity | | | 7/17/2001 | | PEND |
|
|
|
plans have been red-lined to the point that only one approved set will be issued. no master file will be approved until all red-lines and corrections are incorportated into plan sets by builders designer. cantilevered grill porch and roof system are encroaching setbacks and accross property line. will check with planner for compliance.
|
Plan Reviewer's activity | | | 7/17/2001 | | DONE |
|
|
|
spoke with zoning about eave overhangs and grill porch and have red-lined plans to show one (1) hour protection and removal of portion of porch.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/17/2001 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 7/17/2001 | | |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 7/17/2001 | | DONE |
|
|
|
|
Plan Review Report | | | 7/17/2001 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 7/17/2001 | | DONE |
|
|
|
|
Telephone call | | | 7/17/2001 | | DONE |
|
|
|
LEFT MESS THAT PERMIT IS READY
|
Plans ACCEPTED BY PLAN CHECK | | | 7/16/2001 | | |
|
|
|
|
Routing - PLANNING | 6/26/2001 | 6/26/2001 | 7/11/2001 | | PASS |
|
|
|
Streetscape does not comply with Design Review conditions, particularly fencing along Highland Street. Phoned Bill Hodges; informed him that fencing needs to be added at existing (recently constructed) houses/MARTY SIGNED OFF 7/11/2001/PE
|
Routing - PUBLIC WORKS | 7/11/2001 | | 7/11/2001 | | PASS |
|
|
|
|
Application received | | | 6/26/2001 | | |
|
|
|
|
Routing - PLAN CHECK | 7/11/2001 | 7/11/2001 | | | PEND |
|
|
|
|
Pending Assignment by DJO | 6/26/2001 | | | | PEND |
Dan Overy
|
|
|
|