Permanent occupancy UNPAID FEE | | | 7/3/2002 | | DONE |
|
|
|
Perm. Occ. Cert. #4730 issued 7-3-02 to Western Aircraft.
|
Permanent Occupancy | | 6/27/2002 | 6/27/2002 | | DONE |
|
|
|
|
Fee Review-notes | 6/29/2001 | 6/29/2001 | 4/26/2002 | | DONE |
|
|
|
talked to Tom William gave dollar amount and told him we needed achd impact fee also
|
Temporary occupancy | | | 2/19/2002 | | PART |
|
|
|
Temp. Occ. Cert. #4730 issued 2-19-02 to Western Aircraft.
|
BLD-Final | 12/13/2001 | 12/13/2001 | 12/13/2001 | A | PASS |
Jim Storey
|
|
|
Added by Inspector: 301 On 12/13/2001 9:24:43 AM final ok upon sign off from p/z. and plm for perrm occ.
|
Code Occupancy Approval | | | 11/16/2001 | | FAIL |
|
|
|
NEEDS GRASS SO TO POST $220.OO BOND FOR OCCUPANCY.
|
FIRE-Final Inspection | 11/15/2001 | 11/15/2001 | 11/15/2001 | P | PASS |
Troy Cobbley
|
|
|
OK for perm occ. Structural please verify restroom door hardware change out 11/15/2001 4:12:42 PM
|
BLD-Final | 11/14/2001 | 11/14/2001 | 11/14/2001 | P | FAIL |
Jim Storey
|
|
|
###-#### KEN need sign offs. 11/15/2001 9:50:37 AM
|
BLD-Final | 11/13/2001 | 11/13/2001 | 11/13/2001 | P | FAIL |
Troy Cobbley
|
|
|
install correct building address, install one fire extinguisher, provide exit sign at west exit, change door hardware to approved type on all doors, add ADA restroom signs, add emergency lighting 11/13/2001 5:16:12 PM
|
BLD-Other | 10/24/2001 | 10/25/2001 | 10/25/2001 | A | FAIL |
Steven Webb
|
|
|
blocking for moduler home ###-#### ken c/n issued--piers not on approved footings. 10/25/2001 9:43:52 AM
|
BLD-Foundation | 10/25/2001 | 10/25/2001 | 10/25/2001 | P | PASS |
Carl Dependahl
|
|
|
###-#### KEN OK PER 420 10/25/2001 3:43:10 PM
|
BLD-Footing | 10/16/2001 | 10/17/2001 | 10/17/2001 | A | DONE |
Russ Owen
|
|
|
###-####. allready insp. 10/17/2001 11:45:31 AM
|
BLD-Foundation | 10/16/2001 | 10/17/2001 | 10/17/2001 | A | PASS |
Russ Owen
|
|
|
###-####
|
BLD-Footing | 10/16/2001 | 10/16/2001 | 10/16/2001 | P | PASS |
Steven Webb
|
|
|
Scheduled by Inspector: 420 On 10/16/2001 12:38:00 PM
|
Issue PAID IN FULL permit | | | 10/10/2001 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/21/2001 | | DONE |
|
|
|
|
Print Occupancy Form | | | 9/21/2001 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 9/21/2001 | | |
|
|
|
|
Telephone call | | | 9/21/2001 | | DONE |
|
|
|
|
Plan assigned to (MLO) | 7/23/2001 | | 9/21/2001 | | PASS |
Mike Otto
|
|
|
9/21/2001 09:55:35 MLO - activity updated through activity BLDA022 from case BLD01-01775.
|
Routing - FIRE | 9/18/2001 | | 9/19/2001 | | PASS |
|
|
|
Resubmitted plans from 8/31/01
|
Routing - PLAN CHECK | 9/18/2001 | | 9/18/2001 | | PASS |
|
|
|
|
Routing - PLANNING | 9/12/2001 | | 9/17/2001 | | PASS |
|
|
|
Resubmitted plans from 8/31/01, Approved as per CZC01-00081 and as per ADA parking and required off-street parking indicated by applicant's respresentative in transmittal date stamped received 8/31/2001.
|
Routing - PLUMBING | 9/17/2001 | | 9/17/2001 | | PASS |
|
|
|
Resubmitted plans from 8/31/01 PROVIDE A DCVA ON SERVICE PIPING, CLEAN OUT REQUIRED ON SEWER AT 100' MAX.
|
Routing - PUBLIC WORKS | 9/4/2001 | | 9/12/2001 | | PASS |
|
|
|
Resubmitted plans from8/31/01 Brian M. may request routing to airport. KMM
|
Plan resubmittals received | | | 8/31/2001 | | DONE |
|
|
|
Received revised 1. Two site plan * stamped and signed.
2. Two copies of letter to Brian Murphy regarding drainage
3. Two copies of O & M Plan
4. Two copies of unstamped and unsigned site and stair and ramp detail 11x17
5. Two copies of F1 sheet 11x17
6. Two copies of modular plans dated 6-8-01
7. One copy of revised application.
Routed to Mike O. KMM
|
Telephone call | | | 8/24/2001 | | DONE |
|
|
|
Received a call from Tom Williams stating that resubs should be to us by tuesday Aug. 28th. I let Mike Otto know. KMM
|
Plan Review Completed(1st rev) | | | 8/15/2001 | | FAIL |
|
|
|
|
Routing - FIRE | 8/9/2001 | | 8/15/2001 | | FAIL |
|
|
|
hydrant location & water supply
|
Routing - PLAN CHECK | 8/3/2001 | | 8/9/2001 | | FAIL |
|
|
|
corrections mailed and faxed to architect
|
Plan resubmittals requested | | | 8/9/2001 | | FAIL |
|
|
|
UBC corrections
|
Routing - PUBLIC WORKS | 8/2/2001 | | 8/3/2001 | | PASS |
|
|
|
|
Routing - AIRPORT | 7/23/2001 | | 8/3/2001 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 7/23/2001 | | 8/1/2001 | | FAIL |
|
|
|
requires drainage plan letter per Brian Murphy
|
Routing - PLANNING | 8/1/2001 | | 8/1/2001 | | PASS |
|
|
|
Approved as per CZC01-00081.
|
Pending Assignment by JCM | 7/2/2001 | | 7/23/2001 | | DONE |
John Menard
|
|
|
7/23/01 09:10:15 JCM - activity updated through activity BLDA174 from case BLD01-01775.
|
Plans ACCEPTED BY PLAN TECH | | | 7/23/2001 | | DONE |
|
|
|
|
Telephone call | | | 7/12/2001 | | DONE |
|
|
|
Spoke with Tom Williams about requirements for his submittal..Tom stated they had to comply with the Airport / PW. I informed him to be sure the airport signs the plans approved on the cover sheet if they are actually approved. At that point we will accept and start routing. kmm
|
Plan routing begun/NEW & ADDTN | | | 7/2/2001 | | HOLD |
|
|
|
see action A006
|
Plans ACCEPTED BY PLAN TECH | | | 7/2/2001 | | FAIL |
|
|
|
Requires 1. Stamped and signed Architectural sheets.
2. Revised project description
3. Stair and ramp details
4. Grading and drainage plans, calcs and O&M manual if not going on existing pavement. Per Brian Murphy of PW.
5. Involved parties sheet needs to be signed.
6. No code data on cover sheet of plans.
left message with Ken Hawk at ###-####. Spoke with David Irish of W.H. Pacific (Civil Engineer for project.) and Tom Williams Arch. of record, also faxed info to Tom Williams.. Plans on my table. KMM
|
Application received | | | 6/29/2001 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 6/29/2001 | | DONE |
|
|
|
|
Received Certificate of Value | | | 6/29/2001 | | DONE |
|
|
|
|