BLD-Final | 4/15/2004 | 4/16/2004 | 4/16/2004 | A | PASS |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 4/15/2004 at 1:15:45 PM. Contact: ###-####.
|
DOC - Permit Finaled | 4/16/2004 | 4/16/2004 | 4/16/2004 | A | PASS |
Troy James
|
|
|
Finaled by inspector at 4/16/2004 10:06:56 AM
|
BLD-Final | 3/10/2004 | 3/11/2004 | 3/11/2004 | A | FAIL |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 3/10/2004 at 12:55:32 PM. Contact: ###-####. Gave home owner a correction notice on site. 3/10/2004 11:26:03 PM
|
BLD-Other | 11/3/2003 | 11/3/2003 | 11/3/2003 | P | PART |
Russ Owen
|
|
|
Phone conference with Bill, ###-####. Requested a $40,000.00 bond for concrete flatwork. This project will be ok for a LC, with bonding conditon stated on LC, when bond is posted and other outstanding code requirements have been completed.
|
BLD - Request for Extension | 10/31/2003 | 10/31/2003 | 10/31/2003 | P | DONE |
Russ Owen
|
|
|
###-#### dale Ok to extend permit work near completion. 10/30/2003 8:02:26 PM
|
BLD-Final | 10/13/2003 | 10/15/2003 | 10/15/2003 | A | FAIL |
Russ Owen
|
|
|
scott; Phone #: ###-#### Internet Inspection Request from: Annette Moore went over requirements for a final , one item needed is paved driveway. also some other items . 10/15/2003 5:06:35 PM
|
BLD-Conference | 7/1/2003 | 7/1/2003 | 7/1/2003 | P | PART |
Russ Owen
|
|
|
SCOTT; Phone #: ###-#### Internet Inspection Request from: Annette Moore. went over egress from basement. 7/1/2003 5:20:22 PM
|
BLD-Conference | 4/25/2003 | 4/25/2003 | 4/25/2003 | P | PART |
Russ Owen
|
|
|
SCOTT; Phone #: ###-#### Internet Inspection Request from: Darla DownsWiil need 36 min at 1st landing for guard rail. 4/25/2003 1:26:28 PM
|
BLD-Energy code compliance | 2/14/2003 | 2/18/2003 | 2/18/2003 | P | PASS |
Jim Sly
|
|
|
###-####
|
BLD-Framing/Rough-in | 2/7/2003 | 2/7/2003 | 2/7/2003 | P | PASS |
Russ Owen
|
|
|
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung. All items complete , Note has interior drywall shear contractor notified. 2/7/2003 4:03:40 PM
|
BLD-Framing/Rough-in | 2/5/2003 | 2/6/2003 | 2/6/2003 | A | FAIL |
Russ Owen
|
|
|
steve; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie. C/N posted on on front window. 2/6/2003 2:31:30 PM
|
BLD-Framing/Rough-in | 1/7/2003 | 1/8/2003 | 1/8/2003 | A | FAIL |
Russ Owen
|
|
|
###-#### exterior nailing. still has shear panel at left of front door need perimeter staples contractor on site will recall this when coplete warned of re-inspection fee if not done.by next inspection. 1/8/2003 4:54:46 PM
|
BLD-Framing/Rough-in | 1/6/2003 | 1/7/2003 | 1/7/2003 | A | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 01/06/2003 at 13:57:53. Contact: . c/n posted 2 add staples/nails above 3 hold downs. also need to insulate basement walls as went over with contractor. 1/7/2003 10:53:48 AM
|
BLD-Foundation | 12/3/2002 | 12/4/2002 | 12/4/2002 | A | FAIL |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 12/03/2002 at 11:55:50. Contact: ###-####. shear at house not foundation, posted c/n. 12/4/2002 3:48:45 PM
|
BLD-Conference | 11/22/2002 | 11/22/2002 | 11/22/2002 | A | FAIL |
Russ Owen
|
|
|
Stoped by job and notified and posted c/n to remove paper at areas that have been sided with out approval. NOTE THIS IS A FULLY ENGINEERED STRUCTURE. and may require engineer of record to sign off. Called and left a message with steve l and home owner on site. 11/22/2002 10:35:57 AM
|
BLD-Conference | 11/22/2002 | 11/22/2002 | 11/22/2002 | A | CANC |
Russ Owen
|
|
|
|
BLD-Footing | 10/11/2002 | 10/11/2002 | 10/11/2002 | P | PART |
Russ Owen
|
|
|
Phone #: ###-#### Internet Inspection Request from: Amy Lawson
|
BLD-Foundation | 10/4/2002 | 10/4/2002 | 10/4/2002 | P | PART |
Jim Storey
|
|
|
###-#### ###-#### wall at east end of house aprox. 40 ln/ft pwoi. 10/4/2002 4:01:11 PM
|
BLD-Foundation | 8/26/2002 | 8/26/2002 | 8/26/2002 | P | PART |
Russ Owen
|
|
|
jed- ###-####
|
BLD-Foundation | 8/19/2002 | 8/19/2002 | 8/19/2002 | P | PART |
Russ Owen
|
|
|
###-#### 1/2 of house walls. 8/19/2002 3:28:27 PM
|
BLD-Footing | 8/12/2002 | 8/13/2002 | 8/13/2002 | A | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 08/12/2002 at 09:27:02. Contact: ###-####.ok about 80 percent of footing for home complete. 8/13/2002 11:12:21 AM
|
BLD-Framing/Rough-in | 7/24/2002 | 7/25/2002 | 7/25/2002 | P | PASS |
Jim Sly
|
|
|
STEVE ; Phone #: ###-####
|
BLD-Framing/Rough-in | 7/22/2002 | 7/23/2002 | 7/23/2002 | A | FAIL |
Russ Owen
|
|
|
steve ; Phone #: ###-#### 2 bld'sneed truss det , a bolts. 7/23/2002 12:15:35 PM
|
BLD-Foundation | 6/27/2002 | 6/27/2002 | 6/27/2002 | P | PART |
Russ Owen
|
|
|
found wall- jed ###-#### Ok pending engineers approval. 6/27/2002 4:57:54 PM
|
BLD-Foundation | 6/27/2002 | 6/27/2002 | 6/27/2002 | P | PART |
Russ Owen
|
|
|
found wall- jed ###-#### . ok pending engineers approval. 6/27/2002 4:59:19 PM
|
BLD-Footing | 6/21/2002 | 6/21/2002 | 6/21/2002 | P | PART |
Russ Owen
|
|
|
JED ###-#### portion of basement. 6/21/2002 4:28:34 PM
|
BLD-Foundation | 6/4/2002 | 6/5/2002 | 6/5/2002 | A | PART |
Tom Arcoraci
|
|
|
###-#### JED
|
BLD-Foundation | 5/31/2002 | 5/31/2002 | 5/31/2002 | P | CANC |
Russ Owen
|
|
|
###-#### jed. needed to pour at 12, engineer has approved via site visit. 5/31/2002 4:13:47 PM
|
BLD-Foundation | 5/28/2002 | 5/28/2002 | 5/28/2002 | P | PART |
Russ Owen
|
|
|
###-####-jed found top of retaining wall. 5/28/2002 4:03:07 PM
|
BLD-Foundation | 5/23/2002 | 5/23/2002 | 5/23/2002 | P | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 05/23/2002 at 08:15:21. Contact: ###-####.retaining wall , engineer also performed inspection. 5/23/2002 4:00:46 PM
|
BLD-Footing | 5/15/2002 | 5/16/2002 | 5/16/2002 | A | PASS |
Russ Owen
|
|
|
ft insp- jed- ###-#### Retaining wall. 5/16/2002 12:26:05 PM
|
BLD-Foundation | 5/6/2002 | 5/6/2002 | 5/6/2002 | P | PART |
Russ Owen
|
|
|
###-#### JED . poured appears ok, 5:40 pm , had meeting this day unable to make before 5:00. 5/6/2002 6:42:17 PM
|
BLD-Foundation | 5/2/2002 | 5/2/2002 | 5/2/2002 | P | PASS |
Russ Owen
|
|
|
###-#### JED wall 5/2/2002 4:28:32 PM 5/2/2002 4:28:46 PM
|
BLD-Footing | 5/1/2002 | 5/1/2002 | 5/1/2002 | P | PASS |
Russ Owen
|
|
|
jed ###-#### ft. garage footing. 5/1/2002 4:38:03 PM
|
BLD-Footing | 4/24/2002 | 4/25/2002 | 4/25/2002 | P | CANC |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 04/24/2002 at 11:48:24. Contact: ###-####.
|
BLD-Footing | 4/19/2002 | 4/19/2002 | 4/19/2002 | P | PASS |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 04/19/2002 at 09:24:19. Contact: ###-####. footing for rv storage. 4/19/2002 4:53:35 PM
|
Inspection Record Card- Bld | | | 4/18/2002 | | |
|
|
|
|
BLD-Conference | 4/1/2002 | 4/1/2002 | 4/1/2002 | A | PART |
Russ Owen
|
|
|
Slow progress. Work will begin in May.
|
BLD-Aging Inspection | 1/21/2002 | 1/21/2002 | 1/21/2002 | | PART |
Russ Owen
|
|
|
no insp called 1/22/2002 4:43:01 PM
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/22/2001 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 10/22/2001 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 10/22/2001 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 10/22/2001 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 7/3/2001 | | 10/22/2001 | | DONE |
|
|
|
|
Plan assigned to (SAM) | 7/12/2001 | | 10/22/2001 | | PASS |
Steve Munroe
|
|
|
10/22/2001 09:43:59 SAM - activity updated through activity BLDA022 from case BLD01-01778.
|
Case Summary (BLD) | | | 10/19/2001 | | |
|
|
|
|
Plan Review Report | | | 10/19/2001 | | |
|
|
|
|
Plan resubmittals received | | | 9/25/2001 | | PEND |
|
|
|
9/25/01 10:50 Steve Larando brought in new plans. The house has been modified and will need to be routed again to Planning and Zoning and Public Works. Plans are in my office.
|
Plan Reviewer's activity | | | 7/26/2001 | | PEND |
|
|
|
7/26/01 13:40 I talked with Trey Hoff. He and Tim, the engineer, met this morning on the plans. He will get me a list of things to change on the plans next Thursday, 8/2/01.
|
Pending Assignment by DJO | 7/2/2001 | | 7/12/2001 | | DONE |
Dan Overy
|
|
|
7/12/2001 07:58:42 SAM - activity updated through activity BLDA183 from case BLD01-01778.
|
Routing - PUBLIC WORKS | 7/2/2001 | | 7/3/2001 | | PASS |
|
|
|
|
Application received | | | 7/2/2001 | | |
|
|
|
|
Routing - PLANNING | 7/2/2001 | | 7/2/2001 | | PASS |
|
|
|
|