BLD-Final | 1/14/2002 | 1/15/2002 | 1/15/2002 | P | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 01/14/2002 at 16:18:32. Contact: ###-####. c/n made ok.final ok. 1/15/2002 3:17:15 PM
|
DOC - Permit Finaled | 1/15/2002 | 1/15/2002 | 1/15/2002 | P | PASS |
Jim Storey
|
|
|
Finaled by inspector at 1/15/2002 3:17:18 PM
|
BLD-Final | 1/10/2002 | 1/11/2002 | 1/11/2002 | A | FAIL |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 01/10/2002 at 12:23:05. Contact: ###-####. c/n on site 1/11/2002 10:27:39 AM
|
BLD-Framing/Rough-in | 10/25/2001 | 10/25/2001 | 10/25/2001 | P | PART |
Carl Dependahl
|
|
|
###-#### MIKE FINAL AND READY TO DRY WALL...add blocking at joists/brg walls near crawl access & insul rim/pony walls, chk at final...need temp glazing by gar. stair upper landing. ok to rock. 10/25/2001 2:54:48 PM
|
BLD-Energy code compliance | 10/25/2001 | 10/25/2001 | 10/25/2001 | P | PART |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 10/25/2001 2:55:27 PM add insul at crawl/rim
|
BLD-Framing/Rough-in | 10/22/2001 | 10/22/2001 | 10/22/2001 | P | PASS |
Jim Storey
|
|
|
###-#### mike framing c/n made ok. 10/22/2001 2:14:36 PM
|
BLD-Conference | 10/18/2001 | 10/19/2001 | 10/19/2001 | P | PASS |
Jim Storey
|
|
|
###-#### JANE
|
BLD-Framing/Rough-in | 10/18/2001 | 10/18/2001 | 10/18/2001 | P | FAIL |
Jim Sly
|
|
|
###-####
NR 10/18/2001 4:59:31 PM
|
BLD-Framing/Rough-in | 10/3/2001 | 10/4/2001 | 10/4/2001 | A | PART |
Steven Webb
|
|
|
###-#### SHEAR--ok to side lower floor--re-inspection needed on shear panels upstairs. 10/4/2001 9:40:57 AM
|
BLD-Framing/Rough-in | 10/4/2001 | 10/4/2001 | 10/4/2001 | P | PASS |
Dave Hannah
|
|
|
###-#### MIKE SHEER PANEL ok to cover ext 10/4/2001 3:30:47 PM
|
BLD-Foundation | 8/13/2001 | 8/14/2001 | 8/14/2001 | A | PASS |
Jim Storey
|
|
|
###-#### jed walls ok 8/14/2001 9:56:34 AM
|
BLD-Footing | 8/9/2001 | 8/9/2001 | 8/9/2001 | P | PART |
Tom Arcoraci
|
|
|
###-#### WIP 8/9/2001 2:48:08 AM
|
Issue PAID IN FULL permit | | | 8/1/2001 | | DONE |
|
|
|
|
Plan assigned to (DJO) | 7/11/2001 | 7/11/2001 | 7/12/2001 | | PASS |
Dan Overy
|
|
|
7/12/2001 11:58:51 DJO - activity updated through activity BLDA022 from case BLD01-01781.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/12/2001 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 7/12/2001 | | DONE |
|
|
|
|
Telephone call | | | 7/12/2001 | | DONE |
|
|
|
called Windsor Homes permit is ready for pickup
|
Plans ACCEPTED BY PLAN CHECK | | | 7/11/2001 | | |
|
|
|
|
Plan Reviewer's activity | | | 7/11/2001 | | PEND |
|
|
|
started review 7-11-01 early morning. this structure has problems with beam/hdr failure, inadequate brg. pads, missing brg. pads, incorrect stair system and lack of other information (roof frame clarity, call-outs for girder not indicated)
|
Print Pending Permit.LaserJet4 | | | 7/11/2001 | | PEND |
|
|
|
|
Plan Review Report | | | 7/11/2001 | | PEND |
|
|
|
|
Routing - PLANNING | 7/2/2001 | 7/2/2001 | 7/3/2001 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 7/2/2001 | 7/2/2001 | 7/3/2001 | | PASS |
|
|
|
|
Application received | | | 7/2/2001 | | |
|
|
|
|
Routing - PLAN CHECK | 7/3/2001 | 7/3/2001 | | | PEND |
|
|
|
|
Pending Assignment by DJO | 7/2/2001 | | | | PEND |
Dan Overy
|
|
|
|