Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD01-01784
StatusFinaled
Name KICK'S 66 (CARWASH)
Site Address 530 N FIVE MILE RD
Project NameKICKS 66
Customer Number 
ePlanReviewNo
Description
(KICK'S 66)(CARWASH)To construct a new 960 sq.ft. free standing car wash building with related equipment. All construction per the approved plans and attached comment list. NOTE: This permit does not cover the installation of the fuel island canopy and related pumps. MJP DRH01-00040 CUP01-00024 CAR01-00013 PC#536-01 Grading permit Bld01-01794 routing under separate set of plans.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Letter of compliance  6/27/2002 DONE
Letter of Compliance #22538 issued 6-27-02.
BLD-Final6/18/20026/18/20026/18/2002 DONE
Final - ok/perm. occ.
Fee Review-notes7/2/20017/2/20011/29/2002 DONE
org. values were to high baumgart faxed over a
BLD-Final12/28/200112/28/200112/28/2001PPART
DetailsRuss Owen
Ok for temporary oc, needs all other signatures on card for a perm oc ,note there are 3 permits on this job , carwash,builing/store and fuel island. 12/28/2001 3:16:02 PM
Temporary occupancy  12/28/2001 PART
Temp. Occ. Cert. #4694 issued 12-28-01 to Kick's 66 for the car wash bldg.
BLD-Final12/19/200112/20/200112/20/2001ANR
DetailsRuss Owen
###-####
BLD-Final12/18/200112/19/200112/19/2001PNR
DetailsRuss Owen
###-####. needs other req signatures 12/19/2001 4:29:35 PM
FIRE-Final Inspection12/17/200112/18/200112/18/2001APASS
DetailsTroy Cobbley
life/safety finaled 12/18/2001 10:59:27 AM
BLD-Framing/Rough-in11/7/200111/7/200111/7/2001PPASS
DetailsRuss Owen
###-#### carwash roof. 11/7/2001 3:33:02 PM
BLD-Foundation10/31/200111/1/200111/1/2001ACANC
DetailsRuss Owen
###-#### justin
BLD-Concrete10/26/200110/26/200110/26/2001PPASS
DetailsRuss Owen
###-#### justin
BLD-Framing/Rough-in10/24/200110/25/200110/25/2001APART
DetailsRuss Owen
justin ###-#### block wall. Has been poured appears ok. 10/25/2001 11:09:54 AM
BLD-Concrete10/25/200110/25/200110/25/2001PPART
DetailsRuss Owen
###-####. poured appears ok. Contractor notified not to pour any more w-o approval, This does not require special insp. 10/25/2001 4:43:27 PM
BLD-Framing/Rough-in10/24/200110/24/200110/24/2001PNR
DetailsTom Arcoraci
###-#### steel
BLD-Foundation10/23/200110/23/200110/23/2001PPART
DetailsTom Arcoraci
###-#### masonary wip ok 10/23/2001 3:00:59 PM
BLD-Foundation10/8/200110/9/200110/9/2001ANR
DetailsRuss Owen
###-#### justin
BLD-Footing9/13/20019/14/20019/14/2001PPART
DetailsRuss Owen
fd- justin ###-#### partial on carwash. 9/14/2001 4:55:11 PM
BLD-Footing9/11/20019/12/20019/12/2001ANR
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 09/11/2001 at 15:46:22. Contact: ###-####.
BLD-Footing9/12/20019/12/20019/12/2001PCANC
DetailsRuss Owen
###-####
Print Occupancy Form  9/10/2001 DONE
Inspection Record Card- Bld  9/10/2001 DONE
(F) Reprint permit  9/7/2001 DONE
Inspection Record Card- Bld  9/7/2001 DONE
Print Occupancy Form  9/7/2001 DONE
Issue PAID IN FULL permit  9/6/2001  
Inspection Record Card- Bld  9/4/2001 DONE
Print Occupancy Form  9/4/2001 DONE
Telephone call  9/4/2001 DONE
left mess that permit is ready
Plan Reviewer's activity  8/31/2001 PASS
Print Pending Permit.LaserJet4  8/31/2001 DONE
PLANS/APPL TAKEN TO FRONT DESK  8/31/2001 DONE
Case Summary (BLD)  8/31/2001 DONE
Routing - PLAN CHECK8/28/2001 8/31/2001 DONE
Plan assigned to (M_P)7/3/2001 8/31/2001 PASS
DetailsMike Phillips
8/31/2001 13:19:10 M_P - activity updated through activity BLDA022 from case BLD01-01784.
Plan resubmittals received  8/30/2001 DONE
Received two copies of revised sheetA.3, A5, A.9, CW.3 Routed to Mike P. KMM
Plan Reviewer's activity  8/29/2001 PEND
Waiting for convenience store items to be completed prior to issuing permits.
Routing - FIRE8/23/2001 8/28/2001 PASS
Routing - PLUMBING8/20/2001 8/22/2001 PASS
Routing - PLAN CHECK8/13/2001 8/17/2001 HOLD
Hold. Waiting for resubmittals from architect to respond to plan review corrections.
Plan resubmittals received  8/17/2001 DONE
Plans redrawn and resubmitted in their entirety to address all corrections and additional changes by architect. Forwarded to Mike Phillips.
Plan Review Completed(1st rev)  8/13/2001 FAIL
Routing - FIRE8/8/2001 8/13/2001 FAIL
hydrant flow, landscape obstrucing hydrant
Routing - PUBLIC WORKS8/7/2001 8/8/2001 PASS
Routing - PLAN CHECK7/13/2001 8/2/2001 FAIL
Routing to fire.
Plan Reviewer's activity  8/2/2001 FAIL
Additional information required for further review.
Print Pending Permit.LaserJet4  8/2/2001  
Routing - PUBLIC WORKS7/23/2001 7/24/2001 FAIL
Requires drainage plan revision per Brian Murphy. 7/24/01 DAR
Routing - PLUMBING7/10/2001 7/13/2001 FAIL
GREASE INTERCEPTOR VENT MUST BE LOCATED DOWNSTREAM OF DISCHARGE DIPTUBE, PROVIDE PLUMBING PLANS FOR THE CARWASH. WATER SERVICE LOCATION ON PAGE P.2 DOES NOT MATCH PAGE C.3, VERIFY AND REVISE, CARWASH ENTERANCE DRAIN MUST BE COVERED, IF INSTALLED, PER PRETREATMENT REQUIREMENTS, PROVIDE A FLOOR SINK FOR FILTERED WATER R.P., AND ANY OTHER EQUIPMENT ISOLATION R.P.s, USE INTERCEPTOR DETAIL ATTACHED FOR GREASE INTERCEPTOR, ADD ADDITIONAL VENT TO UPSTREAM COMPARTMENT, VENTED SEPARATLY THRU THE ROOF, FOR THE CARWASH INTERCEPTOR.
Routing - PLANNING7/9/2001 7/10/2001 PASS
Approved by SAR and TKW per CUP01-24 & DRH01-40
Routing - PUBLIC WORKS7/3/2001 7/9/2001 FAIL
brian m. failed, requires drainage plan revisions
Plan routing begun/NEW & ADDTN  7/3/2001 DONE
Plans ACCEPTED BY PLAN TECH  7/3/2001 DONE
Received Certificate of Value  7/2/2001 DONE
Override - Parcel Holds  7/2/2001  
Recd Pcfee & Taken To Pln CK  7/2/2001 DONE
Application received  7/2/2001