BLD-Aging Inspection | 5/5/2003 | 5/5/2003 | 5/5/2003 | | PASS |
Jim Storey
|
|
|
ubc 106.4 no responce from fire dept. to complet job. 5/5/2003 8:30:45 AM
|
DOC - Permit Expired | 5/5/2003 | 5/5/2003 | 5/5/2003 | A | PASS |
Jim Storey
|
|
|
Expired by inspector at 5/5/2003 8:30:47 AM
|
BLD-Aging Inspection | 3/3/2003 | 3/3/2003 | 3/3/2003 | | PART |
Jim Storey
|
|
|
kent jhonson e-mailled to complet sign offs. refered to by jeff reamy of fire dept. 3/5/2003 2:28:15 PM
|
BLD-Framing/Rough-in | 4/4/2002 | 4/4/2002 | 4/4/2002 | P | PART |
Jim Storey
|
|
|
dave- ###-#### ceiling grid combustables removed from ceilling c/n made ok. 4/5/2002 9:41:10 AM
|
BLD-Conference | 3/18/2002 | 3/20/2002 | 3/20/2002 | P | PART |
Jim Storey
|
|
|
1:00 pm ###-#### Curt c/n stads for resolve. 3/20/2002 2:27:09 PM
|
BLD-Framing/Rough-in | 3/13/2002 | 3/14/2002 | 3/14/2002 | A | PASS |
Jim Storey
|
|
|
Scheduled by Inspector: 301 On 3/13/2002 4:33:11 PM walls and hard lid ok to cover. trusses ok. 3/14/2002 11:00:37 AM
|
BLD-Framing/Rough-in | 3/13/2002 | 3/13/2002 | 3/13/2002 | P | FAIL |
Jim Storey
|
|
|
fr dave ###-#### need truss engineering and leadger at ceilling framing steel joist at frame wall. 3/13/2002 4:35:14 PM
|
BLD-Concrete | 2/11/2002 | 2/11/2002 | 2/11/2002 | P | PART |
Jim Storey
|
|
|
dave ###-#### 4' to 8' rebar ok 2/11/2002 1:50:36 PM
|
BLD-Other | 2/6/2002 | 2/7/2002 | 2/7/2002 | A | PASS |
Jim Storey
|
|
|
GROUT DAVE - ###-#### first 48 " lift rebar ok. 2/7/2002 9:54:23 AM
|
Telephone call | | | 2/1/2002 | | DONE |
|
|
|
Called Russ Phillips to have someone pick up plans and take to jobsite. He told me that he will call the contractor.
|
BLD-Framing/Rough-in | 1/28/2002 | 1/28/2002 | 1/28/2002 | P | FAIL |
Jim Storey
|
|
|
CELING GRID ###-#### DAVE need mech insp and approved plan on site. 1/28/2002 2:50:01 PM
|
Plan resubmittals received | | | 1/17/2002 | | DONE |
|
|
|
Received two set of resubmitted plans. Contacted Russ Phillips to let him know that one copy has to go on site. The other approved copy went to records. kmm
|
BLD-Foundation | 12/27/2001 | 12/27/2001 | 12/27/2001 | P | PASS |
Dave Hannah
|
|
|
###-####
|
BLD-Footing | 12/20/2001 | 12/21/2001 | 12/21/2001 | A | PASS |
Steven Webb
|
|
|
###-#### herb ###-####
|
Issue & PRINT permit | | | 11/2/2001 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 10/3/2001 | | DONE |
|
|
|
|
Print Occupancy Form | | | 10/3/2001 | | DONE |
|
|
|
|
Telephone call | | | 10/3/2001 | | DONE |
|
|
|
Paul ###-####
|
Routing - PLAN CHECK | 9/26/2001 | | 10/1/2001 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/1/2001 | | DONE |
|
|
|
|
Plan assigned to (MLO) | 7/12/2001 | | 10/1/2001 | | PASS |
Mike Otto
|
|
|
10/1/2001 10:21:04 MLO - activity updated through activity BLDA022 from case BLD01-01863.
|
Plan resubmittals received | | | 9/26/2001 | | DONE |
|
|
|
Received two copies of revised sheets A2.1, A2.2, A6.1, A7.2, A7.3, routed to Mike O. kmm
|
Routing - PLAN CHECK | 8/31/2001 | | 9/5/2001 | | FAIL |
|
|
|
handicapped requirements not met. Architect contacted
|
Plan resubmittals requested | | | 9/5/2001 | | FAIL |
|
|
|
Handicapped requirements
|
Plan resubmittals received | | | 8/31/2001 | | DONE |
|
|
|
Received two copies of revised sheets A7.1 and S1.1. one copy of response letter and one copy of supplimental structural calculations. Routed to Mike O. KMM
|
Routing - FIRE | 8/20/2001 | | 8/22/2001 | | PASS |
|
|
|
|
Plan Review Completed(1st rev) | | | 8/22/2001 | | FAIL |
|
|
|
|
Routing - PLAN CHECK | 8/14/2001 | | 8/20/2001 | | FAIL |
|
|
|
corrections faxed and mailed to architect
|
Plan resubmittals requested | | | 8/20/2001 | | FAIL |
|
|
|
UBC corrections
|
Routing - PLANNING | 8/3/2001 | | 8/14/2001 | | PASS |
|
|
|
Approved as per CUP01-00094. Appeal period expired on 8/13/01.
|
Routing - PLAN CHECK | 7/17/2001 | | 8/3/2001 | | ---- |
|
|
|
Recirculate to Planning as CUP01-00094 is now approved.
|
Routing - PLUMBING | 7/17/2001 | | 7/17/2001 | | PASS |
|
|
|
VERIFY THERMOL EXPANTION PROTECTION, P-1 MUST BE ELONGATED BOWL WITH AN OPEN FRONT SEAT.
|
Routing - PUBLIC WORKS | 7/12/2001 | | 7/13/2001 | | PASS |
|
|
|
|
Routing - PLANNING | 7/12/2001 | 7/12/2001 | 7/12/2001 | | FAIL |
|
|
|
Need a CU mod for expansion per Scott Spjute.
|
Telephone call | | | 7/12/2001 | | DONE |
|
|
|
Called and left message for Jeff Ramey, ext. 3961. fire dept.
|
Plans ACCEPTED BY PLAN TECH | | | 7/12/2001 | | PEND |
|
|
|
Requires CU mod. However we will accept plans and start routing. Route to P&Z last. Routed to PW even though I received no civil sheets, per Brian M. KMM
|
Received Certificate of Value | | | 7/12/2001 | | DONE |
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 7/12/2001 | | DONE |
|
|
|
|
Application received | | | 7/11/2001 | | |
|
|
|
|
Fee Review-notes | 7/11/2001 | 7/11/2001 | | | |
|
|
|
|