Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD01-01863
StatusExpired
Name BOISE FIRE DEPARTMENT
Site Address 2202 S GEKELER LN
Project NameFIRE STATION #3
Customer Number99107
ePlanReviewNo
Description
Boise Fire Department Station #3 * Remodel the existing fire station inlcluding a handicapped restroom and to construct a 700 sq.ft. one story addition per approved plans and attachments. PC#570-01
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Aging Inspection5/5/20035/5/20035/5/2003 PASS
DetailsJim Storey
ubc 106.4 no responce from fire dept. to complet job. 5/5/2003 8:30:45 AM
DOC - Permit Expired5/5/20035/5/20035/5/2003APASS
DetailsJim Storey
Expired by inspector at 5/5/2003 8:30:47 AM
BLD-Aging Inspection3/3/20033/3/20033/3/2003 PART
DetailsJim Storey
kent jhonson e-mailled to complet sign offs. refered to by jeff reamy of fire dept. 3/5/2003 2:28:15 PM
BLD-Framing/Rough-in4/4/20024/4/20024/4/2002PPART
DetailsJim Storey
dave- ###-#### ceiling grid combustables removed from ceilling c/n made ok. 4/5/2002 9:41:10 AM
BLD-Conference3/18/20023/20/20023/20/2002PPART
DetailsJim Storey
1:00 pm ###-#### Curt c/n stads for resolve. 3/20/2002 2:27:09 PM
BLD-Framing/Rough-in3/13/20023/14/20023/14/2002APASS
DetailsJim Storey
Scheduled by Inspector: 301 On 3/13/2002 4:33:11 PM walls and hard lid ok to cover. trusses ok. 3/14/2002 11:00:37 AM
BLD-Framing/Rough-in3/13/20023/13/20023/13/2002PFAIL
DetailsJim Storey
fr dave ###-#### need truss engineering and leadger at ceilling framing steel joist at frame wall. 3/13/2002 4:35:14 PM
BLD-Concrete2/11/20022/11/20022/11/2002PPART
DetailsJim Storey
dave ###-#### 4' to 8' rebar ok 2/11/2002 1:50:36 PM
BLD-Other2/6/20022/7/20022/7/2002APASS
DetailsJim Storey
GROUT DAVE - ###-#### first 48 " lift rebar ok. 2/7/2002 9:54:23 AM
Telephone call  2/1/2002 DONE
Called Russ Phillips to have someone pick up plans and take to jobsite. He told me that he will call the contractor.
BLD-Framing/Rough-in1/28/20021/28/20021/28/2002PFAIL
DetailsJim Storey
CELING GRID ###-#### DAVE need mech insp and approved plan on site. 1/28/2002 2:50:01 PM
Plan resubmittals received  1/17/2002 DONE
Received two set of resubmitted plans. Contacted Russ Phillips to let him know that one copy has to go on site. The other approved copy went to records. kmm
BLD-Foundation12/27/200112/27/200112/27/2001PPASS
DetailsDave Hannah
###-####
BLD-Footing12/20/200112/21/200112/21/2001APASS
DetailsSteven Webb
###-#### herb ###-####
Issue & PRINT permit  11/2/2001 DONE
Inspection Record Card- Bld  10/3/2001 DONE
Print Occupancy Form  10/3/2001 DONE
Telephone call  10/3/2001 DONE
Paul ###-####
Routing - PLAN CHECK9/26/2001 10/1/2001 PASS
PLANS/APPL TAKEN TO FRONT DESK  10/1/2001 DONE
Plan assigned to (MLO)7/12/2001 10/1/2001 PASS
DetailsMike Otto
10/1/2001 10:21:04 MLO - activity updated through activity BLDA022 from case BLD01-01863.
Plan resubmittals received  9/26/2001 DONE
Received two copies of revised sheets A2.1, A2.2, A6.1, A7.2, A7.3, routed to Mike O. kmm
Routing - PLAN CHECK8/31/2001 9/5/2001 FAIL
handicapped requirements not met. Architect contacted
Plan resubmittals requested  9/5/2001 FAIL
Handicapped requirements
Plan resubmittals received  8/31/2001 DONE
Received two copies of revised sheets A7.1 and S1.1. one copy of response letter and one copy of supplimental structural calculations. Routed to Mike O. KMM
Routing - FIRE8/20/2001 8/22/2001 PASS
Plan Review Completed(1st rev)  8/22/2001 FAIL
Routing - PLAN CHECK8/14/2001 8/20/2001 FAIL
corrections faxed and mailed to architect
Plan resubmittals requested  8/20/2001 FAIL
UBC corrections
Routing - PLANNING8/3/2001 8/14/2001 PASS
Approved as per CUP01-00094. Appeal period expired on 8/13/01.
Routing - PLAN CHECK7/17/2001 8/3/2001 ----
Recirculate to Planning as CUP01-00094 is now approved.
Routing - PLUMBING7/17/2001 7/17/2001 PASS
VERIFY THERMOL EXPANTION PROTECTION, P-1 MUST BE ELONGATED BOWL WITH AN OPEN FRONT SEAT.
Routing - PUBLIC WORKS7/12/2001 7/13/2001 PASS
Routing - PLANNING7/12/20017/12/20017/12/2001 FAIL
Need a CU mod for expansion per Scott Spjute.
Telephone call  7/12/2001 DONE
Called and left message for Jeff Ramey, ext. 3961. fire dept.
Plans ACCEPTED BY PLAN TECH  7/12/2001 PEND
Requires CU mod. However we will accept plans and start routing. Route to P&Z last. Routed to PW even though I received no civil sheets, per Brian M. KMM
Received Certificate of Value  7/12/2001 DONE
Plan routing begun/NEW & ADDTN  7/12/2001 DONE
Application received  7/11/2001  
Fee Review-notes7/11/20017/11/2001