BLD-Final | 11/14/2001 | 11/16/2001 | 11/16/2001 | A | PASS |
Tony Young
|
|
|
###-#### GEORGE
|
DOC - Permit Finaled | 11/16/2001 | 11/16/2001 | 11/16/2001 | A | PASS |
Tony Young
|
|
|
Finaled by inspector at 11/16/2001 10:55:15 AM
|
BLD-Framing/Rough-in | 9/18/2001 | 9/19/2001 | 9/19/2001 | A | PASS |
Tony Young
|
|
|
###-#### GEORGE
energy code ok also 9/19/2001 10:52:26 AM
|
BLD-Foundation | 8/30/2001 | 8/31/2001 | 8/31/2001 | A | PART |
Tony Young
|
|
|
kim- ###-####- found
wip, ok w/ verbal corrections, also need to verify ground clearance to framing 8/31/2001 9:26:57 AM
|
BLD-Footing | 8/28/2001 | 8/28/2001 | 8/28/2001 | P | PART |
Tony Young
|
|
|
###-#### KIM PLEASE CALL BEFORE GOING OUT
ok to pour after verbal corrections are done 8/28/2001 4:51:45 PM
|
BLD-Conference | 8/16/2001 | 8/17/2001 | 8/17/2001 | A | PASS |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 08/16/2001 at 15:29:20. Contact: ###-####.
conf. on having no inspections on structural or any electrical permits. Structure is framed and part way sheet rocked, new contracter has verified that ftgs are about 12" deep w/ only 6" of crawl space via phone call after I left... told them to obtain proper permits, remove material to see what is there, recall inspection and go from there. 8/17/2001 11:24:58 AM
|
Inspection Record Card- Bld | | | 8/17/2001 | | DONE |
|
|
|
|
Application received | | | 7/12/2001 | | |
|
|
|
|
Plan assigned to (PEP) | 7/12/2001 | | 7/12/2001 | | PASS |
Perry Paine
|
|
|
7/12/2001 09:43:04 PEP - activity updated through activity BLDA022 from case BLD01-01866.
|
Inspector's copy Bld permit | | | 7/12/2001 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/12/2001 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 7/12/2001 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 7/12/2001 | | DONE |
|
|
|
|