DOC - Permit Finaled | 10/29/2002 | 10/29/2002 | 10/29/2002 | A | PASS |
Tom Arcoraci
|
|
|
Finaled by inspector at 10/29/2002 9:02:31 AM
|
BLD-Final | 8/1/2002 | 8/2/2002 | 8/2/2002 | A | PASS |
Dave Hannah
|
|
|
JOE; Phone #: ###-#### 8/2/2002 11:07:59 AM ok for c.c 8/2/2002 11:08:20 AM
|
FIRE-Final Inspection | 8/1/2002 | 8/1/2002 | 8/1/2002 | P | PASS |
Troy Cobbley
|
|
|
fire life/safety finaled. The fire alarm signature in non applicable 8/1/2002 2:47:58 PM
|
CHANGE STATUS TO (ISS) | | | 8/1/2002 | | DONE |
|
|
|
|
Fee Review-notes | 7/13/2001 | 7/13/2001 | 6/24/2002 | | DONE |
|
|
|
6/20-Left mesg. with GC owner and will call me back monday (need value of owner supplied gener.)
|
Code Occupancy Approval | 4/17/2002 | 4/17/2002 | 4/17/2002 | A | DONE |
Carol Montgomery
|
|
|
Scheduled by Inspector: CAM On 4/17/02 8:40:24 AMMeets compliance 4/17/02 11:22:08 AM
|
FIRE-Final Inspection | 4/15/2002 | 4/16/2002 | 4/16/2002 | P | FAIL |
Troy Cobbley
|
|
|
provide fire extinguisher in generator room and at the fuel tank mounted at 48" and with current inspection tags, provide fuel tank sign off by Boise Fire Dept. 4/16/2002 3:34:27 PM
|
BLD-Foundation | 2/15/2002 | 2/15/2002 | 2/15/2002 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 02/15/2002 at 10:59:26. Contact: ###-####.rebar for walls 2/15/2002 4:12:04 PM
|
BLD-Foundation | 1/28/2002 | 1/29/2002 | 1/29/2002 | A | PASS |
Dave Hannah
|
|
|
###-####
|
BLD-Footing | 1/23/2002 | 1/24/2002 | 1/24/2002 | P | PASS |
Dave Hannah
|
|
|
###-#### vern
|
Issue PAID IN FULL permit | | | 1/2/2002 | | DONE |
|
|
|
|
Telephone call | | | 12/3/2001 | | DONE |
|
|
|
talked to paul ralstead/client putting on hold until 1st of year/mls
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/17/2001 | | PASS |
|
|
|
|
Print Occupancy Form | | | 10/17/2001 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 10/17/2001 | | DONE |
|
|
|
|
Telephone call | | | 10/17/2001 | | DONE |
|
|
|
permit ready
|
Plan assigned to (CJW) | 7/19/2001 | | 10/17/2001 | | PASS |
Carl Westfall
|
|
|
10/17/01 10:16:03 CJW - activity updated through activity BLDA022 from case BLD01-01881.
|
Routing - PLAN CHECK | 9/17/2001 | | 10/17/2001 | | PASS |
|
|
|
(9-17-01) Waiting for resolution of structural issues. See conditions list. (10-17-01) Resubmittal by architect and engineer resolved remaining issues. See conditions list.
|
Plan resubmittals received | | | 10/16/2001 | | DONE |
|
|
|
received two copies of revised sheets a-2, 1 copy of revised letter, 2 copies of structural calcs. routed to carl westfall.
|
Routing - FIRE | 9/14/2001 | | 9/17/2001 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 8/3/2001 | | 9/11/2001 | | |
|
|
|
Failed 2nd UBC review. Asked for modifications to the design calculations.
|
Plan resubmittals received | | | 9/10/2001 | | DONE |
|
|
|
Received two copies of revised sheets A-0, A-1, A-2, ME-1A, one copy of cover letter and two copies of struct. calcs. Routed to Carl W. KMM
|
Routing - FIRE | 7/31/2001 | | 8/3/2001 | | |
|
|
|
Failed first UFC review. Hydrant location & flow required. UST App, & above ground tank App
|
Plan Review Completed(1st rev) | | | 8/3/2001 | | |
|
|
|
Failed first UBC and UFC reviews.
|
Routing - PLAN CHECK | 7/23/2001 | | 7/31/2001 | | |
|
|
|
Failed first UBC review.
|
Plan Reviewer's activity | | | 7/30/2001 | | |
|
|
|
Failed first UBC review. UBC plan review started July 30, 2001 and finished the next day. A response from the architect was required. See the conditions list.
|
Routing - PLANNING | 7/20/2001 | | 7/23/2001 | | PASS |
|
|
|
Susan Riggs.
|
Routing - PUBLIC WORKS | 7/19/2001 | | 7/20/2001 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 7/13/2001 | | |
|
|
|
|
Application received | | | 7/13/2001 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 7/13/2001 | | DONE |
|
|
|
|