Fee Review-notes | 7/13/2001 | 7/13/2001 | 6/20/2002 | | DONE |
|
|
|
|
Code Occupancy Approval | 12/7/2001 | 12/7/2001 | 12/7/2001 | P | PASS |
Wm. Michael Meloy
|
|
|
Scheduled by Inspector: WMM On 12/7/2001 2:19:16 PM
|
Letter of compliance | | | 12/7/2001 | | DONE |
|
|
|
Letter of Compliance #22084 issued 12-7-01.
|
Code Occupancy Approval | | | 12/7/2001 | | PASS |
|
|
|
|
BLD-Conference | 12/4/2001 | 12/4/2001 | 12/4/2001 | P | FAIL |
Wm. Michael Meloy
|
|
|
Scheduled by Inspector: WMM On 12/4/2001 12:43:30 PM. I met with Curtis (Curt) Prater, Wireless Facilities, 2401 S. Applem J 106, ###-#### and cell ###-####. The site was inspected for Occupancy and it was noted that the painting has not been completed on the southeast corner of the dwelling. This portion was due to be completed by Friday, weather permiting. I provided Curt Prater with information on Bonding for Temp Occupancy. r 12/4/2001 12:48:21 PM
|
Code Occupancy Approval | | | 12/4/2001 | | FAIL |
|
|
|
Painting of building not completed. Contractor to determine if he needs a Temp Occupancy or not.
|
BLD-Final | 11/30/2001 | 12/3/2001 | 12/3/2001 | A | CANC |
Russ Owen
|
|
|
###-#### ###-####
|
BLD-Conference | 12/3/2001 | 12/3/2001 | 12/3/2001 | P | FAIL |
Russ Owen
|
|
|
###-#### CURT PLEASE CALL FIRST. 12/3/2001 11:28:25 AM. needs f-t ratings at penetrations and zoning approval. 12/3/2001 5:04:15 PM
|
FIRE-Alarm Testing | 11/27/2001 | 11/30/2001 | 11/30/2001 | A | PASS |
Troy Cobbley
|
|
|
Fire sprinkler, fire alarm finaled. OK for perm occ 11/30/2001 12:58:13 PM
|
BLD-Framing/Rough-in | 11/19/2001 | 11/20/2001 | 11/20/2001 | A | DONE |
Dave Hannah
|
|
|
###-#### ROOF talked with contractor and hilty rep about how and what they are going to use to seal up penatrations in roof ok to cover 11/20/2001 11:01:57 AM
|
BLD-Framing/Rough-in | 10/24/2001 | 10/24/2001 | 10/24/2001 | P | PART |
Russ Owen
|
|
|
###-#### JUSTIN . called contractor he will supply approval from eng for pins at bottom track for subst of puddle welds. 10/24/2001 4:57:27 PM
|
BLD-Framing/Rough-in | 10/22/2001 | 10/22/2001 | 10/22/2001 | P | CANC |
Russ Owen
|
|
|
###-#### justin 10-22-01 justin called in to canc this inspection....dld
|
BLD-Framing/Rough-in | 10/18/2001 | 10/19/2001 | 10/19/2001 | A | PART |
Russ Owen
|
|
|
###-#### JUSTIN. Bottom trac attached with steel pins not welds as per plan ,waiting for engineer approval. 10/19/2001 12:09:52 PM
|
BLD-Footing | 10/2/2001 | 10/3/2001 | 10/3/2001 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 10/02/2001 at 12:19:54. Contact: ###-####. spec insp needed on steel 10/3/2001 1:51:42 PM
|
BLD-Foundation | 10/2/2001 | 10/3/2001 | 10/3/2001 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 10/02/2001 at 12:21:33. Contact: ###-####. spec insp needed on steel 10/3/2001 1:52:00 PM
|
BLD-Framing/Rough-in | 9/28/2001 | 10/2/2001 | 10/2/2001 | P | NR |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 09/28/2001 at 15:46:08. Contact: ###-####.
|
BLD-Foundation | 9/28/2001 | 10/2/2001 | 10/2/2001 | P | NR |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 09/28/2001 at 15:54:37. Contact: ###-####.
|
Issue PAID IN FULL permit | | | 9/18/2001 | | DONE |
|
|
|
|
(F) Reprint permit | | | 9/18/2001 | | |
|
|
|
|
Routing - PLAN CHECK | 9/12/2001 | | 9/13/2001 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/13/2001 | | PASS |
Ron Hill
|
|
|
|
Print Occupancy Form | | | 9/13/2001 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 9/13/2001 | | DONE |
|
|
|
|
Telephone call | | | 9/13/2001 | | DONE |
|
|
|
|
Plan assigned to (R_H) | 7/19/2001 | | 9/13/2001 | | PASS |
|
|
|
9/13/2001 07:44:53 RMH - activity updated through activity BLDA022 from case BLD01-01885.
|
Routing - FIRE | 9/7/2001 | | 9/12/2001 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 9/7/2001 | | 9/7/2001 | | PASS |
|
|
|
|
Plan Review Report | | | 9/7/2001 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 9/7/2001 | | DONE |
|
|
|
|
Plan resubmittals received | | | 9/5/2001 | | DONE |
|
|
|
Received two copies of revised sheets A-2.1, S1, S2, S3, two copies response letter, attachment 1 and 2. Routed to Ron Hill. KMM
|
Routing - PLAN CHECK | 8/31/2001 | | 9/4/2001 | | FAIL |
|
|
|
faxed requirements to Architect. 9-04-01
|
Plan Review Report (Fail) | | | 9/4/2001 | | |
|
|
|
|
Plan Review Report (Fail) | | | 9/4/2001 | | DONE |
|
|
|
|
Routing - FIRE | 8/24/2001 | 8/28/2001 | 8/31/2001 | | FAIL |
Bill Alexander
|
|
|
Lack detail meeting/verifiying Article 64 and 80.
|
Plan Review Completed(1st rev) | | | 8/31/2001 | | DONE |
Bill Alexander
|
|
|
|
Plan resubmittals received | | | 8/30/2001 | | DONE |
|
|
|
Received revised sheets T-1, A-1.0, A-1.1, A-2.0, A-2.1, A-2.2, A-3.0, A-3.1, A-4.0, A-5.0, A-6.0, S1, S2, S3, and two copies of response letter. Routed to Ron Hill. KMM
|
Routing - PLAN CHECK | 7/17/2001 | | 8/24/2001 | | FAIL |
Ron Hill
|
|
|
Failed in building plan review. Faxed copy of report to architect. Routed to fire
|
Plan Review Report | | | 8/23/2001 | | DONE |
|
|
|
|
Plan Review Report | | | 8/22/2001 | | DONE |
|
|
|
|
Routing - PLANNING | 7/19/2001 | | 7/19/2001 | | PASS |
|
|
|
Sev Jones. Approved per CAA01-00163 conditions of approval.
|
Application received | | | 7/13/2001 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 7/13/2001 | | DONE |
|
|
|
|