BLD-Final | 8/6/2002 | 8/7/2002 | 8/7/2002 | A | PASS |
Russ Owen
|
|
|
post card mailed
|
DOC - Permit Finaled | 8/7/2002 | 8/7/2002 | 8/7/2002 | A | PASS |
Tony Young
|
|
|
Finaled by inspector at 8/7/2002 10:33:00 AM
|
PostCard Mailed | | | 8/3/2002 | | SENT |
|
|
|
PostCard has been mailed requesting inspection.
|
BLD-Final | 1/30/2002 | 1/31/2002 | 1/31/2002 | A | NR |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 01/30/2002 at 07:41:54. Contact: ###-####.
|
BLD-Final | 1/31/2002 | 1/31/2002 | 1/31/2002 | P | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 01/31/2002 at 06:32:24. Contact: ###-####.
c/n still posted on stairs, waiting for material to complete, also finishing up on 1 hr fire protection in mech. room, c of c issued for bank purposes only, owner and contractor both acknowledge 1/31/2002 1:37:13 PM
|
BLD-Grading Inspection | 1/18/2002 | 1/18/2002 | 1/18/2002 | | BOND |
Rita DeYoung
|
|
|
Grading is conditionally approved upon receipt of a $1500.00 bond to ensure satisfactory completion of fine grading, revegetation and a retaining wall on the east side of the property.
|
BLD-Final | 1/18/2002 | 1/18/2002 | 1/18/2002 | P | FAIL |
Dave Hannah
|
|
|
###-#### c/n on site 1/18/2002 4:06:36 PM
|
BLD-Final | 1/17/2002 | 1/17/2002 | 1/17/2002 | P | FAIL |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 01/17/2002 at 08:17:32. Contact: ###-####.need trades signed offf, including Terry Records on hillside 1/17/2002 3:23:17 PM
|
BLD-Aging Inspection | 1/7/2002 | 1/7/2002 | 1/7/2002 | | PART |
Tony Young
|
|
|
wip 1/7/2002 10:01:39 AM
|
BLD-Energy code compliance | 11/7/2001 | 11/7/2001 | 11/7/2001 | A | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 11/07/2001 at 06:58:39. Contact: ###-####. walls, floor ok 11/7/2001 3:38:44 PM
|
BLD-Framing/Rough-in | 11/5/2001 | 11/5/2001 | 11/5/2001 | P | PASS |
Dave Hannah
|
|
|
###-####
|
BLD-Framing/Rough-in | 11/2/2001 | 11/2/2001 | 11/2/2001 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 11/02/2001 at 09:00:37. Contact: ###-####. c/n on site ok to insulate 11/2/2001 3:13:37 PM
|
BLD-Framing/Rough-in | 10/31/2001 | 11/1/2001 | 11/1/2001 | A | FAIL |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 10/31/2001 at 07:43:09. Contact: ###-####.need trades signed off 1st, no inspection made 11/1/2001 11:01:50 AM
|
BLD-Framing/Rough-in | 10/25/2001 | 10/26/2001 | 10/26/2001 | P | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 10/25/2001 at 18:45:00. Contact: ###-####.
ext shear ok 10/29/2001 8:51:22 AM
|
BLD-Framing/Rough-in | 10/17/2001 | 10/17/2001 | 10/17/2001 | A | FAIL |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 10/17/2001 at 07:00:26. Contact: ###-####.need letter of compliance on shear and holddowns as built from structural engineer 10/17/2001 12:05:08 PM
|
BLD-Framing/Rough-in | 10/16/2001 | 10/16/2001 | 10/16/2001 | P | FAIL |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 10/16/2001 at 09:09:10. Contact: ###-####.no plans///not all the way done 10/17/2001 8:23:30 AM
|
BLD-Foundation | 9/5/2001 | 9/6/2001 | 9/6/2001 | A | PART |
Tony Young
|
|
|
verify found, and arch. approval 9/5/2001 2:23:50 PMverbal ok/fix from arch. pending letter 9/6/2001 12:17:36 PM
|
BLD-Foundation | 9/5/2001 | 9/5/2001 | 9/5/2001 | P | PART |
Tony Young
|
|
|
BILL ###-####
need fix or approval for mis-layout from arch. 9/5/2001 1:24:07 PM
|
BLD-Footing | 8/16/2001 | 8/16/2001 | 8/16/2001 | P | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 08/16/2001 at 08:43:50. Contact: ###-####.
wip, verbal corrections/warnings 8/16/2001 1:45:04 PM
|
Inspection Record Card- Bld | | | 8/14/2001 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 8/14/2001 | | DONE |
|
|
|
|
Plan assigned to (DJO) | 8/8/2001 | 8/8/2001 | 8/13/2001 | | PASS |
Dan Overy
|
|
|
8/13/2001 16:27:11 DJO - activity updated through activity BLDA022 from case BLD01-01889.
|
Plan Reviewer's activity | | | 8/13/2001 | | DONE |
|
|
|
sections received. ok to issue.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/13/2001 | | DONE |
|
|
|
|
Plan Reviewer's activity | | | 8/9/2001 | | PEND |
|
|
|
will issue permit when stamped sheets showing section of grid line B, sections sk1 thru sk4 and detailed framing for tall walls are received. one additional site plan will be submitted.
|
Case Summary (BLD) | | | 8/9/2001 | | PEND |
|
|
|
|
Plan Review Report | | | 8/9/2001 | | PEND |
|
|
|
|
Plans ACCEPTED BY PLAN CHECK | | | 8/8/2001 | | |
|
|
|
|
Routing - PLANNING | 7/27/2001 | 7/27/2001 | 7/30/2001 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 7/13/2001 | 7/13/2001 | 7/27/2001 | | DONE |
|
|
|
|
Routing - PUBLIC WORKS GRADING | 7/13/2001 | 7/13/2001 | 7/26/2001 | | PASS |
Rita DeYoung
|
|
|
Approved as Category 1 with conditions of approval in letter attached to plan.
|
Application received | | | 7/13/2001 | | |
|
|
|
|
Routing - PLAN CHECK | 7/30/2001 | 7/30/2001 | | | PEND |
|
|
|
|
Pending Assignment by DJO | 7/13/2001 | | | | PEND |
Dan Overy
|
|
|
|