BLD-Final | 12/11/2001 | 12/12/2001 | 12/12/2001 | A | PASS |
Steven Webb
|
|
|
###-#### c. of c. #20963 issued. 12/12/2001 9:15:15 AM
|
DOC - Permit Finaled | 12/12/2001 | 12/12/2001 | 12/12/2001 | A | PASS |
Steven Webb
|
|
|
Finaled by inspector at 12/12/2001 9:15:18 AM
|
BLD-Final | 12/7/2001 | 12/7/2001 | 12/7/2001 | P | FAIL |
Jim Storey
|
|
|
###-#### north unit smoke dector no working. 12/12/2001 8:20:06 AM
|
BLD-Final | 12/4/2001 | 12/5/2001 | 12/5/2001 | A | FAIL |
Jim Storey
|
|
|
###-#### SCHALLER fire stop ceilling of garage/ charge fire door/ instal strucal post at front entry. 12/5/2001 12:29:44 PM
|
BLD-Footing | 10/11/2001 | 10/12/2001 | 10/12/2001 | A | PASS |
Jim Storey
|
|
|
insp done under bld01-01915
|
BLD-Foundation | 10/11/2001 | 10/12/2001 | 10/12/2001 | A | PASS |
Jim Storey
|
|
|
|
BLD-Framing/Rough-in | 10/11/2001 | 10/12/2001 | 10/12/2001 | A | PASS |
Jim Storey
|
|
|
|
BLD-Energy code compliance | 10/11/2001 | 10/12/2001 | 10/12/2001 | A | PASS |
Jim Storey
|
|
|
|
Issue PAID IN FULL permit | | | 10/11/2001 | | DONE |
|
|
|
|
Telephone call | | | 9/19/2001 | | DONE |
|
|
|
LEFT VOICE MESSAGE 9-19-01///DLD
|
Inspection Record Card- Bld | | | 8/9/2001 | | DONE |
|
|
|
|
Plan assigned to (SAM) | 7/16/2001 | 7/16/2001 | 8/8/2001 | | PASS |
Steve Munroe
|
|
|
8/8/2001 15:24:11 SAM - activity updated through activity BLDA022 from case BLD01-01912.
|
Plan assigned to (SAM) | 7/25/2001 | | 8/8/2001 | | PASS |
Steve Munroe
|
|
|
8/8/2001 15:24:11 SAM - activity updated through activity BLDA022 from case BLD01-01912.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/8/2001 | | DONE |
|
|
|
|
Plan Reviewer's activity | | | 8/3/2001 | | PEND |
|
|
|
8/3/01 I received engineering the afternoon of 8/2/01. After reviewing the engineering I noticed there was not lateral engineering for the living room walls. There is gravity engineering. I called and left a message at 15:15 on 8/3/01, for Keith Jones to call me.
|
Plan Reviewer's activity | | | 7/25/2001 | | PEND |
|
|
|
7/25/01 14:40 Called and talked to Ted about the living room walls. I let him know that I need gravity and lateral engineering for the walls in the living room. Plan review on hold till I receive the engineering.
|
Print Pending Permit.LaserJet4 | | | 7/25/2001 | | |
|
|
|
|
Plan Review Report | | | 7/25/2001 | | |
|
|
|
|
Routing - PLANNING | 7/23/2001 | 7/23/2001 | 7/23/2001 | | PASS |
|
|
|
Approved per DRH01-00138 and DRH01-00139.
|
Routing - PUBLIC WORKS | 7/16/2001 | 7/16/2001 | 7/23/2001 | | DONE |
|
|
|
|
Routing - PLANNING | 7/16/2001 | 7/16/2001 | 7/20/2001 | | FAIL |
|
|
|
Driveway does not match the design as approved under Design Review with planter space between the two units.
Exterior elevations are identical to adjacent duplex per BLD01-01915; Design Review approved two different street facades.
|
Application received | | | 7/16/2001 | | |
|
|
|
|
Routing - PLAN CHECK | 7/23/2001 | 7/23/2001 | | | PEND |
|
|
|
|