Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD01-01943
StatusFinaled
Name QWEST (RESTROOM UPGRADE)
Site Address 1630 N MAPLE GROVE RD
Project NameQWEST
Customer Number 
ePlanReviewNo
Description
(QWEST - RESTROOM UPGRADE) This building is NOT fire sprinklered. To construct two restrooms accessible to the disabled within an existing 18,347 square foot telephone equipment building. Two existing restrooms will be demolished at the same location in the building. Work is to include interior nonbearing walls, suspended ceilings, floor finishes, wall finishes, interior doors, and fixtures all per approved drawings and plan review conditions on file. This permit is intended to satisfy the obligation under permit BLD01-01384 to upgrade the restrooms to be accessible to the disabled. NOTE - If a wall that is proposed to be demolished is discovered to be a bearing wall, the wall shall not be removed. New drawings accompanied by an engineered design shall be submitted to the Structural Inspector showing how the loads will be transfered to the footings. Work shall NOT proceed until approval is granted. PC-0605-01 **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  4/9/2010 DONE
DetailsSam Zahorka
Letter of compliance  11/1/2002 DONE
Letter of Compliance #22761 issued 11-1-02.
BLD-Final10/31/200210/31/200210/31/2002PPASS
DetailsJim Sly
call first ###-#### OK for Perm Occ. 10/31/2002 2:02:47 PM
FIRE-Final Inspection4/15/20024/16/20024/16/2002PPASS
DetailsTroy Cobbley
FIre life/safety finaled 4/16/2002 12:24:11 PM
BLD-Aging Inspection1/7/20021/7/20021/7/2002 DONE
DetailsDave Hannah
work in progress 1/7/2002 2:47:56 PM
BLD-Aging Inspection11/7/200111/7/200111/7/2001 DONE
DetailsDave Hannah
work in progress 11/7/2001 10:20:10 AM
BLD-Framing/Rough-in9/6/20019/7/20019/7/2001APASS
DetailsDave Hannah
dick ###-#### fr rest room walls ok to cover 9/7/2001 11:13:58 AM
BLD-Framing/Rough-in8/27/20018/27/20018/27/2001PPASS
DetailsDave Hannah
###-#### beams and post in break room ada rest rooms 8/27/2001 1:52:28 PM
Issue PAID IN FULL permit  8/14/2001 DONE
Routing - FIRE7/30/2001 8/12/2001 PASS
APPROVED WITHOUT WRITTEN COMMENT
Inspection Record Card- Bld  8/2/2001 DONE
Print Occupancy Form  8/2/2001 DONE
Telephone call  8/2/2001 DONE
left mess that permit is ready
Plan Review Completed(1st rev)  8/1/2001 PASS
Routing - PLAN CHECK8/1/2001 8/1/2001 PASS
PLANS/APPL TAKEN TO FRONT DESK  8/1/2001 PASS
Plan assigned to (CJW)7/20/2001 8/1/2001 PASS
DetailsCarl Westfall
8/1/01 15:24:29 CJW - activity updated through activity BLDA022 from case BLD01-01943.
Routing - PLAN CHECK7/25/2001 7/30/2001 PASS
Plan Reviewer's activity  7/30/2001 PASS
UBC plan review started July 30, 2001 and finished the same day. The drawings were approved with conditions. See the conditions list.
Routing - PUBLIC WORKS7/24/2001 7/25/2001 PASS
Plans ACCEPTED BY PLAN TECH  7/19/2001 DONE
First Notice7/18/20017/18/20017/18/2001 DONE
Application received  7/18/2001